Planning report · Offaly County Council · 2000 m around the house · the last 12 months · 14 Oct 2026, 08:49

R440

53.09352, -7.88519

Homes here mostly date from the 2000s. 58 homes approved 1.2 km away haven't started.

See on the mapWatch this area
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Clonoghil UpperBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2017: 2 files on Clonoghil Upper2020: 1 file on Clonoghil Upper2021: 1 file on Clonoghil Upper2022: 2 files on Clonoghil Upper2025: 1 file on Clonoghil Upper7 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings276Cumberland House; house
Monuments30Historic town; Church
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 43 on the draft 2027 map; 40 on the final 2026 map.
Sources: zoning, rzlt, constraints, constraints.niah, constraints.smr · fetched 11 Oct 2026, 23:18
SourceLicenceFetchedLink
zoningCC-BY-4.011 Oct 2026, 23:18open
rzltCC-BY-4.012 Oct 2026, 00:14open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 14 Oct 2026, 00:33
SourceLicenceFetchedLink
bcmsCC-BY-4.014 Oct 2026, 00:33open
npadCC-BY-4.014 Oct 2026, 02:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 100% approved, and 88% are asked for more information.

New house in a garden or site16 decided · more info asked 88%
100% · council 87%
Approved nearbyOffaly overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 16 nearby, 1,402 council-wide

Figure 3

Clonoghil Upper, file by file since 2017

New houses in side gardens or on sites: 3 of 3.

7 planning files on Clonoghil Upper since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsPorches, roofs, otherNo number · 2017 · other work · approved · 17173No number · 2017 · other work · approved · 17183No number · 2020 · other work · approved · 20183No. 6 · 2022 · other work · approved · 22386New house in a side gardenNo number · 2021 · new house · approved · 21492No number · 2022 · new house · approved · 22466No number · 2025 · new house · approved · 2560381
ApprovedRefusedWithdrawn or invalid

7 files with "Clonoghil Upper" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 14 Oct 2026, 02:03
    SourceLicenceFetchedLink
    npadCC-BY-4.014 Oct 2026, 02:03open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.014 Oct 2026, 00:33open
    npadCC-BY-4.014 Oct 2026, 02:03open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days.

    Comments open: 5 weeks · €20; Council decision: 55 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=22)55 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off80% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated27 decided home extensions, 5 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    0 of 1 appealed refusals became permissions. 0 of 2 appealed approvals were reversed.

    Refusals appealed1 decided
    0 became permissions
    Approvals appealed2 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months
    • 501797 Pending · BRIDGE STREET AND MOORPARK STREET , BIRR , CO.OFFALY · 1.8 km
    • 501779 Invalid · BRIDGE STREET AND MOORPARK STREET , BIRR , CO.OFFALY · 1.8 km
    • 323980 Pending · in the counties of Clare, Limerick, Tipperary, Offaly, Kildare, and… · 178 m
    Sources: acp, courts, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    courtsall-rights-reserved14 Oct 2026, 01:31open
    npadCC-BY-4.014 Oct 2026, 02:03open
    Question 4

    What's changing around you?

    Street map around R440 with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not startedAppealEmpty land zoned for homesApprovedNo decision yet
    1. 1CLONOGHILL LOWER, BIRR 2686No decision yet · 434 m
    2. 2Scurragh, Townparks 2660405Approved with conditions · 1.2 km
    3. 3Townparks & Seffin 2460120Approved, no sign building has started · 1.2 km
    4. 4Railway Road Townparks & Seffin 2460122Approved, no sign building has started · 1.2 km
    5. 5Nos. 15-20 Woodlands Park fronting Burke’s Hill 2560186Approved, no sign building has started · 1.6 km
    6. 6in the counties of Clare, Limerick 323980Appeal: no decision yet · 178 m
    7. 71.3 ha zoned for homesEmpty land zoned for homes · 948 m
    8. 81.3 ha zoned for homesEmpty land zoned for homes · 960 m
    9. 90.6 ha zoned for homesEmpty land zoned for homes · 1.0 km
    10. 101.7 ha zoned for homesEmpty land zoned for homes · 1.0 km
    11. 110.9 ha zoned for homesEmpty land zoned for homes · 1.2 km
    12. 120.8 ha zoned for homesEmpty land zoned for homes · 1.2 km
    13. 13BIRR ENTERPRISE CENTRE SYNGEFIELD, BIRR 2616Approved with conditions · 268 m
    14. 14Elmpark, Syngefield Road 2660363Approved with conditions · 803 m
    15. 15ELM GROVE CLONOGHILL UPPER, BIRR 2660No decision yet · 908 m
    Figure 6

    The next 30 days

    2 deadlines within 2.0 km; the first closes 22 Oct 2026.

