St. Mary's Home
Start notice filed Jul 2021: 64 apartments; approved on appeal May 2023.
A start notice was filed, but the councils' Q2 2026 return counts none of the 64 homes started yet.
4 storeysDublin 4, Dublin City Council
Email me when the next phase is lodged
Also known as 28A Clyde Lane.
- Status
- Start notice filed
- Council decision
- Approved · 14 Dec 2021
- Height
- up to 4 storeys
- Uses
- residential, apartments
- Site
- 3,271 m²
- Appeal
- ACP 312425 · Approved with conditions · 15 May 2023
Building progress councils’ figures, Q2 2026
- 2023Approved on appeal
- 2021Start notice filed
- Not yetFirst homes signed off
completed · under construction · not started · 0 houses and 64 apartments permitted
Quarter by quarter
| Quarter | Permitted | Under construction | Completed | Completed share |
|---|---|---|---|---|
| Q2 2025 | 64 | 0 | 0 | |
| Q3 2025 | 64 | 0 | 0 | |
| Q4 2025 | 64 | 0 | 0 | |
| Q1 2026 | 64 | 0 | 0 | |
| Q2 2026 | 64 | 0 | 0 |
Source and licence
The scheme
The Pembroke Road Partnership proposes a Build to Rent residential development at St. Mary's Home on Pembroke Park and 28A Clyde Lane. The project involves the conversion of the existing building and the construction of new blocks to provide 64 apartment units. The development includes associated site works, landscaping, and parking.
What the register says
Planning permission for a Build to Rent residential development at this site. The proposed development will consist of: 1. Demolition of non-original extensions to St. Mary’s Home and ancillary structures on site; 2. Alterations to and change of use of the existing building (St. Mary’s Home) from nursing home to Build to Rent (BTR) residential use, including internal and external alterations, elevational alterations, and the replacement of the existing roof structure providing for an additional storey, to provide 23 no. BTR residential units (Block A), along with resident support facilities, and resident services and amenities located at ground floor level; 3. Construction of a new part three and part four storey building to the north of and connected to the existing building, to provide 22 no. BTR residential units (Block B); 4. Construction of a new three storey building to the east of the existing building, to provide for 16 no. BTR residential units (Block C); 5. Construction of 3 no. new two storey BTR duplex units to the south of the existing building (Block D); 6. The proposed development will provide a total of 64 no. Build to Rent residential apartment units comprising 19 no. studio apartments, 41 no. one bedroom apartments (including the 3 no. duplex units within Block D) and 4 no. two bedroom apartments; 7. The development will comprise a total gross floor area (GFA) of c. 4,302 sqm; 8. The development includes all associated site development works, car and bicycle parking spaces, solar panels at roof level, bin stores, bicycle store, plant, hard and soft landscaping, boundary treatments, widening of vehicular access from Pembroke Park, pedestrian access points from Clyde Lane and Pembroke Park, foul and surface water drainage, and all other ancillary works, including temporary site hoarding and marketing signage
Summary from the register record.
Planning timeline 6 steps
- 30 Apr 2021Application lodged — Standard
- 14 Dec 2021Council decision — Grant
- 22 Jan 2022Appealed to An Coimisiún Pleanála — ABP-312424-22
- 15 May 2023Commission decision — Granted
- 15 May 2023Final approval
- 29 Jun 2028Approval runs out (estimate)
The site 3,271 m²
Boundary of St. Mary's Home as the Dublin councils map it in the housing pipeline.
Planning applications inside the site 3 applications in the last 10 years
Appeals inside the site 4 with An Coimisiún Pleanála
- Granted with conditionsArdoyne House, Pembroke Park, Dublin 4, D04 F3C3
- Granted with conditionsSt. Mary's Home, Pembroke Park and 28A Clyde Lane, Dublin 4
- Granted with conditionsSt. Conleth's College, 28 Clyde Road, Dublin 4 (a Protected Structure) and 28a Clyde Lane, Dublin 4
- Granted with conditionsArdoyne House, Pembroke Park, Dublin 4, D04 F3C3
Other big developments nearby within 2 km
- Montrose Block 5 · lodged 2026, not decided · 117 homes · 13 storeys · 677 m away
- Former RTÉ Campus at Montrose · lodged 2026, not decided · 511 homes · 677 m away
- Former Smurfit Paper Mills Site · withdrawn or invalid · 167 homes · 7 storeys · 1.3 km away
- Former Murphy and Gunn Site · approved 2025, no start notice · 74 homes · 1.4 km away
- Sandymount Place · approved 2025, no start notice · 67 homes · 4 storeys · 1.6 km away
- Sandymount Avenue Residential Development · first homes signed off 2026 · 69 homes · 3 storeys · 1.6 km away
- 62-64 Fenian Street · approved 2025, no start notice · 82 homes · 3 storeys · 1.6 km away
- 62-64 Fenian Street and Bass Place · approved 2024, no start notice · 87 homes · 10 storeys · 1.6 km away
Start notices are matched from the national building control register; a start on site can be missed.
Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.