Dublin City Council · 5431/22

20 & 21, Ormond Quay Upper, Dublin 7, D07 TK75

Refused in Feb 2023.

  1. 13 Dec 2022Received
  2. 15 Feb 2023Refuse permission
Status
Refused
Decision
Refuse permission · 15 Feb 2023
Council
Dublin City Council
Type
Permission
Site
243 m²

What’s proposed

PROTECTED STRUCTURE: The development will consist of; (a) The complete restoration and refurbishment of the B&B buildings to the front of the site, comprising; i. The reroofing of the front roof of the property in natural slate and the renewal of all existing roof lights. ii. Removal of the existing metal fire escape and the repointing of the traditional brickwork to the rear and eastern side of the facade of the property in a NHL 3.5 flush point finish. iii. The replacement of the existing non-original uPVC windows with traditional up and down sash windows to the front and rear of the property. iv. The removal of the existing cementitious render to the front facade of the property and the re-rendering of the facade in an NHL 3.5 lined and ruled rendered finish. v. The restoration of removed historic fabric to the interior of the property including internal doors, shutters, timber linings, traditional plasterwork, new electrical, heating and fire safety installations throughout and the upgrading of the floors, walls and doors to meet structural, servicing and fire safety standards throughout. vi. The complete restoration of the traditional shopfront to the front of the property. vii. Various new internal openings, Internal fit out elements, pavilions, linings and partitions to the ground and upper floors of the property, all ancillary to the existing B&B use. viii. The complete refurbishment of the basement to the front of the property, the lowering of the existing floor, damp proofing works and the provision of a storage area ancillary to the primary B&B use over. (b) The partial demolition and extension of the existing two storey health building to the rear of the property to comprising; (i) The change of use of the existing and extended building to the rear of the property from Health to B&B use. (ii) The partial demolition of the existing building, chimney and defunct water tanks and The provision of a basement below the existing building. (iii) The construction of a new 3 and 5 storey extension to the existing 2 storey building to the rear of the property to provide for 16 bedrooms within a completed 5 and 7 storey building over basement building with a 4th floor access link to the front building. (iv) The relocation of the existing access to the rear of the property from Ormond Place. (v) All associated drainage roof lights, enabling and site works. On completion the proposed development will provide for 31 B&B rooms between the front and rear buildings of the development

Planning details

Reference
5431/22
Local authority
Dublin City Council
Status
Refused · register status “Decision Notice Issued”
Received
13 Dec 2022
Observations close
26 Jan 2023 (closed 1380 days ago)
Decision due
15 Feb 2023 · decided 15 Feb 2023
Decision
Refuse permission on 15 Feb 2023
Site area
243 m² from the mapped boundary, not the council's figure

Live near 20 & 21?

Everything else planned on your street, in one report.

Check my street
Council register ↗

Nearby 68 · 500 m · 12 months

Distance
Time
Show all 68

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Zoning

Zone Z5 - DEV PLAN 2022-2028

M2 — Major town centre

The main town centre — retail, offices, civic uses, apartments.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • NIAH-recorded building · 144
    Marcus A. Lynch & Son; Ormond Court
  • Recorded monument · 80
    Mural tower (Historic Town)

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

5431/22 is a planning application to Dublin City Council for PROTECTED STRUCTURE: The development will consist of; (a) The complete restoration and, received on 13 Dec 2022; permission was refused on 15 Feb 2023.