    2 deadlines in the next 30 days: 2026-10-22 2660405: CONDITIONAL — development comprising works to the existing 2 No. rugby pitches which includes: 1/Installation of 2 No. prefabricated c; 2026-11-02 2686: application received — NEW DWELLING HOUSE, DOMESTIC GARAGE/ FUEL SHED, INSTALL SEPTIC TANK WITH PERCOLATION AREA AND ALL ANCIALLRY SITE WORKStoday19 Oct24 Oct29 Oct3 Nov8 Nov13 Nov2660405: CONDITIONAL — development comprising works to the existing 2 No. rugby pitches which includes: 1/Installation of 2 No. prefabricated c · 1.2 km away · 2026-10-222686: application received — NEW DWELLING HOUSE, DOMESTIC GARAGE/ FUEL SHED, INSTALL SEPTIC TANK WITH PERCOLATION AREA AND ALL ANCIALLRY SITE WORKS · 434 m away · 2026-11-02
    Comments closeTime to appeal ends
    • Time to appeal ends 22 Oct 20268 days left
      22660405 · CONDITIONAL — development comprising works to the existing 2 No. rugby pitches which includes: 1/Installation of 2 No.…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.2 km away
    • Comments close 2 Nov 202619 days left
      12686 · application received — NEW DWELLING HOUSE, DOMESTIC GARAGE/ FUEL SHED, INSTALL SEPTIC TANK WITH PERCOLATION AREA AND…
      €20 to the council · 434 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    58 homes 1.2 km away were approved May 2025 with no start notice yet; the permission runs to May 2030.

    Townparks & Seffin · 58 homes: 58 homes approved May 2025, not started; Nos. 15-20 Woodlands Park… · 39 homes: 39 homes approved Feb 2026, not started; Railway Road Townparks &… · 20 homes: 20 homes approved Apr 2025, not started202420252026202720282029203020312032Townparks & Seffin · 58 homes1.2 km · 246012058 homes approved May 2025, not started58 homes approved May 2025, not startedNos. 15-20 Woodlands Park… · 39 homes1.6 km · 256018639 homes approved Feb 2026, not started39 homes approved Feb 2026, not startedRailway Road Townparks &… · 20 homes1.2 km · 246012220 homes approved Apr 2025, not started20 homes approved Apr 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 13 within 2.0 km

    Approved, not started 3

    Empty land zoned for homes 10

    • 71.3 ha zoned for homes · no homes built on it yet · 948 m
    • 81.3 ha zoned for homes · no homes built on it yet · 960 m
    • 90.6 ha zoned for homes · no homes built on it yet · 1.0 km
    • 101.7 ha zoned for homes · no homes built on it yet · 1.0 km
    • 110.9 ha zoned for homes · no homes built on it yet · 1.2 km
    • 120.8 ha zoned for homes · no homes built on it yet · 1.2 km
    • 0.3 ha zoned for homes · no homes built on it yet · 1.2 km
    • 2.2 ha zoned for homes · no homes built on it yet · 1.3 km
    • 3.2 ha zoned for homes · no homes built on it yet · 1.5 km
    • 1.3 ha zoned for homes · no homes built on it yet · 1.5 km

    Not covered here: council land to be sold, empty land zoned for homes (Dublin only).

    Sources: acp, bcms, derelict, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.014 Oct 2026, 00:33open
    derelictCC-BY-4.012 Oct 2026, 23:08open
    npadCC-BY-4.014 Oct 2026, 02:03open
    Figure 8

    Applications within 500 m, by year

    Between 1 and 3 a year; busiest 2022. 100% of decisions were approvals.

