Town Centre Mall
Homes here mostly date from the 1990s. 3 planning files on this house, the latest from 2018. Home extensions nearby almost always get approved (92%). A building site 207 m away stopped before it was finished.
How planning works, with this area's numbers
steps can overlap · medians for home extensions within 1.5 km, 10 years- 1ApplySite notice up, plans online
- 2Comments5 weeks, €20. Comment to keep your right to appeal
- 3Decision8 weeks by law. Here 52 days
- 4Appeal window4 weeks after the decision
- 5AppealHere about 4 months
- 6PermissionLasts 5 years
- 7StartStart notice to the council. Here about 3 months after
- 8Sign-offCompletion cert, or the owner opts out
What's the planning story of this house?
When it was built, and the rules since
Most homes here were built 1991–2000, under planning permission and building regulations. 3 planning files on this house, the latest from 2018.
Each line is a rule that applies to work done after it.
MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area
- 2018F18A/0283 · modifications to existing · refused 2018approvedstarted?signed off?
- 2015F14A/0451 · work already done · approved 2015 · work already doneapprovedstartedsigned off?
- 2013F12A/0406 · work already done · approved 2013 · work already doneapprovedstartedsigned off?
Zoning, protection, tax and flood: the detail
What it says
MC - Major Town Centre: Consolidate the existing Major Towns in the County, (Blanchardstown, Swords and Balbriggan). The aim is to further develop these centres by densification of appropriate commercial and residential developments ensuring a mix of commercial, recreational, civic, cultural, leisure, residential uses, and urban streets, while delivering a quality urban environment which will enhance the quality of life of resident, visitor and workers alike. The zone will strengthen retail provision in accordance with the County Retail Strategy, emphasise urban conservation, ensure priority for public transport, pedestrians and cyclists while minimising the impact of private car based traffic and enhance and develop the existing urban fabric. In order to deliver this vision and to provide a framework for sustainable development, masterplans will be prepared for each centre in accordance with the Urban Fingal Chapter objectives.
FINGAL_DP_OWN · — – —
What it says
MC - Major Town Centre: Protect, provide for and/ or improve major town centre facilities
The main town centre — retail, offices, civic uses, apartments.
the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029
Not on this site: conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.
Licensed industrial sites within 1.0 km: Sk Biotek Ireland Limited (262 m); Arch Chemicals BV (278 m)
| Within 500 m | Count | For example |
|---|---|---|
| Conservation areas | 1 | Swords - Church Road Historic Ecclesiastical Core ACA |
| Licensed industrial sites | 2 | Swords Laboratories; Arch Chemicals BV |
| Heritage inventory buildings | 26 | Swords Courthouse; Pastorville |
| Radon grid squares | 4 | |
| Protected buildings | 20 | Former Carnegie Library; One of pair of late 19th century semi-detached houses built for the teachers of New Borough Female School |
| Monuments | 26 | Castle - Anglo-Norman masonry castle; Ecclesiastical enclosure |
How we work this out
Sources: zoning, constraints.niah, constraints.radon, constraints.smr, constraints.smr_zones, epa_leap, rps.fingal, rzlt, constraints, constraints.aca, constraints.epa_licence, constraints.flood_cfram, constraints.rps · fetched 11 Oct 2026, 23:18
| Source | Licence | Fetched | Link |
|---|---|---|---|
| zoning | CC-BY-4.0 | 11 Oct 2026, 23:18 | open |
| constraints.niah | CC-BY-4.0 | 27 Sept 2026, 19:35 | open |
| constraints.radon | CC-BY-4.0 | 27 Sept 2026, 19:36 | open |
| constraints.smr | CC-BY-4.0 | 27 Sept 2026, 19:29 | open |
| constraints.smr_zones | CC-BY-4.0 | 27 Sept 2026, 19:34 | open |
| epa_leap | CC-BY-4.0 | 5 Oct 2026, 23:09 | open |
| rps.fingal | CC-BY-4.0 | — | open |
| rzlt | CC-BY-4.0 | 12 Oct 2026, 00:14 | open |
| constraints | mixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false) | 27 Sept 2026, 19:37 | open |
| constraints.aca | CC-BY-4.0 (Fingal); public/attribution, unconfirmed (DLR) | 27 Sept 2026, 19:36 | open |
| constraints.epa_licence | CC-BY-4.0 | 27 Sept 2026, 19:36 | open |
| constraints.flood_cfram | CC-BY-NC-ND-4.0 · not redistributable — shown as a flag only | 11 Sept 2026, 19:11 | open |
| constraints.rps | CC-BY-4.0 (Fingal); public/attribution, unconfirmed (DLR) | 27 Sept 2026, 19:36 | open |
How we work this out
Could you extend?
