PlanningRegister.ie
Dublin City Council · 4544/22

Cambridge House, 22, Cambridge Road, Ringsend, Dublin 4, D04 P635

Decided on appeal: refused.

What’s proposed

Proposed development comprises: the demolition of the existing structures on site (c. 354.5 sqm); and the construction of a 7-storey senior living 'Build-to-Rent' apartment building c. 2,095.2 sqm) (comprising 30 No. 1-bedroom apartments with winter gardens on the northern and southern elevations, indoor residential communal amenity / facility areas at ground floor level, a garden courtyard at ground floor level; and…

Show all

a communal landscaped rooftop garden. The development will also include a bin store to the rear of the site (c. 13.4 sqm), and 45 No. covered cycle spaces (incl 15 No. visitor spaces). This proposal also includes for the provision of 1 No. set-down only car parking space, an entrance pergola with associated gate, awning structures, boundary treatments, hard and soft landscaping, tree planting, provision of piped site wide services and all ancillary works to facilitate construction and operation of the proposed development, both above and below ground

  1. 25 Jul 2022Received
  2. 16 Sept 2022Refuse permission
  3. 12 Oct 2022Appealed
  4. 21 Nov 2023Appeal: Refused

Planning details

Status
Appeal decided — refused
Decision
Refuse permission · 16 Sept 2022
Reference
4544/22
Received
25 Jul 2022
Site
639 m²
Appeal
ACP 314822 · Refused

14 other applications within 500 m in the last year · 1 open for comments

Get the full report

Nearby 14 · 500 m · 12 months

Distance
Time
Show all 14

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Appeal

ACP 314822 · Planning Appeal · decided · Refused 21 Nov 2023
received by the Commission 12 Oct 2022 · inspector's report · board order

Zoning

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

S5 — Sustainable neighbourhood infrastructure

Reserved for the schools, creches, community and health facilities a neighbourhood needs.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • EPA-licensed facility · 1
    Dublin Port Company
  • Recorded monument · 1
    Settlement cluster
Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

4544/22 is a planning application to Dublin City Council for proposed development comprises: the demolition of the existing structures on site (c., received on 25 Jul 2022; permission was refused on 16 Sept 2022.