PlanningRegister.ie
Kildare County Council · 2360087

Great Connell, Newbridge, Co. Kildare

Approved in Nov 2023. Built and signed off.

  1. 2 Aug 2023Received
  2. 26 Sept 2023Conditional
  3. 26 Nov 2023Final approval
  4. 19 Jun 2024Building started
  5. 16 Dec 2025Signed off
Status
Building started
Decision
Conditional · 26 Sept 2023
Council
Kildare County Council
Type
PERMISSION
Site
2,882 m²

What’s proposed

(a) The construction of new 2-storey extensions to the south-west (extension 1—proposed floor area of 81.9 m2) and north-east (extension 2—proposed floor area of 106.6 m2) ends of the existing 2-storey offices to the rear of the existing fabrication workshop to provide additional office and ancillary accommodation. (b) The construction of an internal pedestrian walkway link at first floor level (proposed floor area of 45.8 m2) within the existing fabrication workshop to connect the existing offices to the rear to the existing offices to the front that face the Newbridge South Orbital Relief Road (NSORR). (c) Modifications to the existing fabrication workshop & rear offices to include: • Replacement of all existing external windows & doors in the existing rear offices with new windows & doors. • Widening of some existing window openings in the existing rear offices to facilitate larger window openings. • Replacement of existing external wall finishes of the existing rear offices—forticrete blockwork at ground floor level and profiled metal cladding at first floor level—with new insulated cladding panels. • Amendments to the north-east elevation of the existing fabrication workshop to include new insulated cladding panels and new windows and doors. • Internal modifications to the existing rear offices and fabrication workshop to facilitate the proposed extension works and connection of the proposed internal pedestrian walkway link between the front and rear offices. (d) The provision of 5 additional car parking spaces to serve the proposed extension works. (e) The provision of 5 additional bicycle parking spaces to serve the proposed extension works. (f) The connection to existing services on site—i.e. connection into existing foul, surface water, & water main networks serving the existing building. (g) All associated ancillary site development works. Please note all other planning items relating to the overall Murphy International headquarters and site are to be completed as per details agreed under previously approved planning permission register reference no.: 21/1780. Development works agreed under this previous grant of permission are ongoing

Planning details

Reference
2360087
Local authority
Kildare County Council
Status
Commenced · register status “APPLICATION FINALISED”
Received
2 Aug 2023
Decision due
26 Sept 2023 · decided 26 Sept 2023
Decision
Conditional on 26 Sept 2023
Site area
2,882 m² from the mapped boundary, not the council's figure

Live near Great Connell?

Everything else planned on your street, in one report.

Check my street
Council register ↗

Nearby 9 · 500 m · 12 months

Distance
Time
Show all 9

Explore this area on the map →

Homes nearby

Building started

  • 19 Jun 2024 · Builder told the council work was starting (seven-day notice) SN0010504KE

Zoning

C6 — Waterfront

Zoned for waterfront and harbour-related development.

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

2360087 is a planning application to Kildare County Council for (a) The construction of new 2-storey extensions to the south-west (extension 1—proposed, received on 2 Aug 2023; permission was granted with conditions on 26 Sept 2023.