Nothing on this site restricts it: not protected, not in a conservation area.
What happened to applications like yours
Extensions here: 75–95% by type. A new house in a garden is harder: 67% approved, and 1 in 2 are asked for more information.
Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.
CalculatedOur classificationcouncil register via NPAD · 206 nearby, 4,536 council-wide
Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m
Extensions and refusals near you 2 extensions within 250 m · the last 12 months
| Kind | Applied | Approved | Refused |
|---|---|---|---|
| Dormer or attic | 1 | 1 | — |
| Other | 1 | 1 | — |
Refused within 100 m 0 in the last 12 months
Nothing refused this close in the last 12 months.
How we work this out
How long, and what if someone objects?
A home extension's journey here
A decision takes 52 days. 1 in 6 is asked for more information, which adds about 47 days. Building starts about 3 months after permission.
Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.
Calculated266 decided home extensions, 109 start notices, 72 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála
What appeals changed
11 of 37 appealed refusals became permissions. 4 of 37 appealed approvals were reversed.
Every appeal decided within 1.5 km in 10 years, any kind of development.
CalculatedAn Coimisiún Pleanála cases linked to the council file
Appeals nearby 3 in the last 12 months
1 of 1 changed the council's decision
- 501750 Open · Lands at the junction of Rathbeale Road and Watery Lane, Swords, Co.… · 402 m
- 500822 Granted · Islamic Community Centre Swords, The Green (Off Rathbeale Road),… · 422 m report
- 323850 Granted with conditions · The Lord Mayors Development located Main Street, Swords, Co. Dublin · 241 m report
What's changing around you?
- 1Units 1 & 2, Clonmel House F26A/0910E
- 2The Lord Mayor’s Public House, Main Street LRD0103/S3E
- 3Swords Pavilions Shopping Centre, Malahide Road F26A/0817E/R3
- 4The Copse, Millers Glen F14A/0486
- 50.1 ha zoned for homes
- 60.3 ha zoned for homes
- 70.2 ha zoned for homes
- 80.2 ha zoned for homes
- 90.1 ha zoned for homes
- 10The Arch Bar Restaurant & Public House, Main Street F26A/0140E
- 11Unit 7, Castle Shopping Centre F26A/0072E
- 12The Old Borough (A Protected Structure), 72-74 Main Street F26A/0556E
- 13Site at School House Lane, Coolbanagher F26A/0771E
- 14Carechoice Swords, Bridge Street F26A/0022E
- 15Well Road, School Lane F26A/0884E
What happens to applications within 500 m
Permission isn't building. Of 117 permissions since 2016, 50 show a start notice and 22 have a completion certificate.
Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.
Measured184 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates
The next 30 days
5 deadlines within 500 m; the first closes 16 Oct 2026.
- Comments close 16 Oct 20264 days left2LRD0103/S3E · application received — Amendments to a previously approved Strategic Housing Development (SHD) (ABP Reference…€20 to the council · 242 m away
- Comments close 20 Oct 20268 days left3F26A/0817E/R3 · application received — The development comprises the installation of 25no. roof-mounted Vertical-Axis Wind Turbines…€20 to the council · 367 m away
- Comments close 27 Oct 202615 days leftF26A/0856E · application received — Re-submitting application with amendments (reference no: F26A/0781E) Alterations to the exterior…€20 to the council · 219 m away
- Comments close 2 Nov 202621 days left15F26A/0884E · application received — The development will consist of change of use of an existing 2 storey brewery building know as…€20 to the council · 199 m away
- Comments close 12 Nov 202631 days left1F26A/0910E · application received — The development will consist of: The amalgamation of units 1 & 2 on the ground floor of Clonmel…€20 to the council · 18 m away
Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file
Approved, stalled or planned, not built yet
1 building site nearby stopped before sign-off. MetroLink is planned 537 m away.
