Planning report · South Dublin County Council · 500 m around the house · the last 12 months · 11 Oct 2026, 21:48

Ballymace Green

53.29366, -6.30613

Homes here mostly date from the 1950s. 4 planning files on this house, the latest from 2021. Home extensions nearby almost always get approved (96%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed. 4 planning files on this house, the latest from 2021.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960. 4 planning files on this house.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Ballymace GreenBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2021: SD20B/0224 · work already done, approved2020: ED20/0008 · extension, withdrawn or invalid2019: ED19/0019 · extension, withdrawn or invalid2019: SD18B/0479 · garden room, approved1999: 2 files on Ballymace Green2000: 2 files on Ballymace Green2004: 1 file on Ballymace Green2006: 1 file on Ballymace Green2007: 2 files on Ballymace Green2008: 1 file on Ballymace Green2009: 1 file on Ballymace Green2018: 1 file on Ballymace Green2021: 2 files on Ballymace Green13 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2021
    SD20B/0224 · work already done · approved 2021 · started, no sign-off needed
    approvedstartedsigned off?
  2. 2020
    ED20/0008 · extension · other decision
    approved?started?signed off?
  3. 2019
    ED19/0019 · extension · other decision
    approved?started?signed off?
  4. 2019
    SD18B/0479 · garden room · approved 2019 · started, no sign-off needed
    approvedstartedsigned off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

RES: To protect and/or improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

south dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Heritage inventory buildings4Orchardstown House; weir
Radon grid squares2
Monuments5Burial ground; Ecclesiastical enclosure
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: zoning, constraints.radon, rzlt, constraints, constraints.flood_cfram, constraints.niah, constraints.smr · fetched 4 Oct 2026, 23:11
SourceLicenceFetchedLink
zoningCC-BY-4.04 Oct 2026, 23:11open
constraints.radonCC-BY-4.027 Sept 2026, 19:36open
rzltCC-BY-4.04 Oct 2026, 23:59open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.flood_cframCC-BY-NC-ND-4.0 · not redistributable — shown as a flag only11 Sept 2026, 19:11open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 10 Oct 2026, 23:46
SourceLicenceFetchedLink
bcmsCC-BY-4.010 Oct 2026, 23:46open
npadCC-BY-4.011 Oct 2026, 01:43open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 93–99% by type. A new house in a garden is harder: 74% approved, and 1 in 2 are asked for more information.

Single-storey rear190 decided · more info asked 11%
97% · council 94%
Two-storey rear74 decided · more info asked 27%
97% · council 94%
Two-storey side53 decided · more info asked 36%
96% · council 94%
Single-storey side34 decided · more info asked 15%
97% · council 95%
Attic or dormer451 decided · more info asked 18%
97% · council 95%
First-floor49 decided · more info asked 12%
94% · council 92%
Garage conversion92 decided · more info asked 13%
99% · council 99%
Porch or front41 decided · more info asked 7%
93% · council 95%
New house in a garden or site86 decided · more info asked 57%
74% · council 62%
Approved nearbySouth Dublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 1,070 nearby, 4,892 council-wide

Figure 3

Ballymace Green, file by file since 1999

12 of 13 decided extensions on the road were approved.

13 planning files on Ballymace Green since 1999, by kind and decision.19992001200320052007200920112013201520172019202120232025Extensions, atticsNo. 1 · 1999 · other extension · approved · S99B/0026No. 4 · 1999 · attic conversion / dormer · refused · S99B/0405No. 6 · 2000 · rear · approved · S00B/0047No. 4 · 2000 · attic conversion / dormer · approved · S99B/0579No. 32 · 2004 · garage conversion · approved · SD04B/0355No. 8 · 2006 · garage conversion · approved · SD06B/0253No. 21 · 2007 · attic conversion / dormer · approved · SD07B/0353No. 25 · 2007 · attic conversion / dormer · approved · SD07B/0519No. 23 · 2008 · attic conversion / dormer · approved · SD08B/0078No. 25 · 2009 · single-storey rear · approved · SD09B/0199No. 29 · 2018 · garage conversion · approved · SD18B/0479No. 21 · 2021 · attic conversion / dormer · approved · SD20B/0141No. 28 · 2021 · garage conversion · approved · SD20B/0224Porches, roofs, otherNew house in a side garden
ApprovedRefusedWithdrawn or invalid

