PlanningRegister.ie
Planning report · Kildare County Council · 2000 m around the house · the last 12 months · 19 Oct 2026, 14:59

17 Farrenberg Glebe

53.16073, -6.90793

Homes here mostly date from the 1950s. Home extensions nearby almost always get approved (99%). A building site 450 m away stopped before it was finished.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of KildareBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2017: 9 files on Kildare2018: 18 files on Kildare2019: 18 files on Kildare2020: 15 files on Kildare2021: 16 files on Kildare2022: 15 files on Kildare2023: 21 files on Kildare2024: 21 files on Kildare2025: 21 files on Kildare2026: 7 files on Kildare161 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  • 27 Feb 2018 · notice that building work was starting · signed off as finished apr 2022
  • 13 Feb 2018 · notice that building work was starting · no official sign-off needed for this kind of work
  • 12 Feb 2018 · notice that building work was starting · owner opted out of official sign-off: no completion certificate expected
  • 26 Jan 2018 · notice that building work was starting · owner opted out of official sign-off: no completion certificate expected
  • 20 Dec 2017 · notice that building work was starting · owner opted out of official sign-off: no completion certificate expected
  • 6 Nov 2017 · notice that building work was starting · signed off as finished dec 2017
  • 1 Nov 2017 · notice that building work was starting · owner opted out of official sign-off: no completion certificate expected
  • 31 Oct 2017 · notice that building work was starting · no official sign-off needed for this kind of work
  • 30 Oct 2017 · notice that building work was starting · signed off as finished may 2018
  • 26 Oct 2017 · notice that building work was starting · signed off as finished mar 2018
On this site
G4
Zoning · Open space
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningG4 · Open space
What it says

Open Space and Amenity: To protect and provide for open space, amenity and recreation provision.

Open space and recreational amenity, to be preserved as such.

kildare town local area plan 2023 2029 · 6 Dec 2023 – 19 Dec 2029

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings100monument; 1798 Monument
Radon grid squares1
Monuments121Mound; Burial
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 233 on the draft 2027 map; 234 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 94–100% by type. A new house in a garden is harder: 88% approved, and 1 in 2 are asked for more information.

Single-storey rear38 decided · more info asked 32%
100% · council 98%
Two-storey rear18 decided · more info asked 33%
94% · council 94%
Attic or dormer31 decided · more info asked 32%
100% · council 87%
New house in a garden or site26 decided · more info asked 62%
88% · council 57%
Approved nearbyKildare overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 113 nearby, 4,496 council-wide

Figure 3

Kildare, file by file since 2017

46 of 47 decided extensions on the road were approved. New houses in side gardens or on sites: 5 of 6.

