PlanningRegister.ie
Dublin City Council · 2704/21 · Permission

St. Mary's Home

Start notice filed Jul 2021: 64 apartments; approved on appeal May 2023.

A start notice was filed, but the councils' Q2 2026 return counts none of the 64 homes started yet.

4 storeysDublin 4, Dublin City Council

Email me when the next phase is lodged

Also known as 28A Clyde Lane.

Status
Start notice filed
Council decision
Approved · 14 Dec 2021
Height
up to 4 storeys
Uses
residential, apartments
Site
3,271 m²
Appeal
ACP 312425 · Approved with conditions · 15 May 2023

Building progress councils’ figures, Q2 2026

  1. 2023Approved on appeal
  2. 2021Start notice filed
  3. Not yetFirst homes signed off
64
homes permitted

completed · under construction · not started · 0 houses and 64 apartments permitted

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 20256400
Q3 20256400
Q4 20256400
Q1 20266400
Q2 20266400
Source and licence

The scheme

The Pembroke Road Partnership proposes a Build to Rent residential development at St. Mary's Home on Pembroke Park and 28A Clyde Lane. The project involves the conversion of the existing building and the construction of new blocks to provide 64 apartment units. The development includes associated site works, landscaping, and parking.

What the register says

Planning permission for a Build to Rent residential development at this site. The proposed development will consist of: 1. Demolition of non-original extensions to St. Mary’s Home and ancillary structures on site; 2. Alterations to and change of use of the existing building (St. Mary’s Home) from nursing home to Build to Rent (BTR) residential use, including internal and external alterations, elevational alterations, and the replacement of the existing roof structure providing for an additional storey, to provide 23 no. BTR residential units (Block A), along with resident support facilities, and resident services and amenities located at ground floor level; 3. Construction of a new part three and part four storey building to the north of and connected to the existing building, to provide 22 no. BTR residential units (Block B); 4. Construction of a new three storey building to the east of the existing building, to provide for 16 no. BTR residential units (Block C); 5. Construction of 3 no. new two storey BTR duplex units to the south of the existing building (Block D); 6. The proposed development will provide a total of 64 no. Build to Rent residential apartment units comprising 19 no. studio apartments, 41 no. one bedroom apartments (including the 3 no. duplex units within Block D) and 4 no. two bedroom apartments; 7. The development will comprise a total gross floor area (GFA) of c. 4,302 sqm; 8. The development includes all associated site development works, car and bicycle parking spaces, solar panels at roof level, bin stores, bicycle store, plant, hard and soft landscaping, boundary treatments, widening of vehicular access from Pembroke Park, pedestrian access points from Clyde Lane and Pembroke Park, foul and surface water drainage, and all other ancillary works, including temporary site hoarding and marketing signage

Summary from the register record.

Planning timeline 6 steps
  • 30 Apr 2021
    Application lodged — Standard
  • 14 Dec 2021
    Council decision — Grant
  • 22 Jan 2022
    Appealed to An Coimisiún Pleanála — ABP-312424-22
  • 15 May 2023
    Commission decision — Granted
  • 15 May 2023
    Final approval
  • 29 Jun 2028
    Approval runs out (estimate)

The site 3,271 m²

Boundary of St. Mary's Home as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 3 applications in the last 10 years

Appeals inside the site 4 with An Coimisiún Pleanála

Other big developments nearby within 2 km

Start notices are matched from the national building control register; a start on site can be missed.