Each row is a dated fact from a public register: no score and no forecast.
Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)
Sites that could change 11 within 500 m
Building site that stopped 1
- 4The Copse, Millers Glen · 35 homes, started Apr 2015, never signed off · 207 m
Empty land zoned for homes 10
- 50.1 ha zoned for homes · no homes built on it yet · 57 m
- 60.3 ha zoned for homes · no homes built on it yet · 124 m
- 70.2 ha zoned for homes · no homes built on it yet · 127 m
- 80.2 ha zoned for homes · no homes built on it yet · 200 m
- 90.1 ha zoned for homes · no homes built on it yet · 206 m
- 0.2 ha zoned for homes · no homes built on it yet · 233 m
- 0.2 ha zoned for homes · no homes built on it yet · 265 m
- 1.1 ha zoned for homes · no homes built on it yet · 272 m
- 0.1 ha zoned for homes · no homes built on it yet · 293 m
- 0.1 ha zoned for homes · no homes built on it yet · 325 m
Sources: acp, bcms, derelict, moderngov, npad, rzlt · fetched 9 Oct 2026, 23:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| acp | CC-BY-4.0 | 9 Oct 2026, 23:03 | open |
| bcms | CC-BY-4.0 | 12 Oct 2026, 00:09 | open |
| derelict | CC-BY-4.0 | 5 Oct 2026, 09:35 | open |
| moderngov | public | 12 Oct 2026, 01:27 | open |
| npad | CC-BY-4.0 | 12 Oct 2026, 01:44 | open |
| rzlt | CC-BY-4.0 | 12 Oct 2026, 00:14 | open |
Applications within 500 m, by year
Between 12 and 23 a year; busiest 2018. 78% of decisions were approvals.
2016 and 2026 are part years (*). Exemption requests and time extensions are left out.
Measuredcouncil register via NPAD
Open for comments €20 to comment
- 2The Lord Mayor’s Public House, Main Street, Swords, Co. Dublin comments close 16 Oct 2026Amendments to a previously approved Strategic Housing Development (SHD) (ABP Reference ABP-313223-22; Fingal…
- 3Swords Pavilions Shopping Centre, Malahide Road, Swords, Co. Dublin, K67 R7D0 comments close 20 Oct 2026The development comprises the installation of 25no. roof-mounted Vertical-Axis Wind Turbines (VAWTs) on the…
- 1Units 1 & 2, Clonmel House, Forster Way,, rear of 29 Main Street, Swords, Co. Dublin comments close 12 Nov 2026The development will consist of: The amalgamation of units 1 & 2 on the ground floor of Clonmel House, the…
Every application within 500 m 25 in the last 12 months
See every application on the map
- 15Well Road, School Lane, Swords, K67Y935 Other decisionThe development will consist of change of use of an existing 2 storey brewery building know as the Chalk Bar…
- 9 St Columcilles Park, Swords Demesne, Swords, K67K579 Other decisionRe-submitting application with amendments (reference no: F26A/0781E) Alterations to the exterior of front of…
- 9 St. Columcille's Park, Swords, Co. Dublin, K67 K579 Withdrawn or not validAlterations to the exterior of front of house including: - Increasing
- 13Site at School House Lane, Coolbanagher, Swords, Co. Dublin No decision yetPlanning Permission is sought for the construction of 14 no. apartment
- Schoolhouse Lane, Swords, Co. Dublin Withdrawn or not validThe construction of 14 no. apartments (6 no. 2-Bed units and 8 no. 1-B
- Swords Pavilions, Malahide Road, Swords, Co. Dublin, K67R7D0 ApprovedHammerson ICAV intends to apply for Temporary Permission for a period
- 6 Malahide Road, Swords, Co. Dublin No decision yetRivergate Property Swords Limited intend to apply for permission for d
- Hill Garden, Forest Road, Swords, Co. Dublin, K67 W8P9 ApprovedA single-storey extension to the side of the existing dwelling and ass
