Kildare Innovation Campus, Leixlip, Co. Kildare
Approved in Apr 2026.
- 11 Feb 2026Received
- 2 Apr 2026Conditional
- 10 Apr 2031Approval runs out
- Status
- Approved
- Decision
- Conditional · 2 Apr 2026
- Council
- Kildare County Council
- Type
- EXTENSION OF DURATION
- Site
- 9.56 ha
What’s proposed
Extension of Duration: 20/873: the construction of a logistics warehouse with ancillary office accommodation (total c. 25,268 sqm) to an overall height of 14.86 metres. The warehouse element of the development is principally single storey including an ancillary mezzanine level (554 sqm). The ancillary offices, comprising c. 1,737 sqm, are provided over three storeys and include toilets, change rooms, showers, cafeteria, gym, plant areas and circulation spaces. The proposed development will also include: the provision of a new vehicular access from Barnhall Road roundabout with ancillary associated entry/exit gates, access road and footpath; 179 no. surface car parking spaces including electric vehicle charging stations and 18 no. bicycle parking; solar pv panels on the warehouse roof; hard and soft landscaping; signage; sprinkler storage tanks and pump house; an electrical substation (c. 54 sqm); and all ancillary works including boundary treatments, street lighting, site excavation and development works above and below ground. The site is principally bounded by: Liffey Business Campus to the north; Barnhall Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west. At this site of c. 8.19 hectares at Liffey Business Campus (formerly known as the Hewlett Packard Campus)
Planning details
- Reference
- 2621
- Local authority
- Kildare County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 11 Feb 2026
- Observations close
- 18 Mar 2026 (closed 233 days ago)
- Decision due
- 7 Apr 2026 · decided 2 Apr 2026
- Decision
- Conditional on 2 Apr 2026
- Site area
- 9.56 ha from the mapped boundary, not the council's figure
Live near Kildare Innovation Campus?
Everything else planned on your street, in one report.
Check my streetNearby 1 · 500 m · 12 months
- WithdrawnWeston Primary Montessori School , MU Barnhall Rugby football Club Parsonstown , Leixlip.
- GrantedCo. Kildare , , Refer to Particulars attached
- WithdrawnWeston Primary Montessori School , Barnhall Rugby Football Club Parsonstown , Leixlip
- WithdrawnMU Barnhall Rugby Football Club , Parsonstown , Leixlip
- GrantedMU Barnhall Rugby Football Club , Parsonstown , Leixlip
- GrantedCois Abhann , Parsonstown , Celbridge
- GrantedMU Barnhall R.F.C , Parsonstown , Leixlip
- GrantedMU Barnhall Rugby Football Club , Parsonstown , Leixlip Co Kildare
- WithdrawnMU Barnhall Rugby Football club , Parsonstown Leixlip , LeixlipCounty Kildare
- WithdrawnCOIS ABHANN , PARSONSTOWN , CELBRIDGE
- WithdrawnMU Barnhall RFC , Parsonstown Leixlip , County Kildare
- CommencedKildare Innovation Campus (KIC) , Barnhall Meadows , Leixlip
- CommencedKildare Innovation Campus , Barnhall Road , Leixlip
Homes nearby
- For saleThe Orchard Grove, Dublin Road, Ballyoulster, Celbridge, Co. Kildare, W23 ERP1
- For saleThe Orchard Grove, Ballyoulster, Celbridge, Co. Kildare, W23 ERP1
- For sale13 Rinawade Lawns, Leixlip, Co. Kildare, W23 Y282
- For sale236 Beech Park, Easton Road, Leixlip, Co. Kildare, W23 FF68
- For sale31 The Woodlands, Castletown, Celbridge, Co. Kildare, W23 KT73
- For saleDonaghcumper Gate, Dublin Road, Celbridge, Co. Kildare
Protections nearby 250 m
Flood area nearby (OPW maps). floodinfo.ie ↗
- EPA-licensed facility · 1
- Recorded monument · 2
Where this comes from
National planning feed (NPAD), fetched 11 Sept 2026, 18:51.
Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 11 Sept 2026, 18:51 | open |
Summary
2621 is a planning application to Kildare County Council for extension of Duration: 20/873: the construction of a logistics warehouse with ancillary, received on 11 Feb 2026; permission was granted with conditions on 2 Apr 2026.