161 planning files on Kildare since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo number · 2017 · single-storey side · approved · 171049No number · 2017 · single-storey rear · approved · 171489No number · 2017 · single-storey rear · approved · 17430No. 24 · 2017 · two-storey side · approved · 17483No number · 2018 · first-floor · approved · 181538No. 72 · 2018 · single-storey rear · approved · 18243No. 1279 · 2018 · two-storey rear · refused · 18405No. 1281A · 2018 · attic conversion / dormer · approved · 1880No. 1279 · 2018 · rear · approved · 18992No. 2 · 2019 · two-storey rear · approved · 191012No. 29 · 2019 · rear · approved · 191316No. 1255 · 2019 · single-storey rear · approved · 191317No number · 2020 · other extension · approved · 201448No. 1453 · 2020 · two-storey rear · approved · 201510No. 40 · 2020 · two-storey side · approved · 201591No number · 2020 · other extension · approved · 20320No. 1279 · 2020 · attic conversion / dormer · approved · 20540No. 513 · 2020 · single-storey rear · approved · 20555No number · 2020 · single-storey rear · approved · 20740No. 1 · 2021 · two-storey side · approved · 21211No number · 2021 · single-storey rear · approved · 21717No number · 2021 · first-floor · approved · 21966No number · 2022 · two-storey rear · approved · 221215No. 3 · 2022 · single-storey rear · approved · 22292No. 55 · 2022 · two-storey side · approved · 22763No number · 2022 · single-storey side · approved · 22766No. 6 · 2023 · attic conversion / dormer · approved · 23271No. 8 · 2023 · single-storey rear · approved · 23307No number · 2023 · first-floor · approved · 23340No. 4 · 2023 · two-storey rear · approved · 23367No. 1249 · 2023 · rear · approved · 2360187No number · 2023 · first-floor · approved · 2360233No. 2972 · 2024 · single-storey rear · approved · 24347No. 26 · 2024 · single-storey rear · approved · 2460190No. 2959 · 2024 · single-storey rear · approved · 2460261No number · 2024 · single-storey side · approved · 2460349No. 1494 · 2024 · two-storey rear · approved · 2460431No. 646 · 2024 · single-storey rear · approved · 2460583No. 512 · 2024 · single-storey side · approved · 2481No number · 2025 · single-storey rear · approved · 25135No. 651 · 2025 · rear · approved · 2560068No. 1236 · 2025 · single-storey rear · approved · 2560258No. 26 · 2025 · single-storey rear · approved · 2560724No. 2 · 2025 · garage conversion · approved · 2561301No number · 2025 · single-storey rear · approved · 2561319No. 5 · 2026 · single-storey rear · approved · 2660625No. 11 · 2026 · single-storey side · approved · 2660762Porches, roofs, otherNo number · 2017 · other work · approved · 171018No number · 2017 · other work · refused · 171271No number · 2017 · other work · approved · 171373No number · 2017 · other work · approved · 17764No number · 2017 · other work · approved · 17937No number · 2018 · other work · approved · 181026No number · 2018 · other work · approved · 181027No number · 2018 · other work · approved · 181028No number · 2018 · other work · approved · 181119No. 26 · 2018 · other work · approved · 181187No number · 2018 · other work · approved · 181577No number · 2018 · other work · approved · 18273No number · 2018 · other work · refused · 18301371No number · 2018 · other work · approved · 18340No number · 2018 · other work · approved · 18635No number · 2018 · other work · approved · 1868No number · 2018 · other work · refused · 18771No. 15 · 2018 · other work · approved · 18991No. 12 · 2019 · other work · approved · 191096No number · 2019 · other work · approved · 191151No. 654 · 2019 · other work · refused · 191209No number · 2019 · other work · approved · 191427No number · 2019 · other work · approved · 19209No. 513 · 2019 · other work · approved · 19245No number · 2019 · other work · approved · 19305007No number · 2019 · other work · approved · 19388No. 1223 · 2019 · other work · approved · 19590No number · 2019 · other work · approved · 19608No number · 2019 · other work · approved · 19641No. 6 · 2019 · other work · approved · 19785No number · 2019 · other work · refused · 19897No number · 2019 · other work · approved · 19946No number · 2020 · other work · refused · 201083No. 1257 · 2020 · other work · approved · 201255No number · 2020 · other work · approved · 201431No number · 2020 · other work · approved · 20234No. 1213 · 2020 · other work · refused · 20238No. 2 · 2020 · other work · approved · 20291No. 654 · 2020 · other work · refused · 20483No number · 2021 · other work · approved · 211033No number · 2021 · other work · approved · 211182No number · 2021 · other work · approved · 211587No. 1 · 2021 · other work · refused · 211830No number · 2021 · other work · approved · 21206No number · 2021 · other work · approved · 21363No number · 2021 · other work · refused · 21409No. 1213 · 2021 · other work · refused · 21441No number · 2021 · other work · approved · 21577No number · 2021 · other work · approved · 21679No number · 2021 · other work · approved · 21718No number · 2021 · other work · approved · 21753No number · 2021 · other work · approved · 21981No. 3413 · 2022 · other work · approved · 221009No number · 2022 · other work · approved · 221195No. 10 · 2022 · other work · approved · 221216No number · 2022 · other work · approved · 22123No number · 2022 · other work · approved · 221322No. 1262 · 2022 · other work · approved · 22232No number · 2022 · other work · refused · 22571No. 1479 · 2022 · other work · approved · 22760No number · 2022 · other work · approved · 22806No. 62 · 2022 · other work · approved · 22970No number · 2023 · other work · refused · 23129No number · 2023 · other work · approved · 23191No number · 2023 · other work · refused · 23303No number · 2023 · other work · refused · 23416No number · 2023 · other work · refused · 23550No. 1506 · 2023 · other work · approved · 2360023No number · 2023 · other work · approved · 2360195No number · 2023 · other work · approved · 2360321No number · 2023 · other work · refused · 2360326No number · 2023 · other work · approved · 2360506No number · 2023 · other work · approved · 2360507No number · 2023 · other work · refused · 23710No. 2512 · 2023 · other work · approved · 23780No number · 2024 · other work · approved · 2460069No. 654 · 2024 · other work · refused · 2460123No number · 2024 · other work · refused · 2460145No number · 2024 · other work · approved · 2460214No number · 2024 · other work · refused · 2460281No number · 2024 · other work · refused · 2460488No number · 2024 · other work · approved · 2460604No number · 2024 · other work · approved · 2460610No. 1272 · 2024 · other work · approved · 2460813No number · 2024 · other work · approved · 2461023No number · 2024 · other work · refused · 2461120No number · 2024 · other work · approved · 2461162No number · 2024 · other work · approved · 2461266No. 22 · 2024 · other work · approved · 2461401No. 1262 · 2025 · other work · refused · 2560278No number · 2025 · other work · approved · 2560453No number · 2025 · other work · approved · 2560535No number · 2025 · other work · approved · 2560679No number · 2025 · other work · approved · 2560740No. 26 · 2025 · other work · refused · 2560782No number · 2025 · other work · approved · 2560934No number · 2025 · other work · approved · 2561055No number · 2025 · other work · approved · 2561095No number · 2025 · other work · approved · 2561150No number · 2025 · other work · refused · 2561198No number · 2025 · other work · refused · 2561357No number · 2025 · other work · approved · 2561370No number · 2025 · other extension · approved · 2561466No number · 2026 · other work · refused · 2660224No. 26 · 2026 · other work · approved · 2660287No number · 2026 · other work · refused · 2660380No number · 2026 · other work · approved · 2660409No. 1262 · 2026 · other work · approved · 2660892New house in a side gardenNo. 23 · 2019 · new house · approved · 1995423No. 2 · 2020 · new house · approved · 202782No number · 2022 · new house · approved · 221304No. 1248 · 2023 · new house · approved · 23601211248No. 4 · 2023 · new house · approved · 23943No number · 2025 · new house · refused · 2560313
ApprovedRefusedWithdrawn or invalid

