Dublin City Council · WEB1510/23

2 Pembroke Street, Dublin 4

Approved in Sept 2023. Building started in 2024.

  1. 16 Jun 2023Received
  2. 10 Aug 2023Approved
  3. 26 Sept 2023Final approval
  4. 16 Sept 2024Building started

Planning details

Status
Building startedi
Decision
Approved · 10 Aug 2023
Reference
WEB1510/23
Received
16 Jun 2023
Site
74 m²

What’s proposed

The proposed demolition of the existing ground floor level Utility, Storage, Boiler area of the existing end of terrace house and the proposed construction of a new two storey, flat roof rear extension to provide a ground floor level lounge / dining area, and a proposed first floor level additional bedroom and balcony, with a proposed covered rear yard amenity area, with Perspex lean-to roof and rear door street access and all associated internal reconfigurations and external works to facilitate the development at 2 Pembroke Street, Irishtown Dublin 4 D04 V973

27 other applications within 500 m in the last year · 6 open for comments

Open the report

Nearby 27 · 500 m · 12 months

Distance
Time
Show all 27

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Building started

  • 16 Sept 2024 · Builder told the council work was starting (opted out of the finish sign-off) CN0119413DC

Zoning

Zone Z2 - DEV PLAN 2022-2028

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • Recorded monument · 4
    Settlement cluster; Church
Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

WEB1510/23 is a planning application to Dublin City Council for the proposed demolition of the existing ground floor level Utility, Storage, Boiler area, received on 16 Jun 2023; permission was granted on 10 Aug 2023.