PlanningRegister.ie
Site report · 500 m radius · generated 14 Sept 2026, 14:44

L2028

Eircode Coordinates 53.17734, -6.77638Local authority Kildare County Council
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

What closes soonest 0 open windows

No observation, appeal or consultation window is open within 500 m today.

    Sources: acp, consult, moderngov, npad, rzlt · fetched 12 Sept 2026, 00:05
    SourceLicenceFetchedLink
    acpCC-BY-4.012 Sept 2026, 00:05open
    consultpublic12 Sept 2026, 02:04open
    moderngovpublic13 Sept 2026, 21:50open
    npadCC-BY-4.013 Sept 2026, 20:39open
    rzltCC-BY-4.012 Sept 2026, 00:23open

    Where this is

    Local authority
    Kildare County Council
    Sources: places, parcels · fetched 11 Sept 2026, 21:28
    SourceLicenceFetchedLink
    placesCC-BY-4.011 Sept 2026, 21:28open
    parcelsCC-BY-4.011 Sept 2026, 19:06open

    Zoning evaluated against the point

    No zoning objective covers this site in the current plan (or the plan is not loaded for this county).

    Source: zoning · fetched 12 Sept 2026, 02:04
    SourceLicenceFetchedLink
    zoningCC-BY-4.012 Sept 2026, 02:04open

    Designations and constraints within 500 m

    No OPW CFRAM/NIFM flood extent within 500 m.

    DesignationCountExamples
    Radon risk area1About 1 in 10 homes in this area is likely to have high radon levels
    Sources: constraints, constraints.radon · fetched 11 Sept 2026, 19:11
    SourceLicenceFetchedLink
    constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)11 Sept 2026, 19:11open
    constraints.radonCC-BY-4.011 Sept 2026, 19:11open

    Residential Zoned Land Tax

    This site is not on the current draft or final RZLT map.

    Source: rzlt · fetched 12 Sept 2026, 00:23
    SourceLicenceFetchedLink
    rzltCC-BY-4.012 Sept 2026, 00:23open

