Cavan Road, Virginia
Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (97%). 12 homes approved 527 m away haven't started.
Not held yet for Cavan County Council: council consultations.
How planning works, with this area's numbers
steps can overlap · medians for home extensions within 1.5 km, 10 years- 1ApplySite notice up, plans online
- 2Comments5 weeks, €20. Comment to keep your right to appeal
- 3Decision8 weeks by law. Here 50 days
- 4Appeal window4 weeks after the decision
- 5AppealAt An Coimisiún Pleanála
- 6PermissionLasts 5 years
- 7StartStart notice to the council. Here about 8 months after
- 8Sign-offCompletion cert, or the owner opts out
What's the planning story of this house?
When it was built, and the rules since
Most homes here were built 2001–10, under planning permission and building regulations.
Each line is a rule that applies to work done after it.
MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area
Zoning, protection, tax and flood: the detail
What it says
Existing Residential: Protect and enhance the amenity of developed residential communities
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
cavan county development plan incorporating a local area plan for cavan town 2022 2028 · 11 Jul 2022 – 10 Jul 2028
What it says
Existing Residential: Protect and enhance the amenity of developed residential communities
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
cavan county development plan incorporating variation no1 2022 2028 · 11 Jul 2022 – 10 Jul 2028
Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.
| Within 1.0 km | Count | For example |
|---|---|---|
| Heritage inventory buildings | 23 | Virginia Park Lodge; The Cottage |
| Monuments | 9 | Ritual site - holy well; Designed landscape - tree-ring |
How we work this out
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Development plan zoning (councils) | CC BY 4.0 | 25 Oct 2026, 23:06 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 25 Oct 2026, 23:43 | open |
| Constraint layers (bundle) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026, 19:37 | open |
| National Inventory of Architectural Heritage | CC BY 4.0 | 27 Sept 2026, 19:35 | open |
| Sites and Monuments Record | CC BY 4.0 | 27 Sept 2026, 19:29 | open |
How we work this out
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 23:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 30 Oct 2026, 02:44 | open |
| National Planning Application Database | CC BY 4.0 | 30 Oct 2026, 23:02 | open |
Could you extend?
Nothing on this site restricts it: not protected, not in a conservation area.
What happened to applications like yours
Extensions are almost always approved here: 100% by type.
Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.
CalculatedOur classificationcouncil register via NPAD · 10 nearby, 234 council-wide
Virginia, file by file since 2021
13 of 13 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.
28 files with "Virginia" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.
MeasuredOur classificationcouncil register via NPAD · 2021–2026
Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m
Extensions and refusals near you 1 extensions within 250 m · the last 12 months
| Kind | Applied | Approved | Refused |
|---|---|---|---|
| Garage conversion | 1 | 1 | — |
Refused within 100 m 0 in the last 12 months
Nothing refused this close in the last 12 months.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 23:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 30 Oct 2026, 02:44 | open |
| National Planning Application Database | CC BY 4.0 | 30 Oct 2026, 23:02 | open |
How long, and what if someone objects?
A home extension's journey here
A decision takes 50 days. Building starts about 8 months after permission.
Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.
Calculated33 decided home extensions, 12 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála
What appeals changed
1 of 5 appealed approvals were reversed.
Every appeal decided within 1.5 km in 10 years, any kind of development.
CalculatedAn Coimisiún Pleanála cases linked to the council file
What's changing around you?
- 1Rahardrum 2460643
- 2Cavan Road, Virginia 22338
- 3Deerpark, Virginia 2660205
- 4Deerpark, Virginia 2660290
- 5Unit 3 The Courtyard Cavan Road, Virginia 2660537
- 6Virginia Park Lodge, Deerpark 2660038
- 7Cavan Road, Virginia 2660077
- 8Church View, Ballyjamesduff Road 2560766
- 9Main Street, Virginia 2660232
- 10Dunancory Demesne Deerpark, Virginia 2660332
What happens to applications within 500 m
Permission isn't building. Of 18 permissions since 2016, 6 show a start notice and 0 have a completion certificate.
Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.
Measured19 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates
The next 30 days
Nothing closes within 1.0 km in the next 30 days.
Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file
Approved, stalled or planned, not built yet
12 homes 527 m away were approved Aug 2025 with no start notice yet; the permission runs to Jan 2031.
Each row is a dated fact from a public register: no score and no forecast.
Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)
Sites that could change 1 within 1.0 km
Approved, not started 1
- Rahardrum · 12 homes approved Aug 2025, not started · 527 m
Not covered here: council land to be sold (Dublin only).
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 30 Oct 2026, 23:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 30 Oct 2026, 02:44 | open |
| Derelict sites registers | CC BY 4.0 | 26 Oct 2026, 23:09 | open |
| National Planning Application Database | CC BY 4.0 | 30 Oct 2026, 23:02 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 25 Oct 2026, 23:43 | open |
Applications within 500 m, by year
Between 2 and 5 a year; busiest 2024. 95% of decisions were approvals.
