PlanningRegister.ie
South Dublin County Council · SHD3ABP-309916-21 · SHD3-Application to ABP

Glen Abbey Complex

170 apartments7 storeysSquare Foot Property Services LimitedBelgard Road, South Dublin County Council

Approved Sep 2021; first homes signed off Jun 2024.

Also known as Cookstown Industrial Estate.

  1. 9 Apr 2021Received
  2. 21 Sept 2021Approved
  3. 22 Dec 2022Building started
  4. 4 Jun 2024Signed off
Status
Building started
Decision
Approved · 21 Sept 2021
Size
170 apartments · up to 7 storeys
Uses
residential, apartments, creche
Applicant
Square Foot Property Services Limited
Site
9,209 m²

Building progress councils’ figures, Q2 2026

  1. 2021Approved
  2. 2022Building started
  3. 2024First homes signed off1 sign-off

170 homes permitted; building has not started (Q2 2026).

170
homes permitted
0
homes started on site
0
homes completed

completed · under construction · not started · 0 houses and 170 apartments permitted

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 202517000
Q3 202517000
Q4 202517000
Q1 202617000
Q2 202617000

The scheme

Square Foot Property Services Limited proposes the demolition of existing industrial and office buildings at the Glen Abbey Complex on Belgard Road. The development consists of 170 build-to-rent apartment units and a creche arranged in two blocks ranging from four to seven storeys. The project includes basement parking, communal amenity spaces, and associated site infrastructure.

it involves the construction of 170 apartment units

What the register says

Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100)

Summary from the register record.

Planning timeline 5 steps

  • 9 Apr 2021
    Application lodged — SHD
  • 21 Sept 2021
    Council decision — Grant
  • 21 Sept 2021
    Commission decision — Granted with conditions
  • 21 Sept 2021
    Final approval
  • 4 Nov 2026
    Approval runs out (estimate)

The site 9,209 m²

Boundary of Glen Abbey Complex as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 3 applications in the last 10 years

Appeals inside the site 1 with An Coimisiún Pleanála

Other big developments nearby within 2 km

Everything within 1 km on the map →

Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.