13 files with "Ballymace Green" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 1999–2026

Extensions and refusals right beside you 5 within 250 m · 0 refused within 100 m

Extensions and refusals near you 5 extensions within 250 m · the last 12 months

4 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey rear32—
Dormer or attic11—
Single-storey side11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 11 Oct 2026, 01:43
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Oct 2026, 01:43open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.010 Oct 2026, 23:46open
    npadCC-BY-4.011 Oct 2026, 01:43open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 70 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; Appeal window: 4 weeks; If appealed: +117 days; Building starts: 124 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 51–55 (n=871)55 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 117 days (n=105, all appeals within 1.5 km)+117 daysBuilding startsStart notice: median 124 days after permission (n=583)124 days after permissionSigned off405 days after the start, for the few who file. 52% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated1049 decided home extensions, 588 start notices, 105 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    22 of 41 appealed refusals became permissions. 3 of 64 appealed approvals were reversed.

    Refusals appealed41 decided
    22 became permissions
    Approvals appealed64 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months

    None of 1 changed the council's decision

    • 501117 Granted · 242, Templeogue Road, Templeogue, Dublin, D6 WKH50 · 303 m report
    Sources: acp, courts, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    courtsall-rights-reserved11 Oct 2026, 01:26open
    npadCC-BY-4.011 Oct 2026, 01:43open
    Question 4

    What's changing around you?

    Street map around Ballymace Green with 15 numbered planning items
    ⌖ the houseWindow closingDerelict buildingBuilding startedOtherApprovedNo decision yet
    1. 137 Marian Crescent, Dublin 14 SD26B/0349WApproved · 411 m
    2. 253 Marian Crescent, Rathfarnham 1185Derelict building · 332 m
    3. 313 Butterfield Avenue, Dublin 14 SD23B/0278Building started · 97 m
    4. 43 Old Bridge Road, Dublin 16 SD26B/0168WBuilding started · 198 m
    5. 532, Butterfield Avenue ED25/0094Section 5: exempt · 53 m
    6. 633, Ballymace Green ED25/0113Section 5: exempt · 57 m
    7. 712, Orchardstown Dr SD25B/0664WApproved · 69 m
    8. 81, Washington Park SD26B/0148WApproved · 173 m
    9. 93, Old Bridge Road SD26B/0168WApproved · 179 m
    10. 109, Old Bridge Road SD26B/0001WApproved · 200 m
    11. 1138, Anne Devlin Road SD25B/0302WApproved · 267 m
    12. 1242, Anne Devlin Road SD26B/0269Approved · 284 m
    13. 13242 Templeogue Road, Templeogue SD26B/0326WApproved · 303 m
    14. 1440, Woodbrook Park SD26B/0375WNo decision yet · 317 m
    15. 1554 Ballyroan Road, Templeogue SD26B/0385WNo decision yet · 318 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 203 permissions since 2016, 114 show a start notice and 6 have a completion certificate. Most owners opt out of sign-off.