2021 and 2026 are part years (*). Exemption requests and time extensions are left out.
Measuredcouncil register via NPAD
Every application within 1.0 km 11 in the last 12 months
See every application on the map
- 5Unit 3 The Courtyard Cavan Road , Virginia , Co. Cavan No decision yetfor (1) PERMISSION for a material change of use of the rear portion of the ground floor from a coffee shop to…
- Unit 3 The Courtyard Cavan Road , Virginia , Co. Cavan Withdrawn or not validfor (1) RETENTION PERMISSION for the material change of use of the front portion of the ground floor from a…
- 10Dunancory Demesne Deerpark , Virginia , Co. Cavan No decision yetto complete a partially constructed housing development granted under Pl. Ref No. 061836. The development…
- Unit 3 The Courtyard Cavan Road , Virginia , Co. Cavan Withdrawn or not valid(1) for the material change of use of the front portion of the ground floor from a previously permitted…
- 4Deerpark , Virginia , Co. Cavan No decision yetto develop 4 No. residential sites as follows: Site 1: 1 No. detached storey and a half style dwelling and…
- 9Main Street , Virginia , County Cavan No decision yetfor (A) the change of use and refurbishment of part of ground floor of the existing derelict building,…
- Main Street , Virginia , County Cavan Withdrawn or not validfor a residential development comprising of: (A) the change of use and refurbishment of part of ground floor…
- 3Deerpark , Virginia , Cavan Approved with conditionsfor single storey extension to rear and garage conversion to side
- 7Cavan Road , Virginia , Co. Cavan Approved with conditionsfor (1) Change of internal layout and use at Ground Floor Level from Commercial Retail Unit (planning…
- 6Virginia Park Lodge , Deerpark , Virginia No decision yetfor the temporary planning permission (previously granted under Planning Ref. No. 15/389, 20/389 & 20/573)…
- 8Church View , Ballyjamesduff Road , Virginia Co. Cavan Approved with conditionsfor: (1) Renovation and extension of the existing stone-fronted estate cottage, listed under rps reference…
How we work this out
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 30 Oct 2026, 23:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 30 Oct 2026, 23:02 | open |
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 30 Oct 2026, 02:44 | open |
Building work nearby 6 in the last 12 months
- 2Cavan Road, Virginia, Cavan, A82 XT71 · 14 Aug 2026 · 1 homes · 7-day notice not signed off · 22338 · 199 m
- Deerpark, Virginia, Cavan · 3 Aug 2026 · 7-day notice not signed off · 21257 · 790 m
- The Drumlins, Bailieborough Road, Virginia, Cavan · 16 Jun 2026 · 78 homes · start notice not signed off · 2460650 · 902 m
- The Drumlins, Bailieborough Road, Virginia, Cavan · 17 Apr 2026 · 78 homes · start notice not signed off · 2460650 · 854 m
- 5 New Street, Virginia, Cavan, A82 V9K8 · 1 Apr 2026 · 1 homes · short notice no sign-off needed · 25/60166 · 951 m
- Deerpark, (off Cavan Road N3) A82 X925, Virginia, Cavan · 8 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 25/60162 · 264 m
How we work this out
Source: Building Control Management System (commencement notices) · fetched 30 Oct 2026, 02:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 30 Oct 2026, 02:44 | open |
Homes coming 12 not started
- Bailieborough Road · 75 homes · building started · 859 m
- 1Rahardrum · 12 homes · not started · runs out 5 Jan 2031 · 527 m
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 30 Oct 2026, 23:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 30 Oct 2026, 02:44 | open |
| National Planning Application Database | CC BY 4.0 | 30 Oct 2026, 23:02 | open |
| Social housing construction status report | CC BY-SA 4.0 | 23 Oct 2026, 23:02 | open |
Named places nearby: estate, schemes, crèches, schools
Named places estate, developments, inspections
Crèches and schools inspected
| Name | Latest inspection | Distance |
|---|---|---|
| Angela Deighan’s Montessori School · Crèche | 9 Sept 2025 · report · Tusla Early Years Inspectorate | approx. 139 m |
| Scallywags Childcare · Crèche | 31 Jul 2025 · report · Tusla Early Years Inspectorate | approx. 139 m |
| Scribbles · Crèche | 18 Feb 2025 · report · Tusla Early Years Inspectorate | approx. 139 m |
How we work this out
How busy is this area Busier than most of Cavan County Council.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 23:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 30 Oct 2026, 02:44 | open |
| National Planning Application Database | CC BY 4.0 | 30 Oct 2026, 23:02 | open |
What's the area like?
This street block against the council
3% of homes built before 1971 (council 25%). 84% owner-occupied (council 69%).
MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 027092012
Schools, stops and the council
Schools
- Virginia College · postprimary · 809 pupils · 927 m
Stops 4
- Virginia · 109X, 172, 186, 187, 30, EK1 · 3/hour at peak · 621 m
- Virginia · 109, 109X, 172, 186, 187, 30 · 3/hour at peak · 651 m
Schools growing or shrinking planning in 3 years · pupils last year
- Virginia College · 927 m-4.1% pupils (809)
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 30 Oct 2026, 23:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Public transport stops and routes (NTA GTFS) | CC BY 4.0 | 25 Oct 2026, 23:02 | open |
| Department of Education school list | CC BY 4.0 | 27 Oct 2026, 23:04 | open |
| National Planning Application Database | CC BY 4.0 | 30 Oct 2026, 23:02 | open |
| Council consultation portals | Public | 30 Oct 2026, 01:04 | open |
| Council meetings (ModernGov) | Public | 30 Oct 2026, 02:17 | open |
| Land Development Agency public land register | CC BY 4.0 | 11 Sept 2026, 16:43 | open |
| cso_saps_2022 | CC BY 4.0 | — | open |
| National Transport Authority | CC BY 4.0 | — | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | CC BY 4.0 | — | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | CC BY 4.0 | — | — |
| EPA strategic noise maps | CC BY 4.0 | — | — |
| Fingal County Council | CC BY 4.0 | — | — |
What to ask, and who
- Any work done without planning permission?Seller · solicitorAsk for: An opinion of compliance for the whole house.
Where this is, the terms, the sources
- Townland
- Virginia
- Electoral division
- Virginia
- Electoral area
- Ballyjamesduff
- Council
- Cavan County Council
Everything we found, as a list 8 lines
- Zoned R2 (existing residential); not protected; no vacant land tax.
- 1 site nearby could change: 1 approved scheme.
- 12 homes approved nearby, not started; largest 12 at Rahardrum.
- No morning-peak service within 500 m; nearest is Virginia, 621 m away (3 an hour).
- Noise from road traffic mapped at 60–64 dB (day-evening-night average, EPA 2022).
- Here (2022 census): 84% owner-occupied (council 69%); 7% of homes empty (council 15%); most built 2001–2010; 73% drive to work (council 65%); population up 18% since 2016.
- 1 home extension within 250 m since 2026.
- Around here the council decides in a median 88 days (about 13 weeks); 55% are asked for more information.
What the terms mean 5 terms
- Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
- Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
- Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
- Approved (Grant of permission): The council said yes, usually with conditions.
- What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 26
| Source | Publisher | Licence | Fetched |
|---|---|---|---|
| EPA strategic noise maps | — | CC BY 4.0 | — |
| Fingal County Council | — | CC BY 4.0 | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | — | CC BY 4.0 | — |
| National Transport Authority | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | An Coimisiún Pleanála | CC BY 4.0 | 30 Oct 2026 |
| data.nbco.gov.ie | National Building Control Office (BCMS) | CC BY 4.0 | 30 Oct 2026 |
| data.gov.ie | Various (see each layer) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Inventory of Architectural Heritage | CC BY 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Monuments Service (SMR) | CC BY 4.0 | 27 Sept 2026 |
| dlrcoco.citizenspace.com | Local authorities (consultation portals) | Public | 30 Oct 2026 |
| www2.courts.ie | — | © the publisher | 30 Oct 2026 |
| cso.ie | — | CC BY 4.0 | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | Local authorities (derelict sites registers) | CC BY 4.0 | 26 Oct 2026 |
| transportforireland.ie | National Transport Authority | CC BY 4.0 | 25 Oct 2026 |
| lda.ie | Land Development Agency | CC BY 4.0 | 11 Sept 2026 |
| meetings.fingal.ie | Local authorities (council meetings) | Public | 30 Oct 2026 |
| services.arcgis.com | Department of Housing (National Planning Application Database) | CC BY 4.0 | 30 Oct 2026 |
| services-eu1.arcgis.com | Tailte Éireann | CC BY 4.0 | 11 Sept 2026 |
| services-eu1.arcgis.com | CSO, Tailte Éireann, OpenStreetMap contributors | CC BY 4.0 | 4 Oct 2026 |
| propertypriceregister.ie | Property Services Regulatory Authority (PPR) | © PSRA, PSI licence | 31 Oct 2026 |
| services.arcgis.com | Local authorities (RZLT maps) | CC BY 4.0 | 25 Oct 2026 |
| gov.ie | Department of Education | CC BY 4.0 | 27 Oct 2026 |
| gov.ie | Department of Housing | CC BY-SA 4.0 | 23 Oct 2026 |
| tusla.ie | Tusla (Early Years Inspectorate) | Public register | 28 Oct 2026 |
| services.arcgis.com | Local authorities via the Department of Housing (GZT / MyPlan) | CC BY 4.0 | 25 Oct 2026 |