161 files with "Kildare" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

1 approved1 refused
KindAppliedApprovedRefused
Other101
Single-storey rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 53 days. 1 in 3 is asked for more information, which adds about 76 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 3): 131 days; Appeal window: 4 weeks; Building starts: 166 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 50–55 (n=91)53 daysIf more info asked (1 in 3)With further information: median 131 days (n=37)131 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 166 days after permission (n=40)166 days after permissionSigned off396 days after the start, for the few who file. 60% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated128 decided home extensions, 42 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    5 of 15 appealed refusals became permissions. 0 of 16 appealed approvals were reversed.

    Refusals appealed15 decided
    5 became permissions
    Approvals appealed16 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 7 in the last 12 months
    • 501391 Refused · Dublin Road, Kildare Town, Co. Kildare · 448 m
    • 501069 Granted with conditions · Firecastle Lane, Kildare Town, Co. Kildare · 422 m
    • 501621 Open · Shraud Street Fairview Cottages , Kildare , Co. Kildare · 197 m
    • 501546 Open · Shraud Street Fairview Cottages , Kildare , Co. Kildare · 197 m
    • 500452 Invalid · Dublin Road , Kildare Town , Co Kildare · 448 m
    • 500289 Pending · Tully Road, Kildare, County Kildare. · 808 m
    • 500167 Pending · The former Guilfoyle's Garden Centre site , Grey Abbey Road , Kildare… · 1.7 km
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher19 Oct 2026, 01:37open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Question 4

    What's changing around you?