    243 applications lodged within 500 m. Council: 200 approved, 19 refused. After appeals: 203 approved. Of those: 6 signed off, 62 built with the owner's opt-out, 46 started, 85 with no start notice found, 4 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT200: lodged → approved19: lodged → refused18: lodged → withdrawn or invalid6: lodged → undecided199: approved → approved15: refused → refused18: withdrawn or invalid → withdrawn6: undecided → undecided1 approved by the council, refused after an appeal4 refused by the council, approved after an appeal85: approved → no start notice found62: approved → built, owner opted out46: approved → started, not signed off6: approved → signed off4: approved → ran out243 lodged243 lodged200 approved200 approved19 refused19 refused18 withdrawn or invalid18 withdrawn or invalid6 undecided6 undecided203 approved203 approved16 refused16 refused18 withdrawn18 withdrawn6 undecided6 undecided85 no start notice found85 no start notice found62 built, owner opted out62 built, owner opted out46 started, not signed off46 started, not signed off6 signed off6 signed off4 ran out4 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured243 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 16 Oct 2026.

    1 deadlines in the next 30 days: 2026-10-16 SD26B/0349W: Grant Permission for Retention — Construction of a single-story garden structure in the rear garden and the construction of a covered storage area to thetoday16 Oct21 Oct26 Oct31 Oct5 Nov10 NovSD26B/0349W: Grant Permission for Retention — Construction of a single-story garden structure in the rear garden and the construction of a covered storage area to the · 411 m away · 2026-10-16
    Time to appeal ends
    • Time to appeal ends 16 Oct 20265 days left
      1SD26B/0349W · Grant Permission for Retention — Construction of a single-story garden structure in the rear garden and the…
      €220 to An Coimisiún Pleanála (€110 observer) · 411 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 1 within 500 m

    Derelict building 1

    • 253 Marian Crescent, Rathfarnham · derelict since Oct 2024 · 332 m
    Sources: acp, bcms, derelict, moderngov, npad, rzlt · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.010 Oct 2026, 23:46open
    derelictCC-BY-4.05 Oct 2026, 09:35open
    moderngovpublic11 Oct 2026, 01:26open
    npadCC-BY-4.011 Oct 2026, 01:43open
    rzltCC-BY-4.04 Oct 2026, 23:59open
    Figure 8

    Applications within 500 m, by year

    Between 18 and 31 a year; busiest 2018. 91% of decisions were approvals.

