Dublin City Council · 3779/22 · Permission

146-156 Harolds Cross Road

Building: all 20 apartments are under construction (Q2 2026).

4 storeysVia Properties LimitedDublin 6, Dublin City Council

Email me when the next phase is lodged

How the homes are counted20 permitted · 22 applied for
  • 20 apartments permitted (the Dublin councils' housing pipeline, Q2 2026).
  • 22 apartments applied for (the application on the planning register).
Status
Building started
Council decision
Approved · 27 Sept 2022
Height
up to 4 storeys
Uses
residential, apartments
Applicant
Via Properties Limited
Site
800 m²
Appeal
ACP 314915 · Withdrawn · 7 Dec 2022

Building progress councils’ figures, Q2 2026

  1. 2022Approved
  2. 2024Building started
  3. Not yetFirst homes signed off

completed · under construction · not started

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 202520200
Q3 202520200
Q4 202520200
Q1 202620200
Q2 202620200
Source and licence

The scheme

Via Properties Limited proposes a residential development at 146-156 Harolds Cross Road. The project involves the demolition of existing buildings and the construction of 22 apartments across 3 and 4 storey structures, including the refurbishment of a protected structure at number 152.

What the register says

PROTECTED STRUCTURE : Development will consist of a) Demolition of existing buildings on site, with the exception of house number 152, which is a protected structure RPS. Ref. 8899, b) Construction of a residential development (c.1,665 sq.m), 3 and 4 storey in height, containing a total of 22 apartments comprising of 13 one bedroom units and 9 two bedroom units. c) Alterations, refurbishments works and a change of use from commercial retail to residential use are proposed for No. 152, two of the 22 units will be in No. 152, d) Bicycle store for 70 cycle spaces, bin store substation and plant rooms on the ground floor, e) Communal garden at ground floor level and communal terrace at third floor level f) All ancillary site development works, green roofs, boundary treatment works (including reduction in height of existing wall to rear) and services

Summary from the register record.

Planning timeline 7 steps
  • 20 Apr 2022
    Application lodged — Standard
  • 27 Sept 2022
    Council decision — Grant
  • 25 Oct 2022
    Appealed to An Coimisiún Pleanála — ABP-314915-22
  • 8 Dec 2022
    Commission decision — Withdrawn
  • 14 Dec 2022
    Final approval
  • 22 Apr 2024
    Building started
  • 27 Jan 2028
    Approval runs out (estimate)

The site 800 m²

Boundary of 146-156 Harolds Cross Road as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 3 applications in the last 10 years

Appeals inside the site 2 with An Coimisiún Pleanála
Commencement notices inside the site 1

Other big developments nearby within 2 km

Start notices are matched from the national building control register; a start on site can be missed.