PlanningRegister.ie
South Dublin County Council · SDZ25A/0013W · SDZ Application

Adamstown Boulevard Development Area

886 apartments9 storeysEvara Developments LimitedSouth Dublin County Council

Approved Nov 2025; no start notice yet.

Also known as Development Area 10.

  1. 15 Apr 2025Received
  2. 24 Nov 2025Approved
  3. 23 Nov 2030Approval runs out
Status
Approved No start yet
Decision
Approved · 24 Nov 2025
Size
886 apartments · up to 9 storeys
Uses
residential, apartments
Applicant
Evara Developments Limited
Site
5.14 ha

Building progress councils’ figures, Q2 2026

877 homes permitted; building has not started (Q2 2026).

877
homes proposed
877
homes permitted
0
homes started on site
0
homes completed

completed · under construction · not started · 0 houses and 877 apartments permitted

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 2025———
Q3 2025000
Q4 202587700
Q1 202687700
Q2 202687700

The scheme

Evara Developments Limited proposes the construction of 886 residential dwellings in the Adamstown Boulevard Development Area. The development consists of 13 buildings ranging from 3 to 9 storeys in height located in the townlands of Gollierstown and Finnstown. The project includes associated infrastructure such as car parking, cycle stores, and internal road networks.

it involves the construction of 886 residential units

What the register says

This Application is being made in accordance with the Adamstown Planning Scheme 2014 (as amended) and relates to Phase 2 of development within the 'Adamstown Boulevard Development Area' (Development Area 10) of the Adamstown Strategic Development Zone. The proposed development will principally consist of the construction of 886 No. residential dwellings (39 No. studios, 413 No. 1-bed, 394 No. 2-bed and 40 No. 3-bed) set out in 13 No. buildings (arranged in blocks identified as Nos. 1-9) ranging in height from 3 No. to 9 No. storeys, with a single-storey podium/under croft car park area connecting Blocks 5, 6 and 7. Of the 886 No. units: 840 No. are apartment dwellings, comprised of 39 No. studios, 390 No. 1-bed, 394 No. 2-bed and 17 No. 3-bed; and 46 No. are duplex dwellings, comprised of 23 No. 1-bed and 23 No. 3-bed. The overall development extends to 77,515 sq. m gross floor area, which includes the podium/under croft car park area of 5,456 sq. m gross floor area. The development will also include: 2 No. internal resident communal amenity spaces in Blocks 1 and 9 (totalling 397 sq. m); alterations to the existing 'Farmer's Access Bridge' including changes to bracings and structural supports to facilitate vehicular and pedestrian movements, landscaping and 2 No. cycle stores; vehicular junctions and internal road, cycle and pedestrian network; 357 No. car parking spaces, of which 182 No. are on-street/at-grade and 175 No. are proposed in the podium/under croft car park area at Blocks 5, 6 and 7; 7 No. vehicular set down bays; bus stand; cycle parking (including 5 No. as standalone single-storey plant and cycle store buildings, and 2 No. as cycle stores beneath the 'Farmer's Access Bridge'); plant, including at rooftop; bin storage areas; hard and soft landscaping, including boundary treatments; private amenity spaces (as balconies and terraces facing all aspects); boundary treatments; public lighting; 6 No. sub-stations (including 1 No. as a double sub-station); rooftop lift overruns; rooftop PV arrays; and all associated site and development works above and below ground

Summary from the register record.

Planning timeline 4 steps

  • 30 Sept 2025
    Application lodged — DZ
  • 24 Nov 2025
    Council decision — Grant
  • 24 Nov 2025
    Final approval
  • 7 Jan 2031
    Approval runs out (estimate)

The site 5.14 ha

Boundary of Adamstown Boulevard Development Area as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 6 applications in the last 10 years

Appeals inside the site 1 with An Coimisiún Pleanála

Other big developments nearby within 2 km