    Street map around 17 Farrenberg Glebe with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not startedLarge schemeRefusedEmpty land zoned for homes
    1. 1Southgreen Road, Kildare Town 2661047No decision yet · 678 m
    2. 21262 Campion Crescent, Kildare Town 2660892Approved with conditions · 350 m
    3. 311 Curragh Drive, Kildare 2660762Approved with conditions · 460 m
    4. 4Whitelands East, Kildare Town 2660501Approved with conditions · 747 m
    5. 5Whitelands East 2461023Approved, no sign building has started · 516 m
    6. 6Oak Church 2560535Approved, no sign building has started · 633 m
    7. 7Oak Church 2560740Approved, no sign building has started · 663 m
    8. 8Whitelands East 2461323Approved, no sign building has started · 684 m
    9. 9Southgreen Road Kildare Co. Kildare 2660248Approved, no sign building has started · 1.0 km
    10. 10Lands at, Magee Quarter 2660621Refused · 729 m
    11. 11Lands at Crockanure Glebe, Between Dunmurray Road and Old Road 2660468No decision yet · 767 m
    12. 12Shraud Street Fairview Cottages, Kildare 2660380Refused · 197 m
    13. 131.9 ha zoned for homesEmpty land zoned for homes · 11 m
    14. 140.3 ha zoned for homesEmpty land zoned for homes · 38 m
    15. 153.3 ha zoned for homesEmpty land zoned for homes · 50 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 105 permissions since 2016, 27 show a start notice and 6 have a completion certificate.

    135 applications lodged within 500 m. Council: 104 approved, 31 refused. After appeals: 105 approved. Of those: 6 signed off, 8 built with the owner's opt-out, 13 started, 42 with no start notice found, 36 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT104: lodged → approved31: lodged → refused101: approved → approved26: refused → refused3 approved by the council, withdrawn or invalid after an appeal4 refused by the council, approved after an appeal1 refused by the council, withdrawn or invalid after an appeal42: approved → no start notice found8: approved → built, owner opted out13: approved → started, not signed off6: approved → signed off36: approved → ran out135 lodged135 lodged104 approved104 approved31 refused31 refused105 approved105 approved26 refused26 refused4 withdrawn4 withdrawn42 no start notice found42 no start notice found8 built, owner opted out8 built, owner opted out13 started, not signed off13 started, not signed off6 signed off6 signed off36 ran out36 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured135 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    5 deadlines within 2.0 km; the first closes 19 Oct 2026.

    4 deadlines in the next 30 days: 2026-10-19 2660501: CONDITIONAL — 1. Amendments to the previously granted boundaries to 12-20. 2. The change of the previously approved Q1 type house, 3-; 2026-10-27 2660892: CONDITIONAL — the use of an existing detached structure as a standalone one-bedroom dwelling together with permission for associated s; 2026-10-27 2661047: application received — for constructing 38 no. dwellings. The dwellings will consist of 9 no. ground floor apartments and 9 no. duplex apartmen; 2026-10-29 2660762: CONDITIONAL — construction of single storey extension to side of existing dwelling and minor alterations to existing floor layout and today24 Oct29 Oct3 Nov8 Nov13 Nov18 Nov2660501: CONDITIONAL — 1. Amendments to the previously granted boundaries to 12-20. 2. The change of the previously approved Q1 type house, 3- · 747 m away · 2026-10-192660892: CONDITIONAL — the use of an existing detached structure as a standalone one-bedroom dwelling together with permission for associated s · 350 m away · 2026-10-272661047: application received — for constructing 38 no. dwellings. The dwellings will consist of 9 no. ground floor apartments and 9 no. duplex apartmen · 678 m away · 2026-10-272660762: CONDITIONAL — construction of single storey extension to side of existing dwelling and minor alterations to existing floor layout and · 460 m away · 2026-10-29
    Comments closeTime to appeal endsHigh Court window ends
    • Time to appeal ends 19 Oct 2026closes today
      42660501 · CONDITIONAL — 1. Amendments to the previously granted boundaries to 12-20. 2. The change of the previously approved Q1…
      €220 to An Coimisiún Pleanála (€110 observer) · 747 m away
    • Time to appeal ends 27 Oct 20268 days left
      22660892 · CONDITIONAL — the use of an existing detached structure as a standalone one-bedroom dwelling together with permission…
      €220 to An Coimisiún Pleanála (€110 observer) · 350 m away
    • Comments close 27 Oct 20268 days left
      12661047 · application received — for constructing 38 no. dwellings. The dwellings will consist of 9 no. ground floor apartments…
      €20 to the council · 678 m away
    • Time to appeal ends 29 Oct 202610 days left
      32660762 · CONDITIONAL — construction of single storey extension to side of existing dwelling and minor alterations to existing…
      €220 to An Coimisiún Pleanála (€110 observer) · 460 m away
    • Time to ask the High Court for a review ends 19 Nov 202631 days left
      Refuse permission
      448 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    136 homes 1.0 km away were approved Aug 2026 with no start notice yet; the permission runs to Aug 2031. 2 building sites nearby stopped before sign-off.

