PlanningRegister.ie
Dublin City Council · WEB2214/24 · Permission

Fegan's, Chancery Street

12 apartments8 storeysOBA Chancery LimitedDublin 7, Dublin City Council

Approved Jan 2026; building started Jun 2025.

Also known as 13-18 Chancery Street, 1-1a St. Michan's Place.

  1. 27 Sept 2024Received
  2. 31 Mar 2025Approved
  3. 28 Apr 2025Appealed
  4. 17 Jun 2025Building started
  5. 16 Jan 2026Appeal: Withdrawn
  6. 28 Jan 2026Final approval
Status
Building started
Decision
Approved · 31 Mar 2025
Size
12 apartments · up to 8 storeys
Uses
residential, apartments, hotel
Applicant
OBA Chancery Limited
Site
913 m²
Appeal
ACP 322385 · Withdrawn

Building progress councils’ figures, Q2 2026

  1. 2026Approved
  2. 2025Building started
  3. Not yetFirst homes signed off

12 homes permitted; building has not started (Q2 2026).

12
homes proposed
12
homes permitted
0
homes started on site
0
homes completed

completed · under construction · not started · 0 houses and 12 apartments permitted

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 2025—00
Q3 2025000
Q4 2025000
Q1 20261200
Q2 20261200

The scheme

OBA Chancery Limited proposes the demolition of existing structures at Fegan's on Chancery Street and St. Michan's Place to construct a new 7 to 8 storey building. The development includes 12 residential apartment units and a 96-bedroom tourist hostel with associated amenities and infrastructure.

it involves the construction of a 96-bedroom tourist hostel and 12 residential units on a 0.09 hectare site

What the register says

The site is generally bounded by a Dublin City Council car park and multi-use games area to the north; Chancery Street to the south; 19-20 Chancery Street and St. Michan's Place to the west; and 8-12 St. Michan's Street and St. Michan's Street to the east. The development will consist of: a) The demolition of all existing buildings and structures on site (1-4 storeys) including reconfiguration of part basement level (total GFA approx. 1,794 sq m) and the construction of a 7 - 8 storey (approx. 26.4 m overall height) over part basement level building (total GFA approx. 5,635 sqm) accommodating 12 no. residential apartment units (approx. 1,180 sq m) and a 96 no. bedroom tourist hostel (approx. 4,455 sq m) with additional plant, tank room and ESB substation. b) The 12 no. residential apartment units will consist of 6 no. 1-bed units and 6 no. 2-bed units located across first to sixth floor level, each with an associated private open space area in the form of a balcony. Pedestrian access to the residential apartment units is proposed via St. Michan's Street. Communal open space (approx. 76 sqm) for the residential units is provided at seventh floor level in the form of a roof terrace. A total of 28 no. bicycle parking spaces are proposed for the residential units (22 no. at basement level and 6 no. at ground floor). c) Provision of a 96 no. bedroom tourist hostel accommodating 599 no. bedspaces in a mixture of accessible, twin and 4 - 10 no. person bedrooms from first to seventh floor level. The hostel development will comprise a reception / lobby amenity area with ancillary café / bar / co-working space (with a main entrance via Chancery Street and secondary service entrance points at Chancery Street, St. Michan's Place and St. Michan's Street) (approx. 196 sq m), a gym (approx. 54 sq m), staff office (approx. 9 sq m) and a WC, luggage area (approx. 8 sq m), a kitchen (approx. 32 sq m), food and beverage area (approx. 12 sq m), laundry store (approx. 12 sq m), comms room (approx. 1o sq m), bicycle store (approx. 14 sq m) providing for 20 no. bicycle spaces, refuse store (approx. 35 sq m), plant level (approx. 38 sq m) with generator, tank room (62 sq m) all at ground floor level. The first floor level will accommodate a guest kitchen / dining area (approx. 79 sq m), cinema room (approx. 33.5 sq m), guest laundry room (approx. 35 sq m), staff lounge (approx. 24 sq m), staff room (approx. 22 sq m) and linen store (approx. 7 sq m). Additional linen stores are proposed from second to seventh floor levels. d) Reconfiguration of the existing basement level (approx. 115 sq m) is proposed to accommodate a new tank / plant room and a bicycle store (approx. 54 sq m). The development will also provide for all associated site development works and infrastructure including ESB substation and switch room (approx. 30 sq m), green roofs, roof plant, PV panels, site services and connections for foul drainage, surface water infrastructure and water supply

Summary from the register record.

Planning timeline 6 steps

  • 27 Sept 2024
    Application lodged — Standard
  • 31 Mar 2025
    Council decision — Grant
  • 28 Apr 2025
    Appealed to An Coimisiún Pleanála — ABP-322385-25
  • 20 Jan 2026
    Commission decision — Withdrawn
  • 28 Jan 2026
    Final approval
  • 14 Mar 2031
    Approval runs out (estimate)

The site 913 m²

Boundary of Fegan's, Chancery Street as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 3 applications in the last 10 years

Appeals inside the site 2 with An Coimisiún Pleanála

Building work started inside the site 1 commencement notice

Other big developments nearby within 2 km

Everything within 1 km on the map →

Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.