    2017: 1, 2021: 1, 2022: 3, 2025: 1, 2026: 105102017: 1 approved1’17*2021: 1 approved1’212022: 3 approved3’222025: 1 approved1’252026: 1 approved1’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 1CLONOGHILL LOWER , BIRR , CO.OFFALY comments close 2 Nov 2026
      NEW DWELLING HOUSE, DOMESTIC GARAGE/ FUEL SHED, INSTALL SEPTIC TANK WITH PERCOLATION AREA AND ALL ANCIALLRY…
      268628 Sept 2026434 m
    Every application within 2.0 km 38 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: npad, acp, bcms · fetched 14 Oct 2026, 02:03
    SourceLicenceFetchedLink
    npadCC-BY-4.014 Oct 2026, 02:03open
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.014 Oct 2026, 00:33open
    Building work nearby 11 in the last 12 months
    5 not signed off6 no sign-off needed
    • 12 Castle Street, Birr, Offaly, R42 H426 · 18 Sept 2026 · 2 homes · 7-day notice not signed off · 1.9 km
    • Hillside, Hillside Downs, Offaly, R42F820 · 13 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 2641 · 1.4 km
    • Railway Road, Birr, Offaly, R42 FC98 · 3 Aug 2026 · start notice not signed off · 1.4 km
    • 1 N52, Birr, Offaly, R42KC56 · 8 May 2026 · 7-day notice not signed off · 25/60655 · 1.7 km
    • 54 Corr Na Meala, birr, Offaly · 5 May 2026 · 220 homes · start notice not signed off · 24/60120 · 1.0 km
    • Clonoghill Upper, Birr, Offaly · 9 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60381 · 244 m
    • 3 A Newbridge Street, Birr, Offaly, R42 P527 · 13 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · 2560046 · 1.4 km
    • Walcot, Rosse Row, Birr, Offaly, R42 D459 · 5 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · 24/161 · 1.9 km
    • Walcot, Rosse Row, Birr, Offaly · 5 Jan 2026 · short notice no sign-off needed · 24/161 · 1.9 km
    • BOHERDEEL ROAD,, CRINKLE, BIRR,, Offaly · 14 Nov 2025 · 7-day notice not signed off · 25/60003 · 1.9 km
    • 1 Glebe Street, Birr, Offaly · 30 Oct 2025 · 1 homes · start notice, opted out no sign-off needed · 23/60109 · 1.7 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: bcms · fetched 14 Oct 2026, 00:33
    SourceLicenceFetchedLink
    bcmsCC-BY-4.014 Oct 2026, 00:33open
    Homes coming 117 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: acp, bcms, npad, social_housing · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.014 Oct 2026, 00:33open
    npadCC-BY-4.014 Oct 2026, 02:03open
    social_housingCC-BY-SA-4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Little Haven Education Centre · Crèche11 Apr 2025 · report · Tusla Early Years Inspectorateapprox. 228 m
    Naíonra Nóiníní Beaga · Crèche4 Dec 2024 · report · Tusla Early Years Inspectorate680 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: schools, tusla_ey · fetched 27 Sept 2026, 23:32
    SourceLicenceFetchedLink
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
    How busy is this area About as busy as most of Offaly County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here2
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.014 Oct 2026, 00:33open
    npadCC-BY-4.014 Oct 2026, 02:03open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    19% of homes built before 1971 (council 30%). 38% owner-occupied (council 72%).

    Homes built before 1971
    19% · council 30%
    Homes built since 2001
    57% · council 34%
    Owner-occupied
    38% · council 72%
    Rented
    62% · council 22%
    Children under 15
    20% · council 21%
    Aged 65 and over
    18% · council 16%
    Households with 2+ cars
    28% · council 47%
    Work mainly from home
    6% · council 8%
    This small area (370 people)Offaly

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 187013007

    Nearest school
    1.6 km
    Mercy Primary School, 141 pupils
    Schools, stops and the council

    Schools

    • Mercy Primary School · primary · 141 pupils · 1.6 km
    • Croinchoill NS · primary · 243 pupils · 1.7 km
    • St Brendans Monastery · primary · 178 pupils · 1.9 km

    Stops 8

      Sources: gtfs, schools, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
      SourceLicenceFetchedLink
      gtfsCC-BY-4.011 Oct 2026, 23:43open
      schoolsCC-BY-4.027 Sept 2026, 23:32open
      consultpublic14 Oct 2026, 01:30open
      moderngovpublic14 Oct 2026, 01:30open
      lda_landsCC-BY-4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Application 434 m away open for comments until 2 Nov 2026: comment?
        Ask for: The plans on the council's website (€20 to comment).
        Council
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Clonoghil Upper
      Electoral division
      Birr Urban
      Electoral area
      Birr
      Council
      Offaly County Council
      Everything we found, as a list 8 lines
      • Not protected; no vacant land tax.
      • 13 sites nearby could change: 3 approved schemes, 10 empty zoned plots.
      • 1 application open for comments nearby; nearest closes 2 Nov 2026.
      • 117 homes approved nearby, not started; largest 58 at Townparks & Seffin.
      • No scheduled public transport within 800 m.
      • Here (2022 census): 62% rent (council 22%); 7% of homes empty (council 8%); most built 2001–2010; 72% drive to work (council 65%); population up 7% since 2016.
      • The council decides in a median 80 days (about 11 weeks); 51% are asked for more information.
      • 38 applications nearby in the last 12 months; 87% approved (council 91%); 29% for work already built (council 21%).
      What the terms mean 7 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 26
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.013 Oct 2026
      data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
      dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public14 Oct 2026
      www2.courts.ie—all-rights-reserved14 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.012 Oct 2026
      transportforireland.ieNational Transport AuthorityCC-BY-4.011 Oct 2026
      lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)public14 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.014 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…14 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.011 Oct 2026
      gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
      gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.011 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 14 Oct 2026, 08:49 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.