Northwood Nursing Home
Building: first homes signed off Apr 2023, of 118 homes; approved Dec 2022.
Old Ballymun Road, Fingal County Council
Email me when the next phase is lodged
- Status
- Building started
- Decision
- Approved & grant retention · 7 Dec 2022
- Site
- 4,555 m²
Is it built?
- 2022Approved
- 2023Building started
- 2023First homes signed off1 sign-off
The scheme
What the register says
The proposed development seeks permission for retention of development and permissuion for develoment comprising, inter alia, amendments to the existing nursing home which contains 109 no. bedrooms and 118 no. bedspaces. The parent permission granted a total of 110 no bedrooms (102 no. single and 8 no. double) and 118 no. bedspaces under Reg Ref. F14A/0145. Retention Permission is now sought for a reduction of 2 no. single bedrooms and an increase in 1 no. double bedroom for a total of 100 no. single bedrooms and 9 no. double bedrooms. Retention Permission is also sought for minor modifications to the fenestration of the rear (east) elevation and revisions to rear (east) facade treatment to include an additional section of zinc cladding with vvertical standing seams. Permission is now sought for development comprising the internal reconfiguration of rooms on the ground floor level to include: a) replacement of existing activity room with bedroom (19 sq.m) and en-suite (4.4 sq.m); b) replacement of family room, sitting room and duty base with 2 no. bedrooms (16.4 sq.m and 16.5 sq.m) and 2 no. en-suites (4.4 sq.m) and family room (16.6 sq.m); c) replacement of Snoezelen room with duty base (9.8 sq.m); d) replacement of assisted bath with store room (13.8 sq.m) and, e) minor modifications to internal wall and door configurations. The proposed development will result in an overall bedroom count of 112 no. bedrooms and 121 no. bedspaces - a net increase of 3 no. bedrooms and 3 no. bedspaces from that constructed, and 2 no. bedrooms and 3 no. bedspaces from that permitted, and will result in amendments to development permitted under Reg. Ref. F14A/0145 and F18A/0206, now constructed. AI received 12/9/2022 CAI received 10/11/2022…
Cut short by the council feed. Full text ↗
Summary from the register record.
Planning timeline
- 10 Nov 2022Received
- 7 Dec 2022Approved
- 20 Jan 2023Final approval
- 9 Feb 2023Building started
The site 4,555 m²
Boundary of Northwood Nursing Home from the planning application.
Planning applications inside the site 6 applications in the last 10 years
- GrantedNorthwood Residential Home, Old Ballymun Road, Dublin 9, D09 H32H
- GrantedLands located at the south-eastern junction of Northwood Avenue & Domv
- GrantedLands located at the junction of Northwood Avenue and Northwood Cresce
- WithdrawnLands located at the south-eastern junction of Northwood Avenue & Domv
- CommencedNorthwood Nursing Home, Old Ballymun Road, Dublin 9, D09 H32H.
- GrantedLands immediately adjacent to the north boundary of Geraldstown House,
Appeals inside the site 1 with An Coimisiún Pleanála
Commencement notices inside the site 1
Other big developments nearby within 2 km
- Northwood Avenue · refused 2023 · 185 homes · 64 m away
- Northwood Avenue and Old Ballymun Road · approved 2026, no start notice · 254 homes · 91 m away
- Northwood Cresent · approved 2024, no start notice · 152 m away
- Northwood Crescent · approved 2023, no start notice · 152 m away
- Swift Square Office Park · approved 2024, no start notice · 310 m away
- c.1.5 hectare site · first homes signed off 2026 · 355 m away
- Site located along Silloge Road and Balbutcher Lane · lodged 2026, not decided · 253 homes · 967 m away
Start notices are matched from the national building control register; a start on site can be missed.