PlanningRegister.ie
Tipperary County Council · 21407

Ballydine, Kilsheelan, Clonmel

Approved in Sept 2021. Building started in 2021.

  1. 30 Mar 2021Received
  2. 4 Aug 2021Conditional
  3. 5 Sept 2021Final approval
  4. 4 Oct 2021Building started

Planning details

Status
Building startedi
Decision
Conditional · 4 Aug 2021
Reference
21407
Received
30 Mar 2021
Further information
Requested 21 May 2021 · received 11 Jun 2021
Site
11.81 ha

What’s proposed

Construction of a proposed three-storey pilot plant manufacturing facility sized approximately 3,266 square metres and approximately 20.75 metres high and located and linked to the existing factory 03 manufacturing building and located south of the O.S.D. manufacturing facility, currently under construction (ref. 20/693).

Show all

The project development alos includes the following: a) An equipment yard housing plant, equipment and abatement system, vents and equipment housings including a covered waste tank, b) Roof mounted equipment and vents, c) Modifications to existing underground utilities including a surface water attenuation tank, underground storage tanks and miscellaneous works, d) The extension of the temporary contractors’ compound, currently under construction and additional local temporary contractor parking together with a second compound directly adjacent to the proposed facility, e) Revised landscaping and site-works, f) Modifications to the existing internal roads layouts, site lighting, pipe bridges, links, bunded tanks and supporting structures, and a truck staging area, g) Modifications to the existing car park layout to allow for the inclusion of additional accessible car parking spaces and electrical charge points, h) Alterations to the elevations of Factory 03 to accommodate the proposed development. This application consists of a development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act 2003) is required. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) accompany this planning application. This is a site to which the Chemicals Act (Control of Major Accident Hazards involving dangerous Substances) Regulations 2015 (S.I. 209 of 2015)…

Cut short by the council feed. Full text ↗

1 other application within 500 m in the last year · 1 open for comments

Open the report

Nearby 1 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Building started

  • 4 Oct 2021 · Builder told the council work was starting CN0082256TT

Protections nearby 250 m

  • Recorded monument · 4
    R133330; R133373
Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

21407 is a planning application to Tipperary County Council for construction of a proposed three-storey pilot plant manufacturing facility sized, received on 30 Mar 2021; permission was granted with conditions on 4 Aug 2021.