- 12The Old Borough (A Protected Structure), 72-74 Main Street, Swords, Co No decision yetJD Wetherspoon plc intend to apply for retention permission for develo
- 2 St Columcille's Park, Swords, Co. Dublin, K67 W218 Approved1/ Conversion of existing attic to storage area, with new dormer windo
- Lands at the junction of Rathbeale Road and Watery Lane, Swords, Co. D RefusedAlterations to development approved under Reg. Ref. F24A/1125E (ACP Re
- Pavilions Shopping Centre, Malahide Road, Co. Dublin, K67 R7D0 ApprovedThe development will consist of the installation of a photovoltaic sol
- 10The Arch Bar Restaurant & Public House, Main Street, Chapel Lane & Fos ApprovedThe development will consist of:
- 11Unit 7, Castle Shopping Centre, Bridge Street, Townparks, Swords, Co. ApprovedChange of use of the existing ground floor retail unit to a takeaway f
- 14Carechoice Swords, Bridge Street, Townparks, Swords, Co. Dublin, K67 F ApprovedThe proposed development will comprise; the construction of a single s
- Swords Pavilions, Malahide Road, Swords, Co. Dublin, K67 R7D0 RefusedTemporary Permission for a period of 5 years at this site (c. 1.1 Ha),
- The Arch Bar Restaurant & Public House, Main Street, Chapel Lane, Fost Withdrawn or not validThe development will consist of:
- Swords Pavilions Shopping Centre, R132 and R106 Malahide Road,, Swords Withdrawn or not validHammerson ICAV intends to apply for Temporary Permission for a period
- Pavilions Shopping Centre, Malahide Road, Swords, Co. Dublin, K67 YH26 Withdrawn or not validThe proposed development comprises the installation of 25 no. Vertical
- Swords Pavilions Shopping Centre, R132 and R106 Malahide Road, Swords, Withdrawn or not validHammerson ICAV intends to apply for Temporary Permission for a period
- 70, Saint Columba's Rise, Swords, Co. Dublin, K67 K6C3 Approved1) Conversion of existing single storey garage to provide for a home o
- 70 Saint Columba's Rise, Swords, Co. Dublin, K67 K6C3 Withdrawn or not validThe proposed development will consist of the following: 1) Conversion
How we work this out
Building work nearby 8 in the last 12 months
- 70 Saint Columba's Rise, Swords, Dublin, K67 K6C3 · 28 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · F25A/1099E · 383 m
- Unit G49, Pavilions Shopping Centre, Malahide Road, Swords, Co. Dublin K67 CC98, Swords, Dublin · 24 Aug 2026 · start notice not signed off · 349 m
- Unit G24, Pavilions Shopping Centre,, Swords, Dublin, K67A499 · 7 Jul 2026 · 7-day notice not signed off · 349 m
- Proposed Umai, Unit F23B, Pavilions Shopping Centre, Fingal, K67 YH26 · 12 Mar 2026 · 7-day notice signed off · 447 m
- 10 Oaklands Park, Swords, Fingal, K67 H283 · 6 Feb 2026 · 1 homes · short notice no sign-off needed · F25A/0831E · 90 m
- County Hall, Main Street, Swords, Fingal, K67 X8Y2 · 30 Jan 2026 · short notice no sign-off needed · 222 m
- 29/31 North Street, Swords, Fingal, K67 XY70 · 5 Jan 2026 · 7-day notice not signed off · 328 m
- Malahide Road, Swords, Fingal, K67 EY62 · 17 Nov 2025 · 7-day notice signed off · 447 m
How we work this out
Source: bcms · fetched 12 Oct 2026, 00:09
| Source | Licence | Fetched | Link |
|---|---|---|---|
| bcms | CC-BY-4.0 | 12 Oct 2026, 00:09 | open |
Homes coming 0 not started
- Main Street · 146 homes · building started · 346 m
How we work this out
Named places nearby: estate, schemes, crèches, schools
Named places estate, developments, inspections
Developments within 1.0 km
| Scheme | Homes | Progress | Distance |
|---|---|---|---|
