Adamstown District Centre Phase Three
Building: 292 finished, 144 under construction of 436 apartments (Q2 2026).
9 storeysQuintain Developments Ireland LimitedLucan, South Dublin County Council
Email me when the next phase is lodged
Also known as Adamstown Phase Three.
- Status
- Building started
- Decision
- Approved · 6 Oct 2022
- Height
- up to 9 storeys
- Uses
- residential, apartments
- Applicant
- Quintain Developments Ireland Limited
- Site
- 2.45 ha
Building progress councils’ figures, Q2 2026
- 2022Approved
- 2026Building started
- 2025First homes signed off4 sign-offs
completed · under construction · not started · 0 houses and 436 apartments permitted
Quarter by quarter
| Quarter | Permitted | Under construction | Completed | Completed share |
|---|---|---|---|---|
| Q2 2025 | 436 | 436 | 0 | |
| Q3 2025 | 436 | 436 | 0 | |
| Q4 2025 | 436 | 436 | 0 | |
| Q1 2026 | 436 | 436 | 0 | |
| Q2 2026 | 436 | 144 | 292 |
Source and licence
The scheme
Quintain Developments Ireland Limited proposes the construction of Phase Three of the Adamstown District Centre in Gollierstown, Lucan. The development consists of 436 apartments across three blocks ranging from 2 to 9 storeys in height. The project includes an ancillary resident's pavilion building and associated amenity facilities.
What the register says
Phase Three of the Adamstown District Centre and consists of 37,402sq.m (gross floor area including car parking and storage) of residential development to be constructed in 3 blocks ranging in height from 2 to 9 storeys; There is a total of 436 apartments, comprising 9 studio apartments, 204 one bedroom apartments, 213 two bedroom apartments and 10 three bedroom apartment; An ancillary resident's pavilion building (2 storey) is linked to Block D, ancillary resident's amenity rooms and facilities are also provided at ground floor level of Block A; All apartments are provided with private open space in the form of balconies or gardens; The proposed block description is as follows: Block A (c. 11,821sq.m gross floor area): 4 - 5 storeys in height, with a total of 143 apartments (70 one bedroom apartments, 67 two bedroom 4 person apartments and 6 no. 3-bedroom apartments); A resident's only podium level, courtyard is provided within Block A; Ancillary plant, storage, waste, and internal bicycle parking rooms provided at ground floor level; Block C (c. 9,680sq.m gross floor area): 4 - 9 storeys in height, with a total of 124 apartments {60 one bedroom apartments, 5 two bedroom 3 person apartments, 55 two bedroom 4 person apartments and 4 three bedroom apartments). Communal open space is provided within 2 parcels of land to the east of Block C between Block C and Block D. Ancillary plant, waste and internal bicycle parking rooms provided at ground floor level; Block D (c.12,757sq.m gross floor area): 2 - 5 storeys in height, together with linked ancillary resident's pavilion building (2 storey). Block D comprises a total of 169 apartments (9 studio apartments, 74 one bedroom apartments, 11 two bedroom 3 person apartments, and 75 two bedroom 4 person apartments); Communal open space is provided within 2 parcels of land within Block D; Ancillary plant, amenity rooms and internal bicycle parking rooms provided at ground floor level. Ancillary plant, waste and internal bicycle parking rooms provided at ground floor level; on lands generally bounded by Adamstown Avenue to the north, to the east by undeveloped lands which benefit from planning permission Reg. Ref. SDZ20A/0008 (as amended by SDZ20A/0016, SDZ20A/0018 and SDZ21A/0017), to the south by Station Road, the railway line and train station and to the west by the railway overpass and its approach road, known locally as the farmer's bridge
Summary from the register record.
Planning timeline 5 steps
- 14 Apr 2022Application lodged — DZ
- 6 Oct 2022Council decision — Grant
- 27 Aug 2023Final approval
- 26 Mar 2026Building started
- 11 Oct 2028Approval runs out (estimate)
The site 2.45 ha
Boundary of Adamstown District Centre Phase Three as the Dublin councils map it in the housing pipeline.
Planning applications inside the site 8 applications in the last 10 years
- GrantedA site of approximately 5.12 Ha, in the townlands of Gollierstown and Finnstown, south-west of Lucan, Dublin
- GrantedA site of approximately 5.12 Ha in the townlands of Gollierstown and Finnstown, south-west of Lucan, Co Dublin
- CommencedIn the townland of Gollierstown, Adamstown, Lucan, Co. Dublin
- CommencedAdamstown, Co Dublin
- CommencedIn the townland of Gollierstown, Adamstown, Lucan, Co. Dublin
- GrantedIn the townland of Gollierstown, Adamstown, Lucan, Co. Dublin
- CommencedIn the townland of Gollierstown, Adamstown, Lucan, Co. Dublin
- CommencedIn the townland of Gollierstown, Adamstown, Lucan, Co. Dublin
Appeals inside the site 1 with An Coimisiún Pleanála
Commencement notices inside the site 1
Other big developments nearby within 2 km
- Gollierstown · first homes signed off 2024 · 26 m away
- Adamstown Boulevard Development Area · approved 2025, no start notice · 886 homes · 9 storeys · 58 m away
- Adamstown Boulevard Development Area Phase 1 · first homes signed off 2025 · 423 homes · 9 storeys · 72 m away
- Block E Station View · building started 2025 · 79 m away
- Finnstown & Gollierstown · approved 2024, no start notice · 134 m away
- The Crossings Phase 3 · approved 2026, no start notice · 214 homes · 9 storeys · 145 m away
- SDCC Lands @28 Locations · lodged 2026, not decided · 145 m away
- Adamstown Boulevard · first homes signed off 2025 · 178 m away
Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.