PlanningRegister.ie
Dublin City Council · WEB1918/25

133-136 Capel Street, Dublin, D01 YK09

Declared invalid.

  1. 25 Apr 2025Received
  2. 8 May 2025Application declared invalid
Status
Withdrawn or invalid
Decision
Application declared invalid · 8 May 2025
Council
Dublin City Council
Type
Permission
Site
226 m²

What’s proposed

PROTECTED STRUCTURE: Beannchor Group intend to apply for Planning Permission for Change of Use for the ground floor and basement levels at 134 Capel Street, D01YK09 and 136 Capel Street D01 T2C9 (commercial to restaurant), properties listed wholly or in part as Protected Structures (Ref Numbers: 1214 & 1216) in the Dublin City Council Development Plan 2022-2028. The development will consist of: Alterations to the ground floor and basement levels of 134 and 136 Capel Street for the change of use from commercial to two separate restaurant premises including; the demolition of internal modern partitions, modern display-stand fittings and modern wall panelling to No.134; the retention and protection with suitable covering of original flooring, cornicing and other wall and ceiling features to No.134 and the demolition of internal modern partitions at No.136. Alterations to the Capel Street (east) elevation of both units; the removal of modern fascia, associated framing and roller shutters to the shopfront on ground level. Alterations to the North Elevation of No.134 including the demolition of approx.2 sq/m area of wall to provide a ‘take-away’ hatch connection to the proposed restaurant premises within the adjoining rear hotel, accessed through No. 133 Capel Street (Permitted hotel development 4554/23 which amends the application granted under DCC Reg Ref 3274/20/ABP Reg Ref APB-309407-21 and subsequently amended under 3463/22), not impacting the special interest of the protected structure. Renovation to the ground floor and basement levels of both units to include the insertion of new sanitary and kitchen facilities; repair and restoration works to original external threshold tiling to No.134

Planning details

Reference
WEB1918/25
Local authority
Dublin City Council
Status
Withdrawn or invalid · register status “Decision Notice Issued”
Received
25 Apr 2025
Observations close
30 May 2025 (closed 528 days ago)
Decision due
19 Jun 2025 · decided 8 May 2025
Decision
Application declared invalid on 8 May 2025
Site area
226 m² from the mapped boundary, not the council's figure

Live near 133-136 Capel Street?

Everything else planned on your street, in one report.

Check my street
Council register ↗

Nearby 65 · 500 m · 12 months

Distance
Time
Show all 65

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Zoning

Zone Z5 - DEV PLAN 2022-2028

M2 — Major town centre

The main town centre — retail, offices, civic uses, apartments.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • NIAH-recorded building · 170
    Morrison Hotel; Evad
  • Recorded monument · 27
    Religious house - Cistercian monks; House - indeterminate date

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

WEB1918/25 is a planning application to Dublin City Council for PROTECTED STRUCTURE: Beannchor Group intend to apply for Planning Permission for Change, received on 25 Apr 2025; the council declared it invalid on 8 May 2025.