63-67A Collins Avenue East
Built: all 67 apartments are finished (Q1 2025).
7 storeysVervdev LimitedDublin 5, Dublin City Council
Email me when the next phase is lodged
- Status
- Built
- Council decision
- Approved · 10 Nov 2021
- Height
- up to 7 storeys
- Uses
- residential, apartments, retail
- Applicant
- Vervdev Limited
- Site
- 1,995 m²
- Appeal
- ACP 312113 · Approved with conditions · 23 Jun 2022
Building progress councils’ figures, Q1 2025
- 2022Approved on appeal
- 2023Building started
- 2025Built
completed · under construction · not started · 0 houses and 67 apartments permitted
Source and licence
The scheme
Vervdev Limited proposes the demolition of an existing mixed-use building at 63-67A Collins Avenue East, Dublin 5. The development consists of a new 5 to 7 storey mixed-use scheme containing 67 build-to-rent apartments and one ground floor retail unit. The project also includes residential amenity space, car parking, and bicycle storage.
What the register says
The development will consist of the demolition of the existing mixed-use (commercial/office/retail/residential) building extending to 2 to 3 no. storeys plus set back 4th storey tank room (c. 2,118 sqm) and transmission mast, and the construction of a 5 to 7 no. storey mixed use scheme comprising: A) One retail unit at ground floor level accessed from Collins Avenue East extending to approximately 552 sqm. B) 67 build-to-rent apartments consisting of 33 no. one-bed and 34 no. two-bed units at first to sixth floor level, each with private balcony or terrace. The fifth and sixth floors will be set back. C) Residential amenity space extending to approximately 153 sqm at first floor level comprising of shared work space/media room/games room. External communal open space located at first floor level by way of podium extending to c. 561 sqm accessed from the southern elevation. D) Car parking is included at ground floor level beneath the podium comprising 24 no. spaces including 2 no. disabled spaces, 3 no. EV charging spaces and 1 no. care share space. Secure bike storage for 156 bicycles (including 36 no. visitor spaces), separate bin storage ESB sub-station and ancillary retail and residential facilities are also provided at ground floor level. E) Pedestrian and vehicle access to the proposed development will be via the existing laneway located off Collins Avenue East. Pedestrian access to the northeast elevation will be provided by 2 no. entrances on Collins Avenue East. F) The proposed development will include signage (4 no. zones providing 35 sqm of signage on the northeast elevation at ground floor level), roof plant, PV panels, green roof and all associated drainage and infrastructure works
Summary from the register record.
Planning timeline 7 steps
- 10 Jun 2021Application lodged — Standard
- 10 Nov 2021Council decision — Grant permission
- 6 Dec 2021Appealed to An Coimisiún Pleanála — 312113
- 23 Jun 2022Commission decision — Granted with conditions
- 23 Jun 2022Final approval
- Q1 2025Site completed — Site completed
- 6 Aug 2027Approval runs out (estimate)
The site 1,995 m²
Boundary of 63-67A Collins Avenue East as the Dublin councils map it in the housing pipeline.
Planning applications inside the site 2 applications in the last 10 years
Appeals inside the site 2 with An Coimisiún Pleanála
Other big developments nearby within 2 km
- 110 & 114 Howth Road · approved 2026, no start notice · 86 homes · 7 storeys · 610 m away
- 2 Montrose Park · approved 2024, no start notice · 53 homes · 1 storeys · 1.8 km away
Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.