  • 5 applications on this site; latest 2660347, no decision yet.
  • Zoned M2 (major town centre); heritage-listed; no vacant land tax.
  • 7 sites nearby could change: 2 approved schemes, 5 empty zoned plots.10121314
  • 2 applications open for comments nearby; nearest closes 27 Oct 2026.1
  • 45 homes approved nearby, not started; largest 32 at SwanPoint.5
  • Sligo Markievicz (bus 563, 566) 401 m away: 7 an hour at morning peak; 33 from all stops within 500 m.
  • Noise from road traffic mapped at 65–69 dB (day-evening-night average, EPA 2022).
  • Here (2022 census): 74% rent (council 27%); 42% of homes empty (council 18%); most built before 1919; 30% drive to work (council 61%); population up 8% since 2016.
On this site
M2
Zoning · Major town centre
Yes
Protected or listed · a building in the national heritage inventory (32006054)
No
Vacant land tax · not on the map

Questions to ask before you buy 6 to ask

  1. Change of use (2660347) awaits a decision: what is planned?
    Ask for: The application on the council's website.
  2. Change of use (2660098) approved 2026, not started: still planned?
    Ask for: The grant, and whether it stays with the house.
  3. Work already done (2560222): work kept with permission. Done as approved?
    Ask for: The retention grant and an opinion of compliance.
  4. 13 homes approved 135 m away (3 Lyons Terrace), not started: what is planned?
    Ask for: The planning file for 2660178.
  5. Application 421 m away open for comments until 27 Oct 2026: comment?
    Ask for: The plans on the council's website (€20 to comment).
  6. Any work done without planning permission?
    Ask for: An opinion of compliance for the whole house.

The street 15 numbered

Street map around Old Mill Union Street, Rathedmond with 15 numbered planning items
⌖ the siteOpen for commentsWindow closingApproved, not startedAppealBuilding startedEmpty land zoned for homes
#WhatStatusDistanceWhy it is here
1LMS Express, Finisklin Road
2660388
Withdrawn or not valid421 mopen for comments until 27 Oct 2026
2Sligo Physio Space, Ballast Quay
2660391
No decision yet436 mopen for comments until 29 Oct 2026
3No. 7 Adelaide St., Sligo
2560390
Approved with conditions229 mtime to appeal ends 8 Oct 2026
43 Lyons Terrace
2660178
Approved, no sign building has started135 m13 homes approved 2026, no sign building has started
5SwanPoint
2560004
Approved, no sign building has started339 m32 homes approved 2025, no sign building has started
67 Union Street, Rathedmond
500229
Appeal: approved31 mappealed to An Coimisiún Pleanála (the national planning appeals body), received 5 Nov 2025
7Lynns Dock, Rathedmond
324027
Appeal: other outcome178 mappealed to An Coimisiún Pleanála (the national planning appeals body), received 13 Jan 2026
8No. 27 Lord Edwrd Street, Sligo.
314307
Appeal: approved with conditions184 mappealed to An Coimisiún Pleanála (the national planning appeals body), received 9 Aug 2022
937 Union Street, Sligo
26/60098
Building started25 mbuilder told the council work was starting, 10 Sep 2026
100.2 ha zoned for homesEmpty land zoned for homes100 mno homes built on it yet
11Pirn Mill Road, Sligo
PART 8 PLANNING
Building started149 mbuilder told the council work was starting, 6 Jul 2026
120.2 ha zoned for homesEmpty land zoned for homes239 mno homes built on it yet
130.8 ha zoned for homesEmpty land zoned for homes282 mno homes built on it yet
140.5 ha zoned for homesEmpty land zoned for homes336 mno homes built on it yet
151.0 ha zoned for homesEmpty land zoned for homes369 mno homes built on it yet

This property's history 5 on this site

  1. 2026
    2660347 · change of use · no decision yet
    approved?started?signed off?
  2. 2026
    2660098 · change of use · approved 2026 · not started, runs out 2031
    approvedstartedsigned off
  3. 2026
    2660079 · change of use · withdrawn
    approved?started?signed off?
  4. 2025
    2560222 · work already done · approved 2025 · work already done
    approvedstartedsigned off?
  5. 2025
    2560224 · change of use · approved 2025 · not started, runs out 2030
    approvedstartedsigned off
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 6 Oct 2026, 04:57
SourceLicenceFetchedLink
bcmsCC-BY-4.06 Oct 2026, 04:57open
npadCC-BY-4.07 Oct 2026, 01:38open

The site zoning, protection, tax, flood

ZoningM2 · Major town centre
What it says

TC1 – town centre uses, type 1: Objective: Protect the historic character and of Sligo’s old town core through conservation, regeneration and public realm improvements, and promote civic, retail and compatible uses that preserve the town core’s identity and attractiveness.

