Allendale House
Approved Nov 2026: 56 homes; no start notice yet.
Start notices are matched from the national building control register; a start on site can be missed.
Clonsilla Road, Fingal County Council
- Status
- Approved · no start notice yet
- Decision
- Approved · 6 Nov 2026
- Site
- 1.48 ha
The scheme
What the register says
Planning Permission for amendments to a previously permitted residential scheme under Planning Ref. No. FW24A/0388E comprising of 56 units across 6 blocks (2-3 storeys) on lands south of Allendale House (Protected Structure, RPS 0704), with access from Clonsilla Road, Clonsilla, Dublin 15. No Changes are proposed to the as-granted Blocks 1,2,3 and 6. An overall increase in the density of residential units from 56 to 74 units in total. The proposed modification is to the granted 24 units in Blocks 4 & 5 (3 storey) that includes: I. Proposed modifications to Blocks 4 and 5 (now 4-storey duplex blocks) that will consist of 21 units per block (7 No. 2 beds, 7 No. 1 Beds and 7 No. 3 beds), contributing to the overall increase of 18 units in total. II. Minor modifications to the public open space to accommodate additional car parking spaces. III. Provision of Private amenity space, communal open space, Bicycle, bin storage and all ancillary works, including drainage, landscaping and boundary treatments, necessary to facilitate the development. Additional information received 12/10/26…
Cut short by the council feed. Full text ↗
Summary from the register record.
Planning timeline
- 17 Apr 2026Received
- 6 Nov 2026Approved
- 6 Nov 2031Approval runs out
The site 1.48 ha
Boundary of Allendale House from the planning application.
Planning applications inside the site 3 applications in the last 10 years
Appeals inside the site 1 with An Coimisiún Pleanála
Other big developments nearby within 2 km
- Barberstown · lodged 2022, not decided · 862 m away
- Old Schoolhouse Site (former Clonsilla School · refused 2021 · 1.2 km away
- Weavers Row · refused 2022 · 76 homes · 1.3 km away
- Clonsilla Inn · approved 2025, no start notice · 1.6 km away
- Townlands of · withdrawn or invalid · 56 homes · 1.7 km away
- Kellystown · first homes signed off 2026 · 1.7 km away
- Porterstown Road · refused 2021 · 99 homes · 1.9 km away
- Porterstown · approved 2026, no start notice · 2.0 km away
Start notices are matched from the national building control register; a start on site can be missed.