PlanningRegister.ie
Dublin City Council · 4939/22

Dublin Central Inn, 95-98, Talbot Street, Dublin 1, D01 HR68

Decided on appeal.

  1. 28 Sept 2022Received
  2. 22 Nov 2022Refuse permission
  3. 19 Dec 2022Appealed
  4. 13 May 2024Appeal: Refused
Status
Appeal decided — refused
Decision
Refuse permission · 22 Nov 2022
Council
Dublin City Council
Type
Permission
Site
887 m²
Appeal
ACP 315379 · Refused

Live near Dublin Central Inn?

Everything else planned on your street, in one report.

Check my street

What’s proposed

The development will consist of the internal demolition and refurbishment of the existing hotel from ground floor to fourth floor level and extension by 2no. floors to provide an overall 7-storey hotel development of c. 29.2m in height consisting of 162 bedrooms (c. 5,224sqm GFA) over existing ground floor commercial development. The development will include amendments to the front elevation including new shop front (excluding the shopfront at No.95), removal of existing balcony railings and new signage. Internally the development will include front of house, bike store and bin storage area, and associated back of house facilities including, linen store, staff rooms, changing areas and associated uses. The development will include an ESB Switch Room of 19.1sqm and LV Room of 14.0sqm at ground floor level and 323.6sqm of plant at 7th floor level. A Green roof of 239.4sqm is provided at roof top level and the development includes all associated site development and site excavation works above and below ground

Planning details

Reference
4939/22
Local authority
Dublin City Council
Status
Appeal decided — refused · register status “Appeal Decided”
Received
28 Sept 2022
Observations close
2 Nov 2022 (closed 1431 days ago)
Decision due
22 Nov 2022 · decided 22 Nov 2022
Decision
Refuse permission on 22 Nov 2022
Proposed development
The development will consist of the internal demolition and refurbishment of the existing hotel from ground floor to fourth floor level and extension by 2no. floors to provide an overall 7-storey hotel development of c. 29.2m in height consisting of 162 bedrooms (c. 5,224sqm GFA) over existing ground floor commercial development. The development will include amendments to the front elevation including new shop front (excluding the shopfront at No.95), removal of existing balcony railings and new signage. Internally the development will include front of house, bike store and bin storage area, and associated back of house facilities including, linen store, staff rooms, changing areas and associated uses. The development will include an ESB Switch Room of 19.1sqm and LV Room of 14.0sqm at ground floor level and 323.6sqm of plant at 7th floor level. A Green roof of 239.4sqm is provided at roof top level and the development includes all associated site development and site excavation works above and below ground
As published by the register.
Site area
887 m² from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name

Nearby 367 · 500 m · 5 years

Show all 367

Explore this area on the map →

Homes nearby

Development land nearby

From Buildable, our sister site for development land in Dublin.

See all development land near here →

Appeal

ACP 315379 · Planning Appeal · decided · Refused 13 May 2024
received by the Commission 19 Dec 2022 · inspector's report · board order

Zoning

Zone Z5 - DEV PLAN 2022-2028

M2 — Major town centre

The main town centre — retail, offices, civic uses, apartments.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • NIAH-recorded building · 215
    MCC Customs Brokers; bridge
  • Radon risk area · 1
    About 1 in 20 homes in this area is likely to have high radon levels
  • Recorded monument · 7
    Bowling green; Glass works

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open
Summary

4939/22 is a planning application to Dublin City Council for the development will consist of the internal demolition and refurbishment of the, received on 28 Sept 2022; permission was refused on 22 Nov 2022.