PlanningRegister.ie
Planning report · Dun Laoghaire-Rathdown County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 12:36

Saint Columbanus Road, Windy Arbour, Farranboley

53.30659, -6.25015

Homes here mostly date from the 1950s. Home extensions nearby almost always get approved (94%). 63 homes approved 261 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Saint Columbanus RoadBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2021: 1 file on Saint Columbanus Road2022: 1 file on Saint Columbanus Road2025: 2 files on Saint Columbanus Road4 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Radon grid squares2
Protected buildings3Emmet House; Viaduct
Monuments8Bridge; Water mill - unclassified
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), Records of Protected Structures, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 92–100% by type. A new house in a garden is harder: 66% approved, and 1 in 3 is asked for more information.

Single-storey rear153 decided · more info asked 14%
97% · council 96%
Two-storey rear60 decided · more info asked 23%
92% · council 92%
Two-storey side25 decided · more info asked 16%
100% · council 95%
Single-storey side20 decided · more info asked 5%
95% · council 96%
Attic or dormer216 decided · more info asked 12%
92% · council