The main town centre — retail, offices, civic uses, apartments.

sligo county development plan 2024 2030 · 11 Nov 2024 – 11 Nov 2030

Heritage inventoryOn this site store/warehouse

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: G. Bruss GmbH Dichtungstechnik (364 m); Starrus Eco Holdings Limited (Sligo) (951 m)

Vacant land taxNo not on the map
Flood riskNo none within 500 m
Within 500 mCountFor example
Heritage inventory buildings173house
Monuments18R160348; R160397
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 62 on the draft 2027 map; 59 on the final 2026 map.
Sources: zoning, constraints.niah, epa_leap, rzlt, constraints, constraints.smr · fetched 4 Oct 2026, 23:11
SourceLicenceFetchedLink
zoningCC-BY-4.04 Oct 2026, 23:11open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
epa_leapCC-BY-4.05 Oct 2026, 23:09open
rzltCC-BY-4.04 Oct 2026, 23:59open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open

Sites that could change 7 within 500 m

the site250 m500 m1012131415

Approved, not started 2

  • 3 Lyons Terrace · 13 homes approved Aug 2026, not started · 135 m
  • SwanPoint · 32 homes approved Apr 2025, not started · 339 m

Empty land zoned for homes 5

  • 100.2 ha zoned for homes · no homes built on it yet · 100 m source
  • 120.2 ha zoned for homes · no homes built on it yet · 239 m source
  • 130.8 ha zoned for homes · no homes built on it yet · 282 m source
  • 140.5 ha zoned for homes · no homes built on it yet · 336 m source
  • 151.0 ha zoned for homes · no homes built on it yet · 369 m source

Not covered here: council land to be sold, empty land zoned for homes (Dublin only).

How we work this out
Each row is a dated fact from a public register: no score and no forecast. Derelict buildings come from the council's register; stalled builds told the council they were starting 3+ years ago and were never signed off; approved schemes are 10+ homes with no notice that building started; council land sales are notices to councillors; empty zoned land is on the vacant land tax map.
Sources: acp, bcms, derelict, npad · fetched 2 Oct 2026, 23:01
SourceLicenceFetchedLink
acpCC-BY-4.02 Oct 2026, 23:01open
bcmsCC-BY-4.06 Oct 2026, 04:57open
derelictCC-BY-4.05 Oct 2026, 09:35open
npadCC-BY-4.07 Oct 2026, 01:38open

What closes soonest 3 open

  • Time to appeal ends 8 Oct 20261 day left
    32560390 · CONDITIONAL — (a) change of use from a retail unit to a bakery, (b) retain elevational changes to side and rear of…
    €220 to An Coimisiún Pleanála (€110 observer) · 229 m away
  • Comments close 27 Oct 202620 days left
    12660388 · application received — Retention Permission and Permission for development at LMS Express, Finisklin Road, Rathedmond…
    €20 to the council · 421 m away
  • Comments close 29 Oct 202622 days left
    22660391 · application received — Revisions to an existing elevation treatment including a decorative elevational painting to the…
    €20 to the council · 436 m away
Sources: acp, consult, moderngov, npad, rzlt · fetched 2 Oct 2026, 23:01
SourceLicenceFetchedLink
acpCC-BY-4.02 Oct 2026, 23:01open
consultpublic7 Oct 2026, 01:17open
moderngovpublic7 Oct 2026, 01:18open
npadCC-BY-4.07 Oct 2026, 01:38open
rzltCC-BY-4.04 Oct 2026, 23:59open

Planning around you 86 in 5 years

62 approved3 refused2 no decision19 withdrawn or other
12021
192022
112023
162024
272025
122026*
Applications within 500 m, by year received. * this year so far; the first year is part of a year.
Last 24 monthsReceivedApprovedMore details askedDays to decideWork already built
Sligo County Council1,14593%28%5224%

Open for comments €20 to comment

Every application newest first

Show 74 more
How we work this out
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: npad, acp, bcms · fetched 7 Oct 2026, 01:38
SourceLicenceFetchedLink
npadCC-BY-4.07 Oct 2026, 01:38open
acpCC-BY-4.02 Oct 2026, 23:01open
bcmsCC-BY-4.06 Oct 2026, 04:57open

Extensions and refusals near you 5 extensions within 250 m

3 approved1 refused1 no decision or withdrawn
KindAppliedApprovedRefused
Two-storey rear211
Other11—
Side11—
Single-storey rear10—

Refused within 100 m 0 in 5 years

Nothing refused this close in 5 years.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 7 Oct 2026, 01:38
    SourceLicenceFetchedLink
    npadCC-BY-4.07 Oct 2026, 01:38open
    acpCC-BY-4.02 Oct 2026, 23:01open

