267 The Boulevard, Mount Eustace, Tyrrelstown, Dublin 15, D15 W4C8
Nearest: an extension application 103 m away is awaiting a decision. See the file →
23 applications within 500 m in 12 months (typical in Dublin: 18 a year)
What's planned, stalled or derelict around it, and what to ask.
Listed on daft.ie · Listed by Dixon Residential Estate Agents · last seen 25 Nov 2026
Planning around this home
| Description | Details | |||||||
|---|---|---|---|---|---|---|---|---|
| Granted | 5 Mar 2026 | FW26A/0083E FINGAL | 269 The Boulevard, Mount Eustace, Tyrrelstown, Dublin 15, D15 CX40 | Planning Permission to build a single storey rear extension with flat roof over.… | 28 Apr 2026 | — | 2 m | |
| Granted | 24 Oct 2025 | FW25A/0459E FINGAL | 261 Boulevard, Mount Eustace, Dublin 15, D15 AK3V | The development consists of: the construction of two single-storey sheds in the rear garde… | 11 Dec 2025 | — | 15 m | |
| Awaiting decision | 14 Oct 2026 | FW26A/0395E FINGAL | 1 Mount Eustace Park, Tyrrelstown, Dublin 15, D15 E9R3 | The development will consist of: Construction of a single-storey flat-roof front extensio… | — | — | 103 m | |
| Granted | 24 Feb 2026 | FW26A/0069E FINGAL | 14 Mount Eustace Rise, Tyrrelstown, Dublin 15, D15 P0K8 | Retention Permission for a detached rear garden shed formally intended to be used as habit… | 16 Apr 2026 | — | 72 m | |
| Granted | 21 Sept 2026 | FW26A/0359E FINGAL | 105 Boulevard Bealing Village, Tyrrellstown, Dublin 15 | (a) Retention Permission to retain the existing garden shed of 7 sq.m, and (b) Permission… | 12 Nov 2026 | — | 88 m | |
| Withdrawn | 10 Sept 2026 | FW26A/0347E FINGAL | 105 Boulevard, Bealing Village, Tyrrellstown, Dublin 15 | Application for (a) Retention Permission to retain the existing garden shed of 7 sq.m., an… | 14 Sept 2026 | — | 89 m | |
| Granted | 24 Jun 2026 | FW26A/0255E FINGAL | 1 Mount Eustace Walk, Tyrrelstown, Dublin 15, D15W0X3 | Retention for single storey extension to side and rear and shed to rear garden. SDZ.… | 17 Aug 2026 | — | 169 m | |
| Granted | 12 Dec 2025 | FW25A/0542E FINGAL | 18 Boulevard, Gazelle Village, Dublin 15, D15C3X9 | Retention of an existing single storey ground floor rear extension and planning permission… | 12 Feb 2026 | — | 187 m | |
| Refused | 12 Jun 2026 | FW26A/0240E FINGAL | 56 Park Boulevard, Tyrrelstown, Dublin 15, D15 R25R | Planning permission for the installation of 3 no. protective removable street bollards ben… | 30 Jul 2026 | — | 193 m | |
| Granted | 1 Oct 2025 | FW25A/0429E FINGAL | 8 Boulevard, Gazelle Village, Tyrrelstown, Dublin 15, D15 R6C3 | The development will consist of: Retention for single story extension to the rear. Add… | 31 Mar 2026 | — | 213 m | |
| Granted | 2 Sept 2026 | FW26A/0340E FINGAL | 27 Tyrrelstown Way, Tyrrelstown, Dublin 15, D15 X6R3 | Planning Permission: To (a) Build a single storey rear and side wrap around extension to t… | 27 Oct 2026 | — | 234 m | |
| Refused | 27 May 2026 | FW26A/0214E FINGAL | 2 Cruise Park Dr, Tyrrelstown, Dublin, D15 XV96 | The development will consist of: Retention of alterations to front elevation associated w… | 16 Jul 2026 | — | 249 m | |
| Withdrawn | 22 May 2026 | FW26A/0207E FINGAL | 2 Cruise Park Dr, Tyrrelstown, Dublin, D15 XV96 | Retention of alterations to front elevation associated with previously permitted garage co… | 26 May 2026 | — | 249 m | |
| Withdrawn | 31 Jan 2026 | FW26A/0040E FINGAL | 3 Bellgree Grove, Tyrrellstown, Dublin 15, D15 V089 | Planning Permission for the conversion of the existing attic space at no. 3 Bellgree Grove… | 5 Feb 2026 | — | 267 m | |
| Granted | 6 Feb 2026 | FW26A/0047E FINGAL | 3 Bellgree Grove, Tyrrellstown, Dublin 15, D15 V089 | Planning Permission for the conversion of the existing attic space consisting of the const… | 26 Mar 2026 | — | 268 m | |
| Appeal refused | 14 Mar 2026 | FW26A/0105E FINGAL | 33 The Boulevard, Bealing Village, Tyrrelstown, Dublin 15, D15 V9T8 | The development will consist of, Retention permission for a detached single-storey garden… | 5 May 2026 | — | 289 m | |
| Granted | 14 Aug 2026 | FW26A/0320E FINGAL | 7 Bellgree Lawn, Dublin 15, D15 P9E5 | Retention permission for single storey extension to rear. | 5 Oct 2026 | — | 298 m | |
| Withdrawn | 4 Aug 2026 | FW26A/0310E FINGAL | 7 Bellgree Lawn, Dublin 15, D15 P9E5 | Retention permission for single storey extension to rear in a Strategic Development Zone,… | 6 Aug 2026 | — | 298 m | |
