PlanningRegister.ie
Dublin City Council · 5176/22

80 Philipsburgh Avenue, Fairview, Dublin 3, D03 H3F1

Approved in Dec 2023. Building started in 2025.

  1. 4 Nov 2022Received
  2. 6 Apr 2023Approved
  3. 28 Apr 2023Appealed
  4. 21 Dec 2023Appeal: Approved with conditions
  5. 21 Dec 2023Final approval
  6. 22 Apr 2025Building started
Status
Building startedi
Decision
Approved · 6 Apr 2023
Council
Dublin City Council
Type
Permission
Site
2,710 m²
Appeal
ACP 316593 · Approved with conditions

What’s proposed

PERMISSION: The development proposes the demolition of the existing 2 storey building on site (approx. 1020.5 sq.m GFA), amendments to the quantum of existing car parking, removal of existing substation on Philipsburgh Avenue, and the construction of 48 no. new residential apartment units ( 48 no. 1 bed units) in 2 no. apartment building, consisting of 1 no. 2-4 storey building (Building A fronting Philipsburgh Avenue) and 1 no. 2-4 storey (Building B rear block). Building A provides 22 no. 1 bed apartment units and Building B provides 26 no. 1 bed apartment units. All units are intended to provide housing for independent living for older residents (60 years plus). An office room (7.2 sq.m), communal room (34.2 sq.m) and Kitchenette/WC (10.5 sq.m) associated with the apartment units will be provided. The development also proposes approx. 372.8 sq.m of communal open space, balconies/ terraces associated with individual apartment units, associated secure bicycle parking, car parking (4 no of spaces) and bin storage, ESB Substation, hard and soft landscaping and all other associated site works and services above and below ground on an overall site area of approx 2681 sq.m Access to the development will be via the existing access point along Philipsburg Avenue, which will be upgraded to provide enhanced pedestrian/vehicular access. Access to adjacent pitch and putt club lands is maintained via the provision of vehicular/pedestrian gates in the south east corner of the site. A Natura Impact Statement has been prepared and submitted with this Planning Application

Planning details

Reference
5176/22
Local authority
Dublin City Council
Status
Commenced · register status “Appeal Decided”
Received
4 Nov 2022
Decision due
6 Apr 2023 · decided 6 Apr 2023
Decision
Grant permission on 6 Apr 2023
Site area
2,710 m² from the mapped boundary, not the council's figure
Applicant
Cabhru Housing Association council register

Live near 80 Philipsburgh Avenue?

Everything else planned on your street, in one report.

Check my street
Council register ↗

Nearby 31 · 500 m · 12 months

Distance
Time
Show all 31

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Appeal

ACP 316593 · Planning Appeal · decided · Approved with conditions 21 Dec 2023
received by the Commission 28 Apr 2023 · inspector's report · board order

Building started

  • 23 Jun 2025 · Builder told the council work was starting CN0130020DC
  • 22 Apr 2025 · Builder told the council work was starting CN0127781DC

Zoning

Zone Z1 - DEV PLAN 2022-2028

G5 — Open space and amenity

Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • EPA-licensed facility · 1
    Everlac Paints Ltd
  • NIAH-recorded building · 5
    St. Vincent's Hospital; post box

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

5176/22 is a planning application to Dublin City Council for PERMISSION: The development proposes the demolition of the existing 2 storey building on, received on 4 Nov 2022; permission was granted on 6 Apr 2023.