PlanningRegister.ie
Dublin City Council · 4710/22

Presentation Secondary School, Warrenmount, Clarence Mangan Road, Dublin 8

Withdrawn.

Newer file here, lodged 1 Oct 2025: commenced · WEB5266/25 →

What’s proposed

In plain English

New classroom unit and site improvements at Presentation Secondary School

The school wants to build a new single-storey classroom unit and a maintenance room. They also plan to modify the existing vehicle entrance and add a new pedestrian gate.

  • Demolition of the existing boiler room in the rear yard
  • Includes a new glazed canopy and an enclosed soft play area
  • Construction of a new boiler room to the side of the school
  • Widening of the existing gated vehicle entrance
Written by AI from the council’s description

An AI model rewrote the council’s description below in everyday words on 9 Oct 2026. It was told to use only that text, and every number it wrote was checked against it. It says nothing about whether the application will be approved. The council’s wording and planning file are the record.

The council’s description

Permission for demolition of existing boiler room to rear yard and provision of a standalone single storey structure consisting of a single classroom Special Education Unit (proposed floor area = 223sqm) to the rear yard of the existing School (existing School overall floor area = 2623sqm), external glazed canopy connecting back to main school with new enclosed external soft play area and provision of a standalone…

Show all

single storey maintenance room to front yard (proposed floor area = 13sqm), provision of new single storey boiler room to the side of current school (proposed floor area 12sqm), works to modify and widen the existing gated vehicular entrance and provide a new gated pedestrian entrance to existing public footpath, together with all associated site works

  1. 23 Aug 2022Received
  2. 30 Aug 2022Application declared inva

Planning details

Status
Withdrawn or invalid
Decision
Application declared inva · 30 Aug 2022
Reference
4710/22
Received
23 Aug 2022
Site
4,848 m²

43 other applications within 500 m in the last year · 2 open for comments

Get the full report

Nearby 43 · 500 m · 12 months

Distance
Time
Show all 43

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Zoning

Zone Z2 - DEV PLAN 2022-2028

M1 — Metro / rail economic corridor

A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

S5 — Sustainable neighbourhood infrastructure

Reserved for the schools, creches, community and health facilities a neighbourhood needs.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • NIAH-recorded building · 11
    brewery; house
  • Recorded monument · 20
    Water mill - unclassified; House - 18th/19th century
Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

4710/22 is a planning application to Dublin City Council for permission for demolition of existing boiler room to rear yard and provision of a, received on 23 Aug 2022; it was withdrawn on 30 Aug 2022.