PlanningRegister.ie
Dublin City Council · 3143/22

Convent Avenue, Dublin 3, D03 FA02

  1. 25 Jan 2022Received
  2. 21 Mar 2022Refuse permission
  3. 19 Apr 2022Appealed
  4. 5 Jan 2023Appeal: Withdrawn
Status
Appeal decided — withdrawn
Decision
Refuse permission · 21 Mar 2022
Council
Dublin City Council
Type
Permission
Site
1,260 m²
Appeal
ACP 313389 · Withdrawn

What’s proposed

Permission for an apartment development. The proposed development will include: a) The demolition of the existing single-storey warehouse structure, offices, fences, walls, and railings b) The construction of an apartment development of 2 no. six storey blocks (with a setback level at fifth-floor level) with a total of 18 no. student accommodation apartments (8 no. 5 bed units, 8 no. 6 bed units and 2 no. 7 bed units, totalling 120 no. bed spaces). The ground floors across both blocks will comprise of a total of 4 no. car spaces, 72 no. bicycle spaces, and cargo bike spaces, bin stores, services/ plant room, 2 no. stair and lift cores to access the apartments; c) The development will be accessed by 2 no. pedestrian/ cyclist gates and 4 no. car spaces will be accessed from Convent Avenue. The development includes a fire exit onto Richmond Lodge. d) All associated works including landscaping, planting and boundary treatments, infrastructure, lighting, foul/ surface drainage, site works, necessary to facilitate the development

3143/22 is a planning application to Dublin City Council for permission for an apartment development. The proposed development will include: a) The, received on 25 Jan 2022; permission was refused on 21 Mar 2022.

Planning details

Reference
3143/22
Local authority
Dublin City Council
Status
Appeal decided — withdrawn · register status “Appeal Decided
Received
25 Jan 2022
Observations close
1 Mar 2022 (closed 1663 days ago)
Decision due
21 Mar 2022 · decided 21 Mar 2022
Decision
Refuse permission on 21 Mar 2022
Proposed development
Permission for an apartment development. The proposed development will include: a) The demolition of the existing single-storey warehouse structure, offices, fences, walls, and railings b) The construction of an apartment development of 2 no. six storey blocks (with a setback level at fifth-floor level) with a total of 18 no. student accommodation apartments (8 no. 5 bed units, 8 no. 6 bed units and 2 no. 7 bed units, totalling 120 no. bed spaces). The ground floors across both blocks will comprise of a total of 4 no. car spaces, 72 no. bicycle spaces, and cargo bike spaces, bin stores, services/ plant room, 2 no. stair and lift cores to access the apartments; c) The development will be accessed by 2 no. pedestrian/ cyclist gates and 4 no. car spaces will be accessed from Convent Avenue. The development includes a fire exit onto Richmond Lodge. d) All associated works including landscaping, planting and boundary treatments, infrastructure, lighting, foul/ surface drainage, site works, necessary to facilitate the development
As published by the register.
Site area
1,260 m² from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name

Nearby 185 applications within 500 m in the last 5 years

Show all 185

Explore this area on the map →

Appeal

ACP 313389 · Planning Appeal · decided · Withdrawn 5 Jan 2023
received by the Commission 19 Apr 2022

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    Zone Z1 - DEV PLAN 2022-2028

    M1 — Metro / rail economic corridor

    Z10: Inner Suburban and inner City Sustainable Mixed-Uses: To consolidate and facilitate the development of inner city and inner suburban sites for mixed-uses.

    A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.

    R2 — Existing residential

    Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

    An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

    S5 — Sustainable neighbourhood infrastructure

    Z15: Community and Social Infrastructure: To protect and provide for community uses and social infrastructure.

    Reserved for the schools, creches, community and health facilities a neighbourhood needs.

    Designations within 250 m

    OPW flood extent nearby — flag only (licence); floodinfo.ie.

    • NIAH-recorded building · 12
      St. Vincent's Hospital; St. Vincent's Hospital; St. Vincent's Hospital
    • Radon risk area · 1
      About 1 in 20 homes in this area is likely to have high radon levels
    • Recorded monument · 5
      Castle - unclassified; Burial ground; R149625

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 84881). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open