PlanningRegister.ie
Dublin City Council · 4376/22

20 Dominick Street Lower, Dublin 1, D01 YP97

Approved in Oct 2022. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

  1. 1 Jul 2022Received
  2. 25 Aug 2022Approved
  3. 7 Oct 2022Final approval
  4. 7 Oct 2027Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Approved · 25 Aug 2022
Reference
4376/22
Received
1 Jul 2022
Site
669 m²

What’s proposed

PROTECTED STRUCTURE: Permission to (i) remove existing pedestrian side access from Dominick Place (ii) introduce vehicular access from Dominick Place to the existing rear yard of No.20 Lower Dominick Street.

Show all

The works will consist of blocking up the existing pedestrian gate, the removal of approximately 3000mm in length of temporary timber fencing and approximately 1200mm in length of the concrete boundary wall to Dominick Place, to create a 4200mm wide opening, in which a double leaf metal swing gate will be installed, with each gate leaf measuring 2000mm in width and 3000mm in height approximately , and all ancillary works. No. 20 Lower Dominick Street is a Protected Structure

49 other applications within 500 m in the last year · 1 open for comments

Open the report

Nearby 49 · 500 m · 12 months

Distance
Time
Show all 49

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Zoning

Zone Z8 - DEV PLAN 2022-2028

O2 — Green belt

Zoned to protect the open land between urban areas. Development is strongly resisted.

Protections nearby 250 m

  • NIAH-recorded building · 95
    Brendan Dunne; Thai & Chinese Massage
  • Recorded monument · 7
    House - indeterminate date; R149593
Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

4376/22 is a planning application to Dublin City Council for PROTECTED STRUCTURE: Permission to (i) remove existing pedestrian side access from, received on 1 Jul 2022; permission was granted on 25 Aug 2022.