PlanningRegister.ie
Dublin City Council · WEB1738/25 · Permission

144 Harmonstown Road

Approved Oct 2025: 43 apartments; no start notice yet.

6 storeysPAMES Developments LimitedDublin 5, Dublin City Council

One email to confirm. Unsubscribe in one click.

Status
Approved · no start notice yet
Council decision
Approved · 28 Oct 2025
Height
up to 6 storeys
Uses
residential, apartments
Applicant
PAMES Developments Limited · 2 planning applications
Site
1,644 m²
Appeal
ACP 500328 · Withdrawn · 20 Aug 2026

The scheme

PAMES Developments Limited proposes a residential development at 144 Harmonstown Road in Dublin 5. The project involves the demolition of an existing industrial building and the construction of 43 later living apartment units across two 6-storey blocks.

What the register says

PAMES Developments Limited intends to apply for planning permission for a residential development of 43 later living apartment units, designed to the requirements of Fold Housing Association, comprising two linked 6 storey Apartment blocks at 144 Harmonstown Road, Harmonstown, Dublin 5 (D05 AY07). The proposed development will comprise of: (a) the demolition of the existing 2 storey detached light industrial building; (b) construction of 43 gallery accessed one-bedroom apartments in 2 blocks as follows – Block A, a 6-storey building facing Harmonstown Road consisting of 20 one-bedroom apartments with north facing external access galleries and private balconies to the southern elevation at floors 1 to 5, a communal room, office, 22 covered bicycle stands and 1 covered motorbike parking space at ground floor level; Block B, a 6-storey building consisting of 23 one-bedroom apartments with north easterly facing external access galleries and south westerly facing balconies, bin storage enclosure, enclosed parking / charging spaces for 3 mobility scooters and 8 enclosed bicycle spaces at ground level. (c) landscaping, communal open space, internal access road, vehicular turning head and boundary treatments including a 2m high block wall to the railway cutting on the southern boundary; (d) provision of 8 car parking spaces all at surface level, 4 of which will have electric vehicle charging points, (e) roof level plant area; and (f) all ancillary site development works necessary to facilitate the development, including new vehicular and pedestrian access and egress from Harmonstown Road

Summary from the register record.

Planning timeline 4 steps
  • 4 Apr 2025
    Application lodged — Standard
  • 28 Oct 2025
    Council decision — Grant
  • 24 Nov 2025
    Appealed to An Coimisiún Pleanála — PL-500328-DN-25
  • 20 Aug 2026
    Commission decision — Withdrawn

The site 1,644 m²

Boundary of 144 Harmonstown Road as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 3 applications in the last 10 years

Appeals inside the site 2 with An Coimisiún Pleanála

Other big developments nearby within 2 km

Everything within 1 km on the map →

Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.