| Forster Way and Chapel Lane | 79 | 79 not started (2026-Q2) | 30 m |
| Seatown Road Development | 36 | 36 being built (2026-Q2) | 202 m |
| Main Street | — | — | 239 m |
| Rathbeale Road and Watery Lane | 36 | 36 not started (2026-Q2) | 402 m |
| Barrysparks and Crowscastle (lands generally bound by the R1 | — | — | 565 m |
| The Estuary | 39 | no activity on site reported (2026-Q2) | 597 m |
| Swords Business Park | — | — | 600 m |
| Woodside | 34 | 34 not started (2026-Q2) | 713 m |
Who applies most nearby
- Hammerson ICAV — 6 applications, latest 15 Sept 2026
- L-Frack OBD Series Limited — 2 applications, latest 25 Aug 2026
Crèches and schools inspected
| Name | Latest inspection | Distance |
|---|---|---|
| Kids Inc. · Crèche | 18 Feb 2026 · report · Tusla Early Years Inspectorate | 479 m |
| Oaklands House Creche and Montessori · Crèche | 18 Jun 2024 · report · Tusla Early Years Inspectorate | 819 m |
| Kid-e-Winks Montessori · Crèche | 26 Feb 2025 · report · Tusla Early Years Inspectorate | 877 m |
How we work this out
Sources: dublin_pipeline, npad, organisations, schools, tusla_ey · fetched 5 Oct 2026, 23:01
| Source | Licence | Fetched | Link |
|---|---|---|---|
| dublin_pipeline | CC-BY-4.0 | 5 Oct 2026, 23:01 | open |
| npad | CC-BY-4.0 | 12 Oct 2026, 01:44 | open |
| organisations | n/a — derived; organisations only; DLR-sourced links withheld | 11 Oct 2026, 23:05 | — |
| schools | CC-BY-4.0 | 27 Sept 2026, 23:32 | open |
| tusla_ey | public (Tusla statutory register; acknowledgement required, no open licence stated) | 5 Oct 2026, 23:33 | open |
How busy is this area Busier than most of Fingal County Council.
How we work this out
What's the area like?
This street block against the council
19% owner-occupied (council 67%).
MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267135006/267135010
Schools, stops and the council
Schools
- Swords Borough NS · primary · 84 pupils · 198 m
- River Valley CNS · primary · 142 pupils · 322 m
- S N Cholmille B · primary · 320 pupils · 370 m
- S N Cholmcille C · primary · 326 pupils · 387 m
- Fingal Community College · postprimary · 864 pupils · 401 m
- Coláiste Choilm · postprimary · 421 pupils · 680 m
- St Finians Community College · postprimary · 671 pupils · 886 m
Stops 41
- Swords Village · 192, 197, 33B, 41, 41B, 41X · 12/hour at peak · 103 m
- Swords Castle · 192, 196, 197, 33, 33A, 33B · 19/hour at peak · 136 m
- Swords Castle · 192, 196, 197, 33, 33A, 33B · 15/hour at peak · 152 m
- Swords Village · 102, 102P, 196, 33, 41C, 500 · 12/hour at peak · 218 m
- Dublin Street · 500X · 1/hour at peak · 229 m
- Swords Village · 102, 102P, 196, 33, 33A, 33E · 10/hour at peak · 306 m
- Saint Columbas Rise · 192, 196, 197, 41, 41B, 41X · 6/hour at peak · 313 m
- Saint Columbas Rise · 192, 196, 197, 41, 41B · 6/hour at peak · 332 m
Schools growing or shrinking planning in 3 years · pupils last year
- Swords Borough NS · 198 m-6.7% pupils (84)
- River Valley CNS · 322 m+1.4% pupils (142) · 2 classrooms 2025, approved
- S N Cholmille B · 370 m-4.5% pupils (320) · temporary classrooms 2025, approved
- S N Cholmcille C · 387 m-12.1% pupils (326) · temporary classrooms 2025, approved · temporary classrooms 2024, approved
- Fingal Community College · 401 m-0.2% pupils (864)
- Coláiste Choilm · 680 m-0.9% pupils (421)
Open consultations
Council meetings 30 items
- 14 Sept 2026 · Comyn Manor, Swords, Co. Dublin
- 10 Sept 2026 · Councillor J. Smyth - Swords Bike Library Initiative - AI109462
- 10 Sept 2026 · Councillor C. Johnston - Taking-in-Charge - The Orchard Estate - Oldtown - AI109689