    2016: 6, 2017: 24, 2018: 31, 2019: 30, 2020: 23, 2021: 23, 2022: 29, 2023: 18, 2024: 22, 2025: 21, 2026: 160102030402016: 4 approved2016: 2 withdrawn or invalid6’16*2017: 18 approved2017: 5 refused2017: 1 withdrawn or invalid24’172018: 24 approved2018: 7 refused31’182019: 26 approved2019: 2 refused2019: 2 withdrawn or invalid30’192020: 21 approved2020: 2 refused23’202021: 19 approved2021: 2 refused2021: 2 withdrawn or invalid23’212022: 21 approved2022: 1 refused2022: 6 withdrawn or invalid2022: 1 undecided29’222023: 18 approved18’232024: 19 approved2024: 3 withdrawn or invalid22’242025: 18 approved2025: 2 withdrawn or invalid2025: 1 undecided21’252026: 12 approved2026: 4 undecided16’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 22 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: npad, acp, bcms · fetched 11 Oct 2026, 01:43
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Oct 2026, 01:43open
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.010 Oct 2026, 23:46open
    Building work nearby 11 in the last 12 months
    1 not signed off10 no sign-off needed
    • 313 Butterfield Avenue, Dublin 14, Dublin, D14 X432 · 14 Oct 2026 · start notice not signed off · SD23B/0278 · 97 m
    • 212 Templeogue Road, Dublin 6W, Dublin, D6W WY89 · 15 Sept 2026 · short notice no sign-off needed · SD25B/0308W · 408 m
    • 9 Old Bridge Road, Dublin 16, Dublin, D16 R861 · 11 Aug 2026 · start notice, opted out no sign-off needed · SD26B/0001W · 220 m
    • 242 Templeogue Road, Dublin, D6W KH50 · 10 Aug 2026 · start notice, opted out no sign-off needed · SD26B/0014W · 330 m
    • 54 Anne Devlin Road, Dublin 14, Dublin, D14 A3P0 · 7 Aug 2026 · short notice no sign-off needed · SD26B/0088W · 343 m
    • 43 Old Bridge Road, Dublin 16, Dublin, D16 VH58 · 31 Jul 2026 · start notice, opted out no sign-off needed · SD26B/0168W · 198 m
    • 31 Orchardstown Avenue, Dublin, D14 AT29 · 3 Jul 2026 · start notice, opted out no sign-off needed · SD24B/0447W · 491 m
    • 25 Butterfield Avenue, Rathfarnham, South Dublin, D14 CA40 · 7 Apr 2026 · start notice, opted out no sign-off needed · SD24B/0518 · 114 m
    • 28 Cypress Grove South, South Dublin, D6W T355 · 26 Mar 2026 · start notice, opted out no sign-off needed · SD25B/0254W · 479 m
    • Ballyroan Park, Dublin 16, South Dublin, D16 N6E5 · 3 Feb 2026 · start notice, opted out no sign-off needed · SD25B/0605W · 417 m
    • 60 Knocklyon Road, Templeogue, South Dublin, D16 XE42 · 5 Jan 2026 · start notice, opted out no sign-off needed · SD25B/0418W · 448 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: bcms · fetched 10 Oct 2026, 23:46
    SourceLicenceFetchedLink
    bcmsCC-BY-4.010 Oct 2026, 23:46open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Dodder Greenway——63 m
    Cheeverstown House99—378 m
    SDCC Lands @28 Locations——516 m
    Templeogue Village——529 m
    Cypress Grove House171—546 m
    Riverside Cottages——579 m
    MARIAN ROAD——606 m
    Rosemount District Centre——608 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Buttercup Creche · Crèche10 Jul 2025 · report · Tusla Early Years Inspectorate564 m
    Chestnut Montessori (IMEB) · Crèche22 Oct 2024 · report · Tusla Early Years Inspectorate580 m
    Horizons Montessori School · Crèche15 Jun 2026 · report · Tusla Early Years Inspectorate702 m
    Crescent Hill Pre- School · Crèche8 Nov 2024 · report · Tusla Early Years Inspectorate755 m
    Cool Kidz Creche · Crèche26 Mar 2026 · report · Tusla Early Years Inspectorate888 m
    Young Days Pre School & Montessori · Crèche5 Mar 2026 · report · Tusla Early Years Inspectorate965 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: dublin_pipeline, npad, schools, tusla_ey · fetched 5 Oct 2026, 23:01
    SourceLicenceFetchedLink
    dublin_pipelineCC-BY-4.05 Oct 2026, 23:01open
    npadCC-BY-4.011 Oct 2026, 01:43open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
    How busy is this area About as busy as most of South Dublin County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here12
    Council middle5
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.010 Oct 2026, 23:46open
    npadCC-BY-4.011 Oct 2026, 01:43open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    73% of homes built before 1971 (council 18%). 90% owner-occupied (council 67%).

    Homes built before 1971
    73% · council 18%
    Homes built since 2001
    7% · council 27%
    Owner-occupied
    90% · council 67%
    Rented
    7% · council 29%
    Children under 15
    19% · council 21%
    Aged 65 and over
    19% · council 13%
    Households with 2+ cars
    63% · council 40%
    Work mainly from home
    18% · council 10%
    This small area (472 people)South Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267113010

    Bus
    75 m
    Old Bridge Road · S6 · busiest stop within 500 m: 16 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    182 m
    Rathfarnham Parish NS, 215 pupils
    Homes sold nearby
    32
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Rathfarnham Parish NS · primary · 215 pupils · 182 m
    • Cheeverstown Sp Sch · primary · 29 pupils · 551 m
    • St Patrick Gns · primary · 472 pupils · 905 m
    • Coláiste Éanna · postprimary · 618 pupils · 949 m
    • Bishop Galvin Ns · primary · 461 pupils · 968 m
    • Bishop Shanahan Ns · primary · 437 pupils · 976 m
    • Our Ladys School · postprimary · 799 pupils · 983 m

