PlanningRegister.ie
Dublin City Council · 3068/24

75-78 Cork Street, Dublin 8

Approved in Apr 2024. Building started in 2024.

Inside the site of 75-78 Cork Street (54 homes).

  1. 19 Jan 2024Received
  2. 8 Mar 2024Approved
  3. 4 Apr 2024Appealed
  4. 4 Apr 2024Appeal: Invalid
  5. 10 Apr 2024Final approval
  6. 14 Jun 2024Building started

Planning details

Status
Building startedi
Decision
Approved · 8 Mar 2024
Reference
3068/24
Received
19 Jan 2024
Site
227 m²
Appeal
ACP 319455 · Invalid

What’s proposed

In plain English

Modifications to a mixed-use development at 75-78 Cork Street

The applicant wants to change the layout of a previously approved mixed-use development. This includes moving the ESB substation and meter room and changing the pedestrian access.

  • Relocating the ESB substation and meter room
  • Altering the pedestrian access
Written by AI from the council’s description

An AI model rewrote the council’s description below in everyday words on 9 Oct 2026. It was told to use only that text, and every number it wrote was checked against it. It says nothing about whether the application will be approved. The council’s wording and planning file are the record.

The council’s description

Modifications to a mixed-use development permitted under Reg. Ref. 3619/18 (as extended by Reg. Ref. 3619/18/X1) at No. 75-78 Cork Street, Dublin 8. The application site comprises of c.0.02 hectares and is bound by Cork Street to the south east, No. 79 Cork Street to the east, No. 74 Cork Street to the south-west and Our Lady's Road and Rosary Road to the north-west.

Show all

The modifications proposed to the permitted scheme include relocation of the permitted ESB substation within the development in order to facilitate service access from Our Lady's Road. The modification also includes the provision of a meter room associated with the substation and alterations to the permitted pedestrian access, landscaping and carparking within the development. All other elements of the permitted development will remain unchanged and the development will be otherwise carried out in accordance with parent permission Reg. Ref. 3619/18 as extended

29 other applications within 500 m in the last year

Open the report

Nearby 29 · 500 m · 12 months

Distance
Time
Show all 29

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Appeal

ACP 319455 · Planning Appeal · decided · Invalid 4 Apr 2024
received by the Commission 4 Apr 2024

Building started

  • 14 Jun 2024 · Builder told the council work was starting (seven-day notice) SN0010490DC

Zoning

Zone Z1 - DEV PLAN 2022-2028

M3 — Neighbourhood centre

A local centre: shops, services and apartments over them, serving the surrounding housing.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • NIAH-recorded building · 4
    Brú Chaoimhín
  • Recorded monument · 5
    Graveyard; Watercourse
Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

3068/24 is a planning application to Dublin City Council for modifications to a mixed-use development permitted under Reg. Ref. 3619/18 (as extended, received on 19 Jan 2024; permission was granted on 8 Mar 2024.