    Planning applications 13 in 5 years within 500 m

    Recent decisions and applications

    11
    Conditional
    2
    Refused
    • Great Connell , Newbridge , Co. Kildare Conditional
      the retention of a single storey extension to the side of an existing single storey dwelling along with all site development and facilitating works.
      2660356received 3 Apr 2026decided 27 May 20261 units229 m away
    • To the east of Murphy International Limited Headquarters , Great Connell , Newbridge Conditional
      for a 44.5 m extension of the established spur road from the Newbridge Southern Outer Orbital Road (NSOOR) along the eastern boundary of the Murphy International Limited Headquarters site at Great Connell, Newbridge, and the widening and modification of the existing pedestrian zebra crossing on the spur road to the Headquarters site. The proposed spur road extension comprises a single carriageway road of 7.5m in width with 2 no. 2 m wide cycleways and 2 no. 2 m pedestrian pathways, a 1.5 m grass verge on each side, and a 1.5m landscape buffer zone along western boundary, and all associated development and works including surface water, water services and utilities infrastructure including lighting, landscaping and works
      2560060received 28 Jan 2025decided 23 May 202589 m away
    • Great Connell , Newbridge , Co Kildare Conditional
      For the consolidation and extend the established and permitted industrial and related activities on the MIL headquarters and industrial site to accommodate immediate and medium-term business development and employment generation objectives, to rationalise the car parking on the overall site to enhance safety for employees and site operatives, to make more efficient use of the space available on site and to enhance operational efficiencies, and related environmental and public realm improvements at the MIL headquarters complex. The proposed extension and works compromise the following: (1) Extension of the established yard over an area of 1.67 ha to the south of the established yard area to accommodate: (a) the construction of a vehicle maintenance building and associated offices (1,459 sq.m GFA) incorporating solar PV panels at roof level (224 sq.m), and 8 no. external storage tanks; (b) the extension of permitted access spur road off the Newbridge Southern Outer Orbital Route (NSOOR) over a distance of 44.5 m (KCC Ref: 211780) to accommodate access to the extended yard area, and a new agricultural access on the eastern side of the proposed road extension; (c) the construction of a two storey security and access control building at the entrance to site (269 sq.m GFA) incorporating solar PV Panels at roof level (22 sq.m); (d) a materials and construction equipment storage area; (e) a construction site cabin and container maintenance and storage area; (f) a vehicle and equipment wash down bay; (g) a HGV fueling plinth and above ground fuel tanks; (h) surface water drainage infrastructure; (i) HGV and service vehicle parking (8 no. spaces), plant maintenance with EV charging points; and (j) all associated landscaping, and ancillary development and works. (2) The reconfiguration and consolidation of existing car parking on the wider site (constructed under Reg. Ref. 21/1780) into a single car park on the eastern boundary of the yard accommodating 150 car parking spaces, an increase of 20 no. car parking spaces over that previously permitted, and the use of the relocated car parking areas as yard area ancillary to the established use of the site. (3) The removal of a surface water attenuation swale constructed under Ref. Ref. 21/1780 and the incorporation of that attenuation volume into a relocated swale and a proposed new underground stormtech attenuation system. (4) The demolition of an established storage building of 178 sq.m. (5) Retention of an enclosed c
      24393received 20 Dec 2024decided 22 May 20250 m away
    • Greatconnell , Newbridge , Co. Kildare Conditional
      for development at a site of c. 3.8 hectares at Greatconnell, Newbridge, Co. Kildare, and includes lands within the ownership of Kildare County Council along the Newbridge South Orbital Relief Road (c. 0.26 ha). The site is principally bounded by: Pfizer campus to the northwest; Keurig Dr Pepper manufacturing facility to the northeast; Newbridge South Orbital Relief Road to the southeast; and greenfield lands in the ownership of the applicant to the southwest. The proposed development primarily comprises the demolition of an existing car park and associated site clearance works and the construction of a distribution warehouse with ancillary office accommodation with a cumulative gross floor area (GFA) of c. 10,801 sqm. The development will consist of: 1 No. warehouse building (c. 10,801 sq m GFA, c. 160 m length, c. 65 m width, and c. 17 m height) inclusive of 1,242 sq m of office space which will include reception areas, conference/meeting rooms, breakout areas, canteens, and overnight truck driver accommodation; Truck yard comprising some 12 No. docking bays, HGV parking bays (13 No. between docks, 6 No. to the rear of the yard, 12 No. trailer-only parking bays to the east of the yard), associated circulation space, wash area, outdoor breakout area with smoking shelter, bin store, and sprinkler tank compound area; 2 No. site access points/roads off Newbridge South Orbital Relief Road to facilitate HGV and LGV access; Some 86 No. car parking spaces, including some 6 No. customer collection spaces, and some 17 No. EV car parking spaces; 44 No. bicycle spaces; Attenuation pond; Electricity substation and switch room along eastern access road (c. 32 sq m); Relocation of existing bus stop c. 100 m west along Newbridge South Orbital Relief Road to facilitate HGV and LGV access; and All ancillary works including drainage, SuDS, signage, cycle lanes, solar PV panels, fire tender access road, fencing, landscaping, lighting, plant and equipment, and all other associated works above and below ground
      2460657received 12 Jul 2024decided 2 Sept 2024231 m away
    • Renvyle , Great Connell , Newbridge Conditional
      for the replacement of existing roof to accommodate a first floor extension along with the remodelling of existing ground floor layout and front façade to include a canopy and bay windows along with removal of existing septic tank with permissions to connect to public foul sewer. Retention of change of use of existing detached bungalow for use as a residential care home, and proposed change of use for proposed development for use as a residential care home, retention of single storey detached garage as constructed and all associated site works