    1 Dunmurry Court, Kildare · 209 homes: 209 homes, started Apr 2022, never signed off; Southgreen Road Kildare… · 136 homes: 136 homes approved Aug 2026, not started; Oak Church · 88 homes: 88 homes approved Aug 2025, not started; Whitelands East · 44 homes: 44 homes approved Mar 2025, not started202220232024202520262027202820292030203120321 Dunmurry Court, Kildare · 209 homes450 m · 181026209 homes, started Apr 2022, never signed off209 homes, started Apr 2022, never signed offSouthgreen Road Kildare… · 136 homes1.0 km · 2660248136 homes approved Aug 2026, not started136 homes approved Aug 2026, not startedOak Church · 88 homes633 m · 256053588 homes approved Aug 2025, not started88 homes approved Aug 2025, not startedWhitelands East · 44 homes683 m · 246132344 homes approved Mar 2025, not started44 homes approved Mar 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 17 within 2.0 km

    Building site that stopped 2

    • 1 Dunmurry Court, Kildare · 209 homes, started Apr 2022, never signed off · 450 m
    • Rathbride Road, Kildare · 14 homes, started May 2018, never signed off · 776 m

    Approved, not started 5

    Empty land zoned for homes 10

    • 131.9 ha zoned for homes · no homes built on it yet · 11 m
    • 140.3 ha zoned for homes · no homes built on it yet · 38 m
    • 153.3 ha zoned for homes · no homes built on it yet · 50 m
    • 9.3 ha zoned for homes · no homes built on it yet · 109 m
    • 1.1 ha zoned for homes · no homes built on it yet · 151 m
    • 0.2 ha zoned for homes · no homes built on it yet · 157 m
    • 0.7 ha zoned for homes · no homes built on it yet · 170 m
    • 0.3 ha zoned for homes · no homes built on it yet · 181 m
    • 0.5 ha zoned for homes · no homes built on it yet · 184 m
    • 0.1 ha zoned for homes · no homes built on it yet · 190 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 9

    Applications within 500 m, by year

    Between 7 and 19 a year; busiest 2023. 77% of decisions were approvals.

