site between hanger 5 and M50 Garage, North Apron Airside Support, Dub
Withdrawn.
What’s proposed
The development will consist of: a 2-storey airside operations building of c.1,700sq.m and c.7.5m in height accommodating a passenger reception centre for airside emergency incidents and primary support function for thr airport to include operations, maintenance and storage facilities required for the airfield's foreign object debris and snow bases.
Show all
The building will include an open sided area for the parking of HGVs and to store equipment. A new gate will be provided to the compound of the airside operations building to the south within the security restricted area fence line, enabling emergency vehicles direct access; a 2-storey north apron line maintenance centre building of c.1,887sq.m and c.6.8m in height providing a temporary facility accommodating airside workshops and stores at ground level and offices above. Following the completion of longer-term facilities at the North Apron the centre will be removed and the hardstanding will be reused for airside ground servicing equipment storage and staging areas; foreign object debris airside infrastructure to include above ground potassium acetate tanks, fuel tank, skip and container area and tipping ramps; airside parking areas with Electric Vehicle (EV) charging stations for buses and cars; and; a new generator room of c.100sq.m and c.3.9m in height housing electrical equipment. The development will also include site clearance airside north of the critical part of the security restricted area boundary, provision of hard standing areas, smoking shelter, landscaping, fencing and gates, lighting (up to 30m in height), utilities, ancillary parking, external snow base parking, drainage and attenuation systems and all associated site works. AI received…
Cut short by the council feed. Full text ↗
- 27 Jul 2023Received
- 3 Oct 2023App. withdrawn as no c.ai recd in 6 mths
Planning details
- Status
- Withdrawn or invalid
- Decision
- App. withdrawn as no c.ai recd in 6 mths · 3 Oct 2023
- Reference
- F23A/0023
- Received
- 27 Jul 2023
- Further information
- Requested 6 Mar 2023 · received 27 Jul 2023
- Applicant
- DAA PLC
- Site
- 2.30 ha
4 other applications within 500 m in the last year · 1 open for comments
Get the full reportNearby 4 · 500 m · 12 months
- OpenSite A - Hotel Site adjoins the T2 Multi-Storey Car Park to the north of T2, Dublin Airport, Corballis, County Dublin, K67 X4X5
- WithdrawnSite A - Hotel Site adjoins the T2 Multi-Storey Car Park to the north
- WithdrawnSite A - Hotel Site adjoins the T2 Multi-Storey Car Park to the north,
- GrantedNorth Apron, Dublin Airport, Swords, Co. Dublin
- WithdrawnMcDonald's, Dublin Airport Dt, Corballis Road North, Co. Dublin, K67 E
- GrantedCircle K Dublin Airport Service Station, Corballis Road North, Dublin
- CommencedWelcome Wall between the East Link Road and Corballis Road North, Dubl
- WithdrawnDublin Airport, Co. Dublin
- Appeal decidedSpiral Ramps, Terminal 1, Dublin Airport, Collinstown, Co. Dublin, K67
- WithdrawnDublin Airport in the townlands of Millhead, Kilreesk, Kingstown, Dunb
- GrantedDublin Airport, Terminal 1 Arrivals, Terminal Complex, Collinstown, Sw
- WithdrawnDublin Airport, Terminal 1 Arrivals, Terminal Complex, Collinstown, Sw
- CommencedSite between Hanger 5 and M50 garage, North Apron airside support, Dub
- Commenced2no. landside sites, in the townlands of Collinstown, Co. Dublin Airpo
- CommencedTerminal 2 (Adjacent to), Dublin Airport, Corballis, Co. Dublin
- CommencedThree, The Green, Dublin Airport Central, Dublin Airport, Swords, Co.
- Awaiting decisionDublin Airport Co. Dublin
- CommencedSite A- Hotel Site adjoins the T2 Multi-Storey Car Park to the north,
- Appeal decidedLand at and adjoining the North Apron at Dublin Airport,, Co. Dublin,
- Commencedsite to the north of Hangar 6 and north Apron, west of Castlemoate Roa
- GrantedCircle K Dublin Airport Service Station, Corballis Road North, Dublin
- GrantedDublin Airport, Swords, Co. Dublin
- Appeal decidedDepartures routes to and from the Terminal 1 & Terminal 2 - Part of t
- Appeal decidedDublin Airport Purple Zone Staff Car Park, Corballis Way, Corballis, C
Homes nearby
- For sale7 Boroimhe Alder, Swords, Co. Dublin, K67 E177
- For sale13 Boroimhe Hazel, Swords, Co. Dublin, K67 YX09
- For sale51 Boroimhe Beech, Swords, Co. Dublin, K67 Y497
- For sale45 Boroimhe Cedars, Swords, Co. Dublin, K67 NX47
- For sale55 Boroimhe Maples, Swords, Co. Dublin, K67 F384
- For sale16 Ridgewood Green, Ridgewood, Swords, Co. Dublin, K67 AC99
Zoning
DA - Dublin Airport: Facilitate air transport infrastructure and airport related activity/uses only (i.e. those uses that need to be located at or near the airport). All development within the Airport Area (as designated by the Dublin Airport Local Area Plan) should be of a high standard reflecting the status of an international airport and its role as a gateway to the country and region. Minor extensions or alterations to existing properties located within the Airport Area which are not essential to the operational efficiency and amenity of the airport may be permitted, where it can be demonstrated that these works will not result in material intensification of land use. Air Transport Infrastructure includes: aircraft areas, air traffic control/tower, ancillary health, safety and security uses, aprons, cargo handling, maintenance hangers, meteorology, retail – airside/duty free, runways, taxiways, terminals and piers.
Tied to the efficient operation and development of the airport under its own plan — which also means aircraft noise contours apply.
Protections nearby 250 m
- EPA-licensed facility · 3
- NIAH-recorded building · 1
- Record of Protected Structures · 1
Where this comes from
National planning feed (NPAD), fetched 24 Nov 2026, 23:00.
Source: National Planning Application Database · fetched 24 Nov 2026, 23:00
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 24 Nov 2026, 23:00 | open |
Summary
F23A/0023 is a planning application to Fingal County Council for the development will consist of: a 2-storey airside operations building of c.1,700sq.m, received on 27 Jul 2023; it was withdrawn on 3 Oct 2023.