    Stops 40

    • Old Bridge Road · S6 · 4/hour at peak · 75 m
    • Anne Devlin Road · S6 · 5/hour at peak · 116 m
    • Old Bridge Road · S6 · 5/hour at peak · 132 m
    • Woodbrook Pk · 15, F1, S6, UM08 · 15/hour at peak · 232 m
    • Old Bridge Rd · F1 · 4/hour at peak · 245 m
    • Woodbrook Pk · 15, F1, S6, UM08 · 16/hour at peak · 265 m
    • Templeogue Br · 15, 65, 65B, UM08 · 9/hour at peak · 334 m
    • Butterfield Grove · S6 · 5/hour at peak · 340 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Rathfarnham Parish NS · 182 m-2.3% pupils (215)
    • Cheeverstown Sp Sch · 551 m+11.5% pupils (29) · 2 classrooms 2026, section 5: awaiting decision · an extension 2025, no decision yet
    • St Patrick Gns · 905 m-1.5% pupils (472)
    • Coláiste Éanna · 949 m+1% pupils (618)
    • Bishop Galvin Ns · 968 m+2.4% pupils (461)
    • Bishop Shanahan Ns · 976 m-0.9% pupils (437)

    Open consultations

    Council meetings 25 items

    Public land

    • Dublin City Council · 0.72 ha · 283 m
    • Dublin City Council · 0.16 ha · 339 m
    • Dublin City Council · 0.11 ha · 355 m
    • Dublin City Council · 0.14 ha · 407 m
    • Dublin City Council · 3.1 ha · 481 m
    Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 4 Oct 2026, 23:41
    SourceLicenceFetchedLink
    gtfsCC-BY-4.04 Oct 2026, 23:41open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    npadCC-BY-4.011 Oct 2026, 01:43open
    consultpublic11 Oct 2026, 01:25open
    moderngovpublic11 Oct 2026, 01:26open
    lda_landsCC-BY-4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Work already done (SD20B/0224): work kept with permission. Done as approved?
      Ask for: The retention grant and an opinion of compliance.
      Seller · solicitor
    2. Garden room (SD18B/0479) built without official sign-off: built properly?
      Ask for: An engineer's opinion of compliance.
      Seller · solicitor
    3. Building work started 97 m away: for how long?
      Ask for: The planning conditions for SD23B/0278.
      Agent · council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Butterfield
    Electoral division
    Rathfarnham-Ballyroan
    Electoral area
    Rathfarnham-Templeogue
    Council
    South Dublin County Council
    Everything we found, as a list 8 lines
    • 4 applications on this site; latest SD20B/0224, approved 2021, started, no sign-off needed.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 1 site nearby could change: 1 derelict.
    • Woodbrook Pk (bus 15, F1) 265 m away: 16 an hour at morning peak; 81 from all stops within 500 m.
    • Here (2022 census): 90% owner-occupied (council 66%); 4% of homes empty (council 4%); most built 1946–1960; 56% drive to work (council 54%); population up 5% since 2016.
    • 5 home extensions within 250 m since 2025. Most were single-storey rear extensions.
    • The council decides in a median 49 days (about 7 weeks); 1 in 5 is asked for more information.
    • Homes started within 1 km: 2 in the last year, 25 three years before.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • Permission for work already done (Retention permission): An application to keep something that was built without permission.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 30
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.010 Oct 2026
    data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC-BY-NC-ND-4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC-BY-4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
    dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public11 Oct 2026
    www2.courts.ie—all-rights-reserved11 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.05 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC-BY-4.05 Oct 2026
    esbnetworks.ie—all-rights-reserved (esbnetworks.ie di… · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC-BY-4.04 Oct 2026
    lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)public11 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.011 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…11 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.04 Oct 2026
    gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
    gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.04 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 11 Oct 2026, 21:48 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.