      2460379received 29 Apr 2024decided 2 Oct 2024323 m away
    • Site to the south of the Newbridge South Orbital Relief Road (NSORR) , in the townland of Greatconnell , Newbridge Conditional
      for modifications to the development previously permitted under KCC Planning Ref. 21/1248. The retention elements of the development consist of: i. Alterations to the outdoor smoking shelter providing for reduced dimensions of 2.23m (L) x 4.68m (W) x 2.65m (H), together with its relocation from the north-east of the warehouse building to the car park area west of the main office entrance; and ii. 3 additional car parking spaces within the overflow car park. The development will also consist of: i. Modifications to the northern (front) elevation to facilitate a new external entrance to the lift; ii. Revisions to the 2 entrance totem signs to provide for illuminated totem poles at each vehicular site access, the sign to the HGV/Truck entrance is 5.25m (H) x 1.5m (W) x 300mm (D) and the sign to the car park entrance is 3.25m (H) x 1m (W) x 200mm (D); iii. Changes to the permitted branding signage on the northern elevation of the warehouse building and north elevation of the Recovery Recycling Unit building to provide for signs with dimensions of 15m x 2.9m; iv. Wayfinding, directional and health and safety signs ranging from 0.36 sq.m to 1.68 sq.m, to be placed at 16 locations within the site; and v. all ancillary site development works
      2460108received 13 Feb 2024decided 8 Apr 202470 m away
    • Great Connell , Newbridge , Co. Kildare Conditional
      (a) The construction of new 2-storey extensions to the south-west (extension 1—proposed floor area of 81.9 m2) and north-east (extension 2—proposed floor area of 106.6 m2) ends of the existing 2-storey offices to the rear of the existing fabrication workshop to provide additional office and ancillary accommodation. (b) The construction of an internal pedestrian walkway link at first floor level (proposed floor area of 45.8 m2) within the existing fabrication workshop to connect the existing offices to the rear to the existing offices to the front that face the Newbridge South Orbital Relief Road (NSORR). (c) Modifications to the existing fabrication workshop & rear offices to include: • Replacement of all existing external windows & doors in the existing rear offices with new windows & doors. • Widening of some existing window openings in the existing rear offices to facilitate larger window openings. • Replacement of existing external wall finishes of the existing rear offices—forticrete blockwork at ground floor level and profiled metal cladding at first floor level—with new insulated cladding panels. • Amendments to the north-east elevation of the existing fabrication workshop to include new insulated cladding panels and new windows and doors. • Internal modifications to the existing rear offices and fabrication workshop to facilitate the proposed extension works and connection of the proposed internal pedestrian walkway link between the front and rear offices. (d) The provision of 5 additional car parking spaces to serve the proposed extension works. (e) The provision of 5 additional bicycle parking spaces to serve the proposed extension works. (f) The connection to existing services on site—i.e. connection into existing foul, surface water, & water main networks serving the existing building. (g) All associated ancillary site development works. Please note all other planning items relating to the overall Murphy International headquarters and site are to be completed as per details agreed under previously approved planning permission register reference no.: 21/1780. Development works agreed under this previous grant of permission are ongoing.
      2360087received 2 Aug 2023decided 26 Sept 202376 m away
    • Great Connell , Newbridge , Co. Kildare Refused
      the construction of a backland family cluster of houses consisting of one detached single storey dwelling and one detached two storey dwelling, each with separate waste-water treatment plant and percolation area; the utilisation and up-grading of the existing farm entrance and all associated site works
      23821received 1 Aug 2023decided 22 Sept 2023358 m away
    • Great Connell and Kilbelin , Newbridge , Co. Kildare. Conditional
      The development will consist of the provision of approximately 790m of new Distributor Road, including a new bridge over the River Liffey, forming part of the Newbridge South Outer Orbital Road (NSOOR) linking the Great Connell Road to the section of the NSOOR permitted under ABP Reg. Ref. 302141-18 (Belin Woods, currently under construction) and will comprise of the following works: Provision of a single carriageway road, with cycleways and footpaths in both directions, including a five-span bridge of approximately 170m over the River Liffey, with provision for future bus stops and associated toucan pedestrian crossing; Tie-in of the proposed section of Distributor Road with the Great Connell Road including upgrade of the existing roundabout to a signal control junction including toucan crossings on all arms of the junction; Provision of a proposed River Park of approximately 9.2 ha as a multi-use recreational amenity, including pedestrian and cycle routes connecting to existing public space network, a multi-use games area (MUGA) and incorporating biodiversity and water management features; Provision of 2 No. new agricultural entrances from the proposed Distributor Road to adjoining lands (pending any future residential development of those lands); and All associated earthworks, signage, lighting, drainage works, services and connections, landscaping works, environmental measures and all ancillary works above and below ground level. The application will be accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS)
      221504received 19 Dec 2022decided 8 Sept 2023113 m away
    • Great Connell , Newbridge , Co. Kildare Refused
      STRATEGIC HOUSING DEVELOPMENT (ABP DECISION) - demolition of existing site structures (2,622.3 sqm) and the construction of 569 no. residential units, a neighbourhood centre with 11 no. units (gross floor area 2,141 sqm) and a childcare facility (886 sqm), a circa 350 metre section of distributor road, and all ancillary and associated works on a site of 27.64 ha surrounding and including the dwellings of "Greatconnell" and "Valencia Lodge"
      22313306received 16 May 2022decided 30 Mar 202690 m away

    `description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.

    Source: npad · fetched 13 Sept 2026, 20:39
    SourceLicenceFetchedLink
    npadCC-BY-4.013 Sept 2026, 20:39open

    Appeals 0 in 5 years within 500 m

    No appeal to An Coimisiún Pleanála within 500 m in 5 years.

      Source: acp · fetched 12 Sept 2026, 00:05
      SourceLicenceFetchedLink
      acpCC-BY-4.012 Sept 2026, 00:05open

      Commencement notices 0 in 3 years within 500 m

      No commencement notice lodged with the Building Control Management System nearby.

        One notice can cover many buildings — count notices, never building rows, or a single multi-unit scheme reads as a trend (T11).

        Source: bcms · fetched 13 Sept 2026, 23:40
        SourceLicenceFetchedLink
        bcmsCC-BY-4.013 Sept 2026, 23:40open

        Sales 2 in 36 months within 500 m

        €558,500
        median price
        median €/m²
        2
        sales
        2
        rooftop-geocoded
        0
        with listing detail
        0
        new builds

        €470,000€647,000, 14 May 2024 to 27 Nov 2024.

        AddressSoldPriceAskingTypeBeds€/m²BERDist.
        10 WELLESLEY MANOR, GREAT CONNELL, NEWBRIDGE27 Nov 2024€647,000319 m
        68 WELLESLEY MANOR GREATCONNELL, NEWBRIDGE, KILDARE14 May 2024€470,000427 m

        PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).

        Sources: cara_listings, daft_gateway, ppr · fetched 11 Sept 2026, 20:14
        SourceLicenceFetchedLink
        cara_listingsThird-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.11 Sept 2026, 20:14open
        daft_gatewayThird-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.13 Sept 2026, 22:10open
        pprPSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.'13 Sept 2026, 20:32open

        Consultations 0 matched by place

        No open council consultation covers this place.

          Source: consult · fetched 12 Sept 2026, 02:04
          SourceLicenceFetchedLink
          consultpublic12 Sept 2026, 02:04open

          Council items 0 in 24 months

          No committee item is geolinked to this place. Council minutes are linked at county or electoral-area level, so this is usually empty for a single house.

            Source: moderngov · fetched 13 Sept 2026, 21:50
            SourceLicenceFetchedLink
            moderngovpublic13 Sept 2026, 21:50open

            Capacity and public land

            No publishable utility-capacity record within the radius.

            No site on the LDA register of relevant public lands within 500 m.

            Source: lda_lands · fetched 11 Sept 2026, 16:43
            SourceLicenceFetchedLink
            lda_landsCC-BY-4.011 Sept 2026, 16:43open

            Schools and public transport within 1.0 km

            Schools

            None within 1.0 km.

              Stops 0 · routes

                Sources: gtfs, schools · fetched 11 Sept 2026, 19:16
                SourceLicenceFetchedLink
                gtfsCC-BY-4.011 Sept 2026, 19:16open
                schoolsCC-BY-4.011 Sept 2026, 16:41open

                Sources used in this report

                SectionSourceLicenceFetched
                LocationplacesCC-BY-4.011 Sept 2026, 21:28
                ParcelparcelsCC-BY-4.011 Sept 2026, 19:06
                ZoningzoningCC-BY-4.012 Sept 2026, 02:04
                Constraintsconstraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)11 Sept 2026, 19:11
                Constraintsconstraints.radonCC-BY-4.011 Sept 2026, 19:11
                RzltrzltCC-BY-4.012 Sept 2026, 00:23
                PlanningnpadCC-BY-4.013 Sept 2026, 20:39
                AppealsacpCC-BY-4.012 Sept 2026, 00:05
                CommencementsbcmsCC-BY-4.013 Sept 2026, 23:40
                Salescara_listingsThird-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.11 Sept 2026, 20:14
                Salesdaft_gatewayThird-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.13 Sept 2026, 22:10
                SalespprPSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.'13 Sept 2026, 20:32
                Consultationsconsultpublic12 Sept 2026, 02:04
                Council itemsmoderngovpublic13 Sept 2026, 21:50
                Public landlda_landsCC-BY-4.011 Sept 2026, 16:43
                Projectssocial_housingCC-BY-SA-4.011 Sept 2026, 20:13
                AmenitiesgtfsCC-BY-4.011 Sept 2026, 19:16
                AmenitiesschoolsCC-BY-4.011 Sept 2026, 16:41
                DeadlinesacpCC-BY-4.012 Sept 2026, 00:05
                Deadlinesconsultpublic12 Sept 2026, 02:04
                Deadlinesmoderngovpublic13 Sept 2026, 21:50
                DeadlinesnpadCC-BY-4.013 Sept 2026, 20:39
                DeadlinesrzltCC-BY-4.012 Sept 2026, 00:23

                Generated 14 Sept 2026, 14:44 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.