What’s proposed
a ten year planning permission for a renewable energy development with a 40-year operational life (from the date of commissioning of the renewable energy development). The entirety of the development constitutes the provision of a 9-turbine wind farm and all associated works on lands in both Counties Tipperary and Kilkenny. This development comprises part of an overall development for which planning permission is also sought for a 38kV substation in the townland of Killeen, Co. Kilkenny. A separate planning application will be made for an underground grid connection to Tipperary County Council and to Kilkenny County Council. The proposed development will constitute the provision of the following: • Construction of up to 9 turbines each with a maximum overall ground to blade tip height of up to 150 metres and associated foundations and hardstand areas; • Construction of new site entrances and upgrade of existing site entrances; • Internal wind farm underground power and communications cabling; • Upgrade of existing access tracks and provision of new site access roads; • Removal of existing Meteorological Masts and construction of 1 new Meteorological Mast for monitoring wind speeds with a maximum height of up to 85 metres; • Site drainage network • Construction of a new temporary site compound for use during construction; • Two Borrow Pits • Construction of a new on-site 38kV substation The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement
20913 is a planning application to Tipperary County Council for a ten year planning permission for a renewable energy development with a 40-year, received on 17 Aug 2020; the file is recorded as incompleted application.
Planning details
- Reference
- 20913
- Local authority
- Tipperary County Council
- Status
- Withdrawn or invalid · register status “INCOMPLETED APPLICATION”
- Received
- 17 Aug 2020
- Observations close
- 21 Sept 2020 (closed 2189 days ago)
- Decision due
- No due date published
- Decision
- Not decided
- Proposed development
- a ten year planning permission for a renewable energy development with a 40-year operational life (from the date of commissioning of the renewable energy development). The entirety of the development constitutes the provision of a 9-turbine wind farm and all associated works on lands in both Counties Tipperary and Kilkenny. This development comprises part of an overall development for which planning permission is also sought for a 38kV substation in the townland of Killeen, Co. Kilkenny. A separate planning application will be made for an underground grid connection to Tipperary County Council and to Kilkenny County Council. The proposed development will constitute the provision of the following: • Construction of up to 9 turbines each with a maximum overall ground to blade tip height of up to 150 metres and associated foundations and hardstand areas; • Construction of new site entrances and upgrade of existing site entrances; • Internal wind farm underground power and communications cabling; • Upgrade of existing access tracks and provision of new site access roads; • Removal of existing Meteorological Masts and construction of 1 new Meteorological Mast for monitoring wind speeds with a maximum height of up to 85 metres; • Site drainage network • Construction of a new temporary site compound for use during construction; • Two Borrow Pits • Construction of a new on-site 38kV substation The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact StatementAs published by the register.
- Site area
- 78 m² from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 8 applications within 500 m in the last 5 years
- Appeal decidedCoolnashinnagh , Ballingarry Thurles , Co. Tipperary
- GrantedFarranrory Upper Farranrory Lower Coolnashinnagh & Gortnasmuttaun , Ballingarry , Co. Tipperary
- Appeal decidedVarious townlands - Coolanshinnagh Ardragh Gortfree Bolakeale , Coolanshinnagh Ardragh Gortfree Bolakeale , Co Tipperary.
- WithdrawnVarious townlands - Coolanshinnagh Ardragh Gortfree Bolakeale , , Co Tipperary.
- GrantedFarranrory Upper , Ballingarry , Co Tipperary
- WithdrawnFarranrory Upper , BALLINGARRY , Co Tipperary
- GrantedCoolanshinnagh Ardragh Gortfree Bolakeale , Co. Tipperary
- WithdrawnCoolanshinnagh Ardragh Gortfree Bolakeale , Co. Tipperary
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 469784). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/20913/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |