PlanningRegister.ie
Fingal County Council · SHD/004/21 · Strategic Housing Development

Including part of the grounds of Lamorlaye

Building started Dec 2023.

Inside the site now: open for comments, lodged 30 Oct 2026 · F26A/0965E →

CE Cladewell Estates LtdFingal County Council

Email me when the next phase is lodged

Status
Building started
Decision
Decision to be made by other body · 28 Mar 2023
Applicant
CE Cladewell Estates Ltd · 2 planning applications
Site
2.90 ha

Is it built?

  1. Not yetApproved
  2. 2023Building started
  3. Not yetFirst homes signed off

The scheme

What the register says

ABP-313265-22 The proposed development on a site of approximately 2.83Ha consists of 100no. residential units in a mix of houses, duplex, own door apartment and apartment buildings ranging in height from 2 to 4 storeys overall; comprising of 34no. 2 to 3 storey semi-detached, terraced and end of terrace houses (29no. 3-bedroom houses and 5no. 4 bedroom houses); 4no. 3 storey duplex and own door apartment blocks (24no. 2-beds and 14no. 3-beds); 1no. 4 storey apartment block (12no. 1-beds and 16no. 2-beds). The proposed development also includes; 1no. childcare facility (c. 189.5sq m) located at ground floor level of Duplex Block 1 and associated outdoor play space c.142sqm; public open space (c. 4,319sq m); private open space (c. 2,637sqm private rear gardens serving housing and c. 686sqm balconies and terraces serving apartments and duplexes) and communal amenity open space (c. 479sq m); public lighting and street lighting; 151no. car parking spaces (4no. creche spaces, 68no. house spaces, 79no. apartment and duplex spaces (66no. residential and 13no. visitor car parking spaces); 120no. secure bicycle parking spaces (32no. residential apartment spaces, 48no. residential duplex and own door apartment spaces, 4no. creche spaces and 36no. visitor bicycle parking spaces); bicycle storage; bin storage; 1no. ESB substation; provision of temporary foul sewage holding tank and lifting station; provision of internal road network, including new road carriageways, pedestrian facilities; primary vehicular access serving the proposed development is via a new access road off Back Road; a new separate pedestrian and cycle access serving the proposed development to the west of Lamorlaye off Back Road; demolition of out buildings/stables (c. 168sqm) all associated and ancillary site development and infrastructural works including, laying a foul rising main along Back Road from the new access to the development to the junction of Back Road and Kinsealy Lane and 817m southwards al…

Cut short by the council feed. Full text ↗

Summary from the register record.

Planning timeline
  1. 8 Apr 2022Received
  2. 28 Mar 2023Decision to be made by other body

The site 2.90 ha

Boundary of Including part of the grounds of Lamorlaye from the planning application.

Planning applications inside the site 32 applications in the last 10 years

Show 24 more
Appeals inside the site 15 with An Coimisiún Pleanála
Commencement notices inside the site 1

Other big developments nearby within 2 km

Start notices are matched from the national building control register; a start on site can be missed.

Everything within 1 km on the map →