| Appeal refused | 23 Dec 2025 | FW25A/0562E FINGAL | 6 Bellgree Court, Tyrrelstown, Dublin 15, D15 N2T6 | The development will consist of : Construction of a single-storey flat roof outbuilding to… | 16 Apr 2026 | — | 306 m | |
| Awaiting decision | 7 Oct 2026 | FW26A/0385E FINGAL | 6 Curragh Hall Crescent, Tyrrelstown, Dublin, D15 F5P2 | The development will consist of the construction of storey and a half dormer style side ex… | — | — | 401 m | |
| Refused | 23 Nov 2025 | FW25A/0498E FINGAL | 22 Mount Garrett Close, Tyrrelstown, Dublin 15, D15 AX6P | The development will consist of Ground floor extension (15.9m.sq.) to front of dwelling in… | 20 Jan 2026 | — | 359 m | |
| Granted | 20 Nov 2025 | FW25A/0492 FINGAL | Kilmartin Neighbourhood Centre, Hollywood Road, Hollywoodrath, Dublin | The development will consist of: i) the provision of 2 no. illuminated Tesco signs ( each… | 22 Jan 2026 | — | 378 m | |
| Granted | 3 Jul 2026 | FW26A/0269E FINGAL | 6 Curragh Hall Green, Dublin 15, Dublin, D15 V6K1 | Construction of a 20.6 sq/m, single-storey extension to the rear of existing dwelling.… | 24 Aug 2026 | — | 388 m | |
| Granted | 14 Jan 2026 | FW26A/0009E FINGAL | 27 Bellgree Rise, Tyrellstown, Dublin 15, D15 TWT3 | The development consists of the retention of existing single storey rear extension and fro… | 10 Mar 2026 | — | 395 m | |
| Refused | 1 Jul 2026 | FW26A/0265E FINGAL | 6 Curragh Hall Cresent, Tyrrelstown, Dublin, D15 F5P2 | The development will consist of the construction of 2 storey side extension with attic roo… | 20 Aug 2026 | — | 401 m | |
| Commenced | 29 Oct 2025 | FW25A/0464E FINGAL | 7 Ballentree Grove, Tyrrelstown, Dublin 15, D15 T6K8 | The development will consist of the following: 1. Retention Permission to retain the par… | 15 Dec 2025 | — | 425 m | |
| Commenced | 7 Apr 2026 | FW26A/0142E FINGAL | 26 Curragh Hall Green, Dublin 15, D15 W0X9 | Planning Permission for construction of a 15 sq.m, single-storey extension to the rear of… | 26 May 2026 | — | 461 m | |
| Granted | 19 Feb 2026 | FW26A/0060E FINGAL | Unit 1 Block E, Tyrrelstown Centre, Hollywood Rd. Mulhuddart, D15 DH30 | The development will consist of the addition of the proposed external seating arrangement… | 14 Apr 2026 | — | 472 m |
Full planning report
The full planning report for 267 The Boulevard
Everything planned, built and refused around it, in one report you keep. Read it before you buy, build or object.
- 128 applications
- 89 granted




4 of about 30 pages, from a sample report in Blackrock.
Your report includes:
- Every application within 500 m: granted, refused and appealed, on a map
- What neighbours were allowed to build, and what was refused
- Deadlines to object, and sites nearby that could change
- New homes and developments coming, and building work started
- Zoning, conservation areas, protected structures and flood risk
- Questions to ask your solicitor or surveyor
VAT included · Secure checkout by Stripe · Opens straight after payment · PDF emailed to you
Not a statutory planning search.
About this home
Within 500 m of 267 The Boulevard, Mount Eustace, Tyrrelstown, Dublin 15, D15 W4C8, Planning Register tracks 128 planning applications: 2 awaiting a decision, 89 granted, 19 refused, 31 building started. The home is a 4-bedroom terraced house in Tyrrelstown, Fingal of about 118 m² (BER C). It is advertised for sale on daft.ie (last seen live on 25 Nov 2026).
More about this address
It is in the Tyrrelstown estate, where 111 planning applications were made in 10 years, 80% of those decided granted. The nearest EPA-licensed facility is Swords Laboratories, 491 m away. The nearest named scheme is Tyrellstown Plaza Local Centre, 46 homes (46 under construction), 312 m away.
- Type
- Terrace
- Bedrooms / bathrooms
- 4 / 4
- Floor area
- 118 m²
- BER
- C
- Eircode
- D15 W4C8
- Local authority
- Fingal County Council
- Estate
- Tyrrelstown
- EPA licence within 1.0 km
- Swords Laboratories (491 m) +2 more
- Named schemes within 1.0 km
- Tyrellstown Plaza Local Centre · 46 homes +5 more
- Most active applicant within 500 m
- Lidl Ireland GmbH · 4 applications
- Schools within 1.0 km
- Gaelscoil an Chuilinn (Gaelscoil · 282 pupils, 574 m) +3 more
- Crèche inspected nearby
- Bothan na NÓg · inspected 2 Oct 2024 (176 m)