Townlands of
Building: first homes signed off Nov 2026, of 56 homes.
Dublin 15, Fingal County Council
Email me when the next phase is lodged
- Status
- Building started
- Decision
- Invalid application · 16 Sept 2025
- Site
- 2.35 ha
Is it built?
- Not yetApproved
- 2026Building started
- 2026First homes signed off1 sign-off
The scheme
What the register says
Castlethorn Developments Luttrellstown Limited, intends to apply for Permission at a site (c. 2.35ha) in the townlands of Porterstown and Kellystown, Dublin 15. The site (Luttrellstown Gate Phase 2 - Site A) is located within the Kellystown Local Area Plan development boundary. The site is generally bounded to the north by the Dublin-Maynooth rail line, to the south by permitted Strategic Housing Development (ABP-312318-21 as amended by LRD0034/S3) known as Luttrellstown Gate (Phase 1), to the east by concurrent planning application known as Luttrellstown Gate (Phase 2 - Site B) and to the west by agricultural lands. The site boundary extends to the southwest to accommodate foul drainage to a permitted foul pumping station and surface water drainage to a permitted attenuation pond (both on Phase 1 lands permitted under ABP-312318-21 as amended by LRD0034/S3). The proposed development comprises 56 no. dwellings, in a mix of houses and duplex units / own-door apartments, ranging from 2-3 storeys in height, including 50 no. houses (33 no. 3-bed and 17 no. 4-bed), and 6 no. duplex/apartment units with balconies (4 no. 1-bed and 2 no. 2-bed); and all associated and ancillary site development, landscaping and boundary treatment works, including: 79 no. surface car parking spaces; 71 no. bicycle parking spaces for mid-terrace and duplex units; Bin stores; Private, communal and public open space; Public lighting; Minor amendments to the permitted surface water attenuation pond. Vehicular access is provided off the existing Kellystown Link Road via the internal roads of Luttrellstown Gate (Phase 1)…
Cut short by the council feed. Full text ↗
Summary from the register record.
Planning timeline
- 12 Sept 2025Received
- 16 Sept 2025Invalid application
The site 2.35 ha
Boundary of Townlands of from the planning application.
Planning applications inside the site 6 applications in the last 10 years
- CommencedLands in the Townlands of Kellystown and Porterstown, Dublin 15
- CommencedLands in the Townlands of Kellystown and Porterstown, Dublin 15
- WithdrawnLands in the Townlands of, Kellystown and Porterstown,, Dublin 15
- WithdrawnLands in the Townlands of Kellystown and Porterstown, Dublin 15
- RefusedThe townlands of Porterstown and Kellystown, Dublin 15
- CommencedIn the townlands of Kellystown, Porterstown and Diswellstown, Clonsill
Appeals inside the site 8 with An Coimisiún Pleanála
- OtherLands in the Townlands of Kellystown and Porterstown, Dublin 15
- OtherLands in the Townlands of Kellystown and Porterstown, Dublin 15
- OtherKellystown, Clonsilla, Dublin 15
- OtherKellystown, Clonsilla, Dublin 15
- OtherKellystown, Clonsilla, Dublin 15
- GrantedKellystown, Clonsilla, Dublin 15
- OtherCounty Dublin, County Meath, County Kildare
- Granted with conditionsIn the townlands of Kellystown, Porterstown and Diswellstown, Clonsilla, Dublin 15. (www.kellystownshd2.com)
Commencement notices inside the site 1
Other big developments nearby within 2 km
- Kellystown · first homes signed off 2026 · 13 m away
- Old Schoolhouse Site (former Clonsilla School · refused 2021 · 220 m away
- Porterstown · approved 2026, no start notice · 250 m away
- Clonsilla Inn · approved 2025, no start notice · 287 m away
- Weavers Row · refused 2022 · 76 homes · 296 m away
- Porterstown Road · refused 2021 · 99 homes · 356 m away
- Allendale House · approved 2026, no start notice · 56 homes · 1.7 km away
- Winterwood · lodged 2026, not decided · 30 homes · 1.8 km away
Start notices are matched from the national building control register; a start on site can be missed.