    Building work nearby 18 in 3 years

    6 signed off as finished9 not signed off3 no sign-off needed
    • 937 Union Street, Sligo · 10 Sept 2026 · 7-day notice not signed off · 26/60098 · 25 m
    • 64 Saint Edwards Terrace, Sligo, F91 VC5C · 27 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 2560397 · 425 m
    • 11Pirn Mill Road, Sligo · 6 Jul 2026 · 20 homes · start notice not signed off · PART 8 PLANNING · 149 m
    • Pirn Mill Road, Sligo · 6 Jul 2026 · 20 homes · start notice not signed off · PART 8 PLANNING · 149 m
    • Pirn Mill Road, Sligo · 6 Jul 2026 · 20 homes · start notice not signed off · 149 m
    • Rathedmond Road, Sligo, F91 XF38 · 1 Apr 2026 · 7-day notice not signed off · 2560449 · 234 m
    • 9 O'Connell Street, Sligo, F91 RYD4 · 2 Oct 2025 · start notice not signed off · 395 m
    • Unit 21 and 21a mezzanine at The Canopy Shopping Centre, O'Connell Street, Knappagh Beg, Sligo, Sligo, F91 ER20 · 23 Jun 2025 · 7-day notice not signed off · PL 24/60424 · 392 m
    Show 10 more
    • Adelaide Street, Sligo, F91 V564 · 14 May 2025 · start notice not signed off · 2316 · 263 m
    • 32 O'Connell Street, Sligo, F91 V8WT · 21 Apr 2025 · start notice not signed off · 24/60358 · 375 m
    • 8 John Street, Sligo, F91 TRC9 · 31 Mar 2025 · 3 homes · 7-day notice signed off · PL24/60338 · 439 m
    • Knappagh Road, Sligo · 19 Dec 2024 · 4 homes · start notice signed off · PL 20/113 · 370 m
    • Ballinode, Sligo, F91 DY66 · 1 Oct 2024 · start notice signed off · 21148 · 454 m
    • Holborn Street, Sligo, F91 NT38 · 16 Apr 2024 · 1 homes · short notice no sign-off needed · 432 m
    • Quay Street, Sligo, F91 V08N · 29 Feb 2024 · 7-day notice signed off · 23101 · 259 m
    • Finisklin Road, Sligo, F91 P523 · 6 Nov 2023 · short notice no sign-off needed · 156 m
    • Smith’s Row / Wine Street Car Park, Sligo, F91 PX93 · 16 Oct 2023 · start notice signed off · 288 m
    • Quay Street, Sligo, F91 V08N · 11 Oct 2023 · 7-day notice signed off · 259 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: bcms · fetched 6 Oct 2026, 04:57
    SourceLicenceFetchedLink
    bcmsCC-BY-4.06 Oct 2026, 04:57open

    Homes coming 45 not started

    • 5SwanPoint · 32 homes · not started · runs out 1 Apr 2030 · 339 m
    • 43 Lyons Terrace · 13 homes · not started · runs out 3 Aug 2031 · 135 m
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: acp, bcms, npad, social_housing · fetched 2 Oct 2026, 23:01
    SourceLicenceFetchedLink
    acpCC-BY-4.02 Oct 2026, 23:01open
    bcmsCC-BY-4.06 Oct 2026, 04:57open
    npadCC-BY-4.07 Oct 2026, 01:38open
    social_housingCC-BY-SA-4.025 Sept 2026, 20:56open

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Dreamchasers Childcare Services · Crèche4 Jun 2024 · report · Tusla Early Years Inspectorate768 m
    Hopes & Dreams · Crèche26 Aug 2025 · report · Tusla Early Years Inspectorate771 m
    Lilliput Montessori/Pre School · Crèche11 Feb 2025 · report · Tusla Early Years Inspectorate778 m
    Cosy Cats ChildCare Ltd · Crèche7 Nov 2024 · report · Tusla Early Years Inspectorate867 m
    Bright Minds · Crèche24 Oct 2024 · report · Tusla Early Years Inspectorate914 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: schools, tusla_ey · fetched 27 Sept 2026, 23:32
    SourceLicenceFetchedLink
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open

    How busy is this area within 1 km, 3 years

    Busier than most of Sligo County Council.

    Homes approved
    Here129
    Council middle0
    Homes started
    Here123
    Council middle2
    Homes started within 1 km
    Last 12 months44
    3 years before2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: acp, bcms, npad · fetched 2 Oct 2026, 23:01
    SourceLicenceFetchedLink
    acpCC-BY-4.02 Oct 2026, 23:01open
    bcmsCC-BY-4.06 Oct 2026, 04:57open
    npadCC-BY-4.07 Oct 2026, 01:38open

