PlanningRegister.ie
South Dublin County Council · SD24B/0222W

33 Pinewood Park, Dublin 14

Approved in Aug 2024. Building started in 2024.

  1. 17 May 2024Received
  2. 2 Jul 2024Approved
  3. 12 Aug 2024Final approval
  4. 30 Aug 2024Building started

Planning details

Status
Building startedi
Decision
Approved · 2 Jul 2024
Reference
SD24B/0222W
Received
17 May 2024
Site
499 m²

What’s proposed

A) The removal of the existing converted garage and single storey entrance porch structure and the construction of a new single storey entrance porch located to the front and a two storey extension located to the side and front of the dwelling, B) The construction of a single storey extension to the rear of the dwelling incorporating 2 no. rooflights, C) Alteration to the size and location of existing rear and side…

Show all

facing windows and for additional window and door openings at ground floor level in the side elevation, D) Removal of the existing chimney structure at the side of the house and the removal of existing garden storage structures located in the rear garden, E) The installation of external wall insulation and associated finishes to the existing external walls, F) The widening of the existing gated vehicular entrance in the front property boundary, G) All associated site works above and below ground

29 other applications within 500 m in the last year · 1 open for comments

Open the report

Nearby 29 · 500 m · 12 months

Distance
Time
Show all 29

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Building started

  • 30 Aug 2024 · Builder told the council work was starting (opted out of the finish sign-off) CN0119064SD

Zoning

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

  • NIAH-recorded building · 1
    Catholic Church of the Holy Spirit
Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

SD24B/0222W is a planning application to South Dublin County Council for a) The removal of the existing converted garage and single storey entrance porch, received on 17 May 2024; permission was granted on 2 Jul 2024.