Approved on appeal Jun 2026: 38 apartments; building not started (Q2 2026).

9 storeysSales LimitedDublin 8, Dublin City Council

One email to confirm. Unsubscribe in one click.

How the homes are counted38 permitted · 51 applied for
  • 38 apartments permitted (the Dublin councils' housing pipeline, Q2 2026).
  • 51 apartments applied for (the application on the planning register).
Status
Approved on appeal · no start notice yet
Council decision
Approved · 23 Jan 2026
Height
up to 9 storeys
Uses
residential, apartments
Applicant
Sales Limited · 1 planning application
Site
971 m²
Appeal
ACP 500827 · Approved with conditions · 3 Jun 2026

Building progress councils’ figures, Q2 2026

38
homes permitted
0
homes started on site
0
homes completed

completed · under construction · not started · 0 houses and 38 apartments permitted

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 2025—00
Q3 2025000
Q4 2025000
Q1 2026000
Q2 20263800
Source and licence

The scheme

Sales Limited proposes the demolition of existing light industrial buildings at 42 Marrowbone Lane, Dublin 8. The development consists of a 5-9 storey apartment building containing 51 units intended for independent living for residents aged 55 and over. The project includes communal amenity spaces, landscaping, and associated site works.

What the register says

The proposed development comprises the following: Demolition of all existing light industrial 1-2 storey light industrial buildings on the site (c. 435.73 sq.m) and associated boundary wall and fencing along Marrowbone Lane and Forbes Lane. Construction of a 5-9 storey residential apartment building comprising 51 no. 1 bed apartment units at ground to 8th floor level ranging in size from c.45 sq.m to c. 58 sq.m, and an internal communal amenity space at ground floor level (c. 54.2 sq.m). All apartment units are provided with private open space areas in the form of balconies/ terraces. Pedestrian access to the proposed development will be from Marrowbone Lane. The proposal includes the removal of the existing vehicular access point to the site. All units are intended to provide housing for independent living for older residents (55 years plus). The development proposes c.608 sq.m of communal amenity open space as 2 no landscaped areas, a courtyard space at ground floor level (c. 370.6 sq.m) and a landscaped terrace area at 8th floor roof level (c. 236.96 sq.m). The development also proposes associated secure bicycle (51 spaces for residents and 27 spaces for visitors) and bin storage, an ESB substation, generator room, switch room, sprinkler/break tank room, cleaners store, accessible W/C associated with the internal communal amenity space at ground floor level, hard and soft landscaping and all other associated site works and services above and below ground on an overall site of c. 975 sq.m

Summary from the register record.

Planning timeline 6 steps
  • 12 Jun 2025
    Application lodged — Standard
  • 23 Jan 2026
    Council decision — Grant
  • 18 Feb 2026
    Appealed to An Coimisiún Pleanála — PL-500827-DS-26
  • 3 Jun 2026
    Commission decision — Granted
  • 3 Jun 2026
    Final approval
  • 17 Jul 2031
    Approval runs out (estimate)

The site 971 m²

Boundary of 42 Marrowbone Lane as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 3 applications in the last 10 years

Appeals inside the site 1 with An Coimisiún Pleanála

Other big developments nearby within 2 km

Everything within 1 km on the map →

Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.