- 10 Sept 2026 · Councillor E. Dockrell - Update on Playground for Oldtown - AI109219
- 10 Sept 2026 · Councillor J. Newman - Update on Swords Western Distributor Road Project - AI109224
- 10 Sept 2026 · Councillor J. Newman - Walled Gardens - Brackenstown - Swords - AI109591
- 10 Sept 2026 · Comyn Manor, Swords, Co. Dublin
- 10 Sept 2026 · Letter dated 18th June 2026 from HSE regarding Cllr. L. Corkery Motion - Swords Primary Care Centre
Public land
- Fingal County Council · 0.7 ha · 112 m
- Dublin City Council · 0.81 ha · 180 m
- Fingal County Council · 0.62 ha · 180 m
- Health Service Executive · 0.26 ha · 205 m
- Fingal County Council · 0.38 ha · 213 m
- Fingal County Council · 0.44 ha · 228 m
Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
| Source | Licence | Fetched | Link |
|---|---|---|---|
| gtfs | CC-BY-4.0 | 11 Oct 2026, 23:43 | open |
| schools | CC-BY-4.0 | 27 Sept 2026, 23:32 | open |
| npad | CC-BY-4.0 | 12 Oct 2026, 01:44 | open |
| consult | public | 12 Oct 2026, 01:26 | open |
| moderngov | public | 12 Oct 2026, 01:27 | open |
| lda_lands | CC-BY-4.0 | 11 Sept 2026, 16:43 | open |
| cso_saps_2022 | CC BY 4.0 | — | open |
| National Transport Authority | CC BY 4.0 | — | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | CC BY 4.0 | — | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | CC BY 4.0 | — | — |
| EPA strategic noise maps | CC BY 4.0 | — | — |
| Fingal County Council | CC BY 4.0 | — | — |
What to ask, and who
- Work already done (F14A/0451): work kept with permission. Done as approved?Seller · solicitorAsk for: The retention grant and an opinion of compliance.
- Work already done (F12A/0406): work kept with permission. Done as approved?Seller · solicitorAsk for: The retention grant and an opinion of compliance.
- Modifications to existing (F18A/0283) refused 2018: built anyway?Seller · solicitorAsk for: The seller's answer and your surveyor's check.
- Planning here goes back to 2013: is the house built as approved?SolicitorAsk for: The original planning grant and an opinion of compliance.
- Next to a recorded monument: does digging need notice?Seller · councilAsk for: Details of past works from the seller.
- Any work done without planning permission?Seller · solicitorAsk for: An opinion of compliance for the whole house.
Where this is, the terms, the sources
- Townland
- Townparks
- Electoral division
- Swords Village
- Electoral area
- Swords
- Council
- Fingal County Council
Everything we found, as a list 8 lines
- 3 applications on this site; latest F18A/0283, refused 2018.
- Zoned M4 (major town centre); monument zone; no vacant land tax.
- 11 sites nearby could change: 1 stalled build, 10 empty zoned plots.
- 3 applications open for comments nearby; nearest closes 12 Nov 2026.
- Swords Castle (bus 192, 196) 136 m away: 19 an hour at morning peak; 166 from all stops within 500 m. Planned: MetroLink 537 m away, indicative route (Fingal Development Plan 2023-2029 objective).
- Inside Dublin Airport Noise Zone D.
- Here (2022 census): 78% rent (council 28%); 15% of homes empty (council 5%); most built 1991–2000; 32% drive to work (council 52%); population up 4% since 2016.
- 2 home extensions within 250 m since 2026.
What the terms mean 10 terms
- Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
- Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
- Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
- Approved (Grant of permission): The council said yes, usually with conditions.
- Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
- Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
- Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
- Permission for work already done (Retention permission): An application to keep something that was built without permission.
- What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
- Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
Sources and licences 37
| Source | Publisher | Licence | Fetched |
|---|---|---|---|
| EPA strategic noise maps | — | CC BY 4.0 | — |
| Fingal County Council | — | CC BY 4.0 | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | — | CC BY 4.0 | — |
| National Transport Authority | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | An Coimisiún Pleanála | CC-BY-4.0 | 9 Oct 2026 |
| data.nbco.gov.ie | National Building Control Office (BCMS) | CC-BY-4.0 | 11 Oct 2026 |
| data.gov.ie | Various (see each layer) | mixed — CC-BY-4.0 except OPW flood (CC… | 27 Sept 2026 |
| services.arcgis.com | Local authorities (ACAs) | CC-BY-4.0 (Fingal); public/attribution… | 27 Sept 2026 |
| gis.epa.ie | Environmental Protection Agency | CC-BY-4.0 | 27 Sept 2026 |
| s3.eu-west-1.amazonaws.com | Office of Public Works | CC-BY-NC-ND-4.0 · flag only | 11 Sept 2026 |
| services-eu1.arcgis.com | National Inventory of Architectural Heritage | CC-BY-4.0 | 27 Sept 2026 |
| gis.epa.ie | Environmental Protection Agency | CC-BY-4.0 | 27 Sept 2026 |
| services.arcgis.com | Local authorities (Record of Protected Structures) | CC-BY-4.0 (Fingal); public/attribution… | 27 Sept 2026 |
| services-eu1.arcgis.com | National Monuments Service (SMR) | CC-BY-4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Monuments Service (SMR zones) | CC-BY-4.0 | 27 Sept 2026 |
| dlrcoco.citizenspace.com | https: | Local authorities (consultation portals) | public | 12 Oct 2026 |
| www2.courts.ie | — | all-rights-reserved | 12 Oct 2026 |
| cso.ie | — | CC BY 4.0 | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | Local authorities (derelict sites registers) | CC-BY-4.0 | 5 Oct 2026 |
| services.arcgis.com | Dublin local authorities (housing delivery pipeline) | CC-BY-4.0 | 5 Oct 2026 |
| data.epa.ie | Environmental Protection Agency (LEAP licence register) | CC-BY-4.0 | 5 Oct 2026 |
| esbnetworks.ie | — | all-rights-reserved (esbnetworks.ie di… · flag only | 11 Sept 2026 |
| transportforireland.ie | National Transport Authority | CC-BY-4.0 | 11 Oct 2026 |
| lda.ie | Land Development Agency | CC-BY-4.0 | 11 Sept 2026 |
| meetings.fingal.ie | Local authorities (council meetings) | public | 12 Oct 2026 |
| services.arcgis.com | Department of Housing (National Planning Application Database) | CC-BY-4.0 | 12 Oct 2026 |
| organisations | Planning Register (derived from applications and the CRO register) | n/a — derived; organisations only; DLR… | 11 Oct 2026 |
| services-eu1.arcgis.com | Tailte Éireann | CC-BY-4.0 | 11 Sept 2026 |
| services-eu1.arcgis.com | CSO, Tailte Éireann, OpenStreetMap contributors | CC-BY-4.0 | 4 Oct 2026 |
| propertypriceregister.ie | Property Services Regulatory Authority (PPR) | PSI — PSRA re-use terms (psr.ie/re-use… | 12 Oct 2026 |
| data.gov.ie | Local authorities (Record of Protected Structures) | CC-BY-4.0 | — |
| services.arcgis.com | Local authorities (RZLT maps) | CC-BY-4.0 | 11 Oct 2026 |
| gov.ie | Department of Education | CC-BY-4.0 | 27 Sept 2026 |
| gov.ie | Department of Housing | CC-BY-SA-4.0 | 9 Oct 2026 |
| tusla.ie | Tusla (Early Years Inspectorate) | public (Tusla statutory register; ackn… | 5 Oct 2026 |
| services.arcgis.com | Local authorities via the Department of Housing (GZT / MyPlan) | CC-BY-4.0 | 11 Oct 2026 |