    Appeals 10 in 5 years

    2 approved2 pending6 other
    • 321202 Other · Multi-unit building at Mulligan Court, Connaughton Road, Sligo, Co.… · 457 m
    • 324027 Other · Lynns Dock, Rathedmond, Sligo, Co. Sligo · 178 m
    • 500229 Granted · 7 Union Street, Rathedmond, Sligo. · 31 m
    • 500748 Pending · Swan Point , Fish Quay , Sligo · 325 m
    • 323308 Other · Lands at South of Dunnes Stores car park, Wine Street and East of… · 239 m
    • 321183 Other · Lynn's Dock, Rathedmond, Sligo. · 178 m
    • 320387 Other · South of Dunnes Car Park, Wine Street & East of Adelaide Street, Sligo · 239 m
    • 316908 Other · Lands South of Dunnes Stores Car Park, Adelaide Street, Sligo. · 239 m
    Show 2 more
    • 314307 Granted with conditions · No. 27 Lord Edwrd Street , Sligo. · 184 m
    • 312554 Pending · Lynn's Dock, Rathedmond, Sligo. · 178 m
    Sources: acp, courts, npad · fetched 2 Oct 2026, 23:01
    SourceLicenceFetchedLink
    acpCC-BY-4.02 Oct 2026, 23:01open
    courtsall-rights-reserved7 Oct 2026, 01:21open
    npadCC-BY-4.07 Oct 2026, 01:38open

    Sales 0 in 3 years

    No recorded sales nearby.

    Source: ppr · fetched 7 Oct 2026, 01:12
    SourceLicenceFetchedLink
    pprPSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.'7 Oct 2026, 01:12open

    Schools and transport within 1.0 km

    Schools

    • Ursuline College · postprimary · 603 pupils · 564 m
    • SCOIL EOIN NAOFA · primary · 289 pupils · 730 m
    • S N URSULA · primary · 439 pupils · 830 m
    • OUR LADY OF MERCY N S · primary · 449 pupils · 850 m
    • Summerhill College · postprimary · 1155 pupils · 859 m
    • ST BRENDANS NS · primary · 177 pupils · 899 m
    • Carbury National School · primary · 210 pupils · 940 m
    • SLIGO PROJECT SCHOOL · primary · 52 pupils · 990 m

    Stops 33

    • Wine Street · S2, S3 · 162 m
    • Adelaide Street · SI11 · 175 m
    • Sligo (MacDiarmada) · Dublin - Sligo · 188 m
    • Quay Street · 449 · 230 m
    • Sligo Bus Stn · 23, 458, 462, 469, 470, 479 · 232 m
    • Sligo Bus Stn · 566, 572, 977, 981, S2 · 247 m
    • Quay Street · NG05 · 250 m
    • Sligo Bus Stn · 566, 572, 977, 981, S2 · 260 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Ursuline College · 564 m-4.6% pupils (603)
    • Scoil Eoin Naofa · 730 m+9.9% pupils (289)
    • S N Ursula · 830 m-1.1% pupils (439)
    • Our Lady Of Mercy NS · 850 m+2.7% pupils (449) · an extension 2026, approved with conditions
    • Summerhill College · 859 m+4.2% pupils (1,155)
    • St Brendans Ns · 899 m-4.3% pupils (177)
    Sources: gtfs, schools, npad · fetched 4 Oct 2026, 23:41
    SourceLicenceFetchedLink
    gtfsCC-BY-4.04 Oct 2026, 23:41open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    npadCC-BY-4.07 Oct 2026, 01:38open

    The council consultations, meetings, land

    No open consultation covers this place.

    Sources: consult, moderngov, lda_lands · fetched 7 Oct 2026, 01:17
    SourceLicenceFetchedLink
    consultpublic7 Oct 2026, 01:17open
    moderngovpublic7 Oct 2026, 01:18open
    lda_landsCC-BY-4.011 Sept 2026, 16:43open

    Where this is

    Townland
    Rathedmond
    Electoral division
    Sligo West
    Electoral area
    Sligo-Strandhill
    Council
    Sligo County Council
    216
    people (2022)
    16.2%
    owner-occupied
    73.5%
    rented
    Sources: places, parcels · fetched 5 Oct 2026, 00:43
    SourceLicenceFetchedLink
    placesCC-BY-4.05 Oct 2026, 00:43open
    parcelsCC-BY-4.011 Sept 2026, 19:06open

    What the terms mean 8 terms

    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • Permission for work already done (Retention permission): An application to keep something that was built without permission.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.

    Sources

    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.02 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.06 Oct 2026
    data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
    dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public7 Oct 2026
    www2.courts.ie—all-rights-reserved7 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.05 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC-BY-4.05 Oct 2026
    transportforireland.ieNational Transport AuthorityCC-BY-4.04 Oct 2026
    lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)public7 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.07 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…7 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.04 Oct 2026
    gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
    gov.ieDepartment of HousingCC-BY-SA-4.025 Sept 2026
    tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.04 Oct 2026
    How we work this out
    Generated 7 Oct 2026, 03:43 from the Planning Register store; nothing was fetched live. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.