    2017: 10, 2018: 16, 2019: 15, 2020: 13, 2021: 11, 2022: 7, 2023: 19, 2024: 19, 2025: 17, 2026: 8051015202017: 9 approved2017: 1 refused10’17*2018: 13 approved2018: 3 refused16’182019: 13 approved2019: 2 refused15’192020: 9 approved2020: 4 refused13’202021: 8 approved2021: 3 refused11’212022: 6 approved2022: 1 refused7’222023: 13 approved2023: 6 refused19’232024: 15 approved2024: 4 refused19’242025: 12 approved2025: 5 refused17’252026: 6 approved2026: 2 refused8’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 49 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    Building work nearby 36 in the last 12 months
    1 signed off as finished14 not signed off21 no sign-off needed
    • space 19, Kildare, R51 AX58 · 21 Oct 2026 · short notice no sign-off needed · 999 m
    • 2 Dara Park, Kildare, R51 X638 · 8 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 2561301 · 304 m
    • 5 Palace Field, Kildare, R51 A382 · 28 Sept 2026 · 1 homes · short notice no sign-off needed · 2660625 · 225 m
    • Unit 19, Kildare Village, Nurney Road, Nurney Road, Kildare, R51 AX58 · 14 Sept 2026 · short notice no sign-off needed · 949 m
    • Unit 2, Kildare Village, Nurney Road, Kildare, R51 HY54 · 7 Sept 2026 · short notice no sign-off needed · 921 m
    • Old Dublin Rd, Curraghfarm, Kildare, Kildare · 7 Sept 2026 · start notice not signed off · 2560363 · 1.7 km
    • Bothairin Na Gcorp, Kildare · 5 Sept 2026 · start notice not signed off · 2561319 · 452 m
    • Talamh Ban, whitelands East, Kildare · 31 Aug 2026 · 20 homes · 7-day notice not signed off · 26/60237 · 809 m
    • Grey Abbey Road, Kildare · 26 Aug 2026 · start notice not signed off · 24/60594 · 1.4 km
    • Nurney Road, Kildare, R51DC53 · 24 Aug 2026 · short notice no sign-off needed · 1.0 km
    • Melitta Road, Kildare · 29 Jul 2026 · 10 homes · start notice not signed off · 25/60274 · 741 m
    • Curragh Road, Kildare · 27 Jul 2026 · 60 homes · 7-day notice not signed off · 25/61466 · 561 m
    • Rathbride Road, Kildare · 21 Jul 2026 · short notice no sign-off needed · 25/60183 · 1.3 km
    • 454 Curragh Road, Kildare, R51 W897 · 21 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 2560400 · 1.2 km
    • 1213 Station Road, Kildare · 22 Jun 2026 · start notice not signed off · 233 m
    • Site at Former Magee Barracks, Kildare · 19 Jun 2026 · start notice not signed off · ABP-321159-24 · 656 m
    • 33 Oaktree Road, Cunaberry Hill, Kildare, R51 EP99 · 9 Jun 2026 · 1 homes · short notice no sign-off needed · 2660177 · 891 m
    • Kildare Village , Nurney Road, Kildare, R51 R265 · 5 Jun 2026 · short notice no sign-off needed · 990 m
    • Kildare, R51 TE83 · 2 Jun 2026 · short notice no sign-off needed · 859 m
    • tully west, Tully, Kildare · 28 May 2026 · 1 homes · start notice, opted out no sign-off needed · 2461117 · 1.9 km
    • 53 Kildare Village, Nurney Road, Kildare, R51 NW42 · 26 May 2026 · short notice no sign-off needed · 905 m
    • Kildare Village, Nurney Road, Nurney Road, Kildare, R51 R265 · 14 May 2026 · short notice no sign-off needed · 949 m
    • Unit 9B, Kildare Village, Nurney Road, Kildare, R51 R265 · 12 May 2026 · short notice no sign-off needed · 927 m
    • Unit 69, Kildare Village, Nurney Road, Kildare, R51 TE83 · 11 May 2026 · short notice no sign-off needed · 859 m
    • 2 Ruanbeg Drive, Kildare, R51 X965 · 7 May 2026 · 1 homes · short notice no sign-off needed · 23142 · 784 m
    • Magee Quarter, Kildare · 16 Apr 2026 · 6 homes · start notice not signed off · ABP-305007-19 & KCC PI REF: 24/290 · 756 m
    • Magee Quarter, Kildare · 16 Apr 2026 · 8 homes · start notice not signed off · ABP-305007-19 & KCC PI REF: 24/290 · 829 m
    • Whitesland, Kildare, R51 H240 · 2 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 2560683 · 983 m
    • Ard na Páirce Theas, Old Road, Kildare · 16 Mar 2026 · start notice not signed off · PA REF 23416 & ABP-318401-23 & 25/60453 · 598 m
    • Unit 35, Kildare Village, Nurney Road, Kildare, R51 RT73 · 3 Mar 2026 · short notice no sign-off needed · 1.0 km
    • Nurney Road, Kildare, R51 R265 · 2 Feb 2026 · short notice no sign-off needed · 931 m
    • Unit 63, Kildare Village, Kildare, R51 R265 · 28 Jan 2026 · 7-day notice signed off · 949 m
    • 22 Fair Green Road, Kildare · 19 Jan 2026 · 4 homes · start notice not signed off · 2461401 · 240 m
    • Oak Church Way, Kildare · 17 Dec 2025 · 7-day notice not signed off · 18/1026 & 18/1028 & 25/21 · 685 m
    • 651 Fair Green Road, Kildare, R51 DH73 · 21 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · 2560068 · 150 m
    • Dunmurray Road, Kildare · 3 Nov 2025 · 4 homes · start notice not signed off · 23335 · 740 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 19 Oct 2026, 01:33
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    Homes coming 302 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Just for Kids Creche Ltd · Crèche18 Nov 2024 · report · Tusla Early Years Inspectorate124 m
    Bright Beginnings · Crèche15 Apr 2025 · report · Tusla Early Years Inspectorate345 m
    Bright Beginnings · Crèche20 Nov 2024 · report · Tusla Early Years Inspectorate345 m
    Toad Hall Childcare · Crèche13 Jan 2025 · report · Tusla Early Years Inspectorate459 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Kildare County Council.
    Homes approved
    Here385
    Council middle0
    Homes started
    Here648
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    70% of homes built before 1971 (council 16%). 68% owner-occupied (council 71%).

    Homes built before 1971
    70% · council 16%
    Homes built since 2001
    5% · council 40%
    Owner-occupied
    68% · council 71%
    Rented
    28% · council 24%
    Children under 15
    12% · council 22%
    Aged 65 and over
    23% · council 12%
    Households with 2+ cars
    31% · council 51%
    Work mainly from home
    6% · council 12%
    This small area (214 people)Kildare

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 087050023

    Road noise
    45–49 dB
    day–night average (EPA 2022)
    Bus
    134 m
    Kildare Station · 883 · busiest stop within 500 m: 6 an hour at peak
    Radon
    1 in 10
    homes here likely high (EPA). Test it
    Nearest school
    409 m
    Kildare Town Educate Together NS, 417 pupils
    Homes sold nearby
    848
    in 3 years, 416 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Kildare Town Educate Together NS · primary · 417 pupils · 409 m
    • Gaelscoil Mhic Aodha · primary · 215 pupils · 544 m
    • St Brigid's Kildare Town Primary School · primary · 1025 pupils · 776 m
    • Kildare Town Community School · postprimary · 1014 pupils · 1.1 km

    Stops 18

    • Kildare Station · 883 · 0/hour at peak · 134 m
    • Kildare Station · 883 · 146 m
    • Kildare · Dublin - Cork, Dublin - Galway, Dublin - Limerick, Dublin - Portlaoise, Dublin - Tralee, Dublin - Waterford · 6/hour at peak · 228 m
    • Dara Park · 883 · 0/hour at peak · 252 m
    • Kildare · 883 · 0/hour at peak · 434 m
    • Kildare · 883 · 0/hour at peak · 440 m
    • Kildare · 126, 126A, 126B, 126D, 126E, 126T · 4/hour at peak · 461 m
    • Kildare · 126, 726, IW02, UM14 · 2/hour at peak · 478 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Kildare Town Educate Together NS · 409 m-0.7% pupils (417)
    • Gaelscoil Mhic Aodha · 544 m0% pupils (215) · a special education unit 2023, approved with conditions
    • St Brigid's Kildare Town Primary School · 776 m+1.3% pupils (1,025)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 19 Oct 2026, 02:28
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Council consultation portalsPublic19 Oct 2026, 01:38open
    Council meetings (ModernGov)Public19 Oct 2026, 02:28open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Zoned G4 (open space), not for homes: could you extend?
      Ask for: A solicitor's or planner's view.
      Solicitor · planner
    2. High radon area (1 in 10 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    3. Application 678 m away open for comments until 27 Oct 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Kildare
    Electoral division
    Kildare
    Electoral area
    Kildare
    Council
    Kildare County Council
    Everything we found, as a list 8 lines
    • Zoned G4 (open space); not protected; no vacant land tax; high radon area.
    • 17 sites nearby could change: 2 stalled builds, 5 approved schemes, 10 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 27 Oct 2026.
    • 302 homes approved nearby, not started; largest 136 at Southgreen Road Kildare Co. Kildare.
    • Kildare (train Dublin - Cork, Dublin - Galway) 228 m away: 6 an hour at morning peak; 13 from all stops within 500 m.
    • Noise from road traffic mapped at 45–49 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 68% owner-occupied (council 71%); 5% of homes empty (council 5%); most built 1946–1960; 47% drive to work (council 61%); population up 17% since 2016.
    • 2 home extensions within 250 m since 2026. 1 extension refused.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 29
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.019 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public19 Oct 2026
    www2.courts.ie—© the publisher19 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public19 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.019 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence19 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    water.ie—© the publisher · flag only—
    water.ie—© the publisher · flag only—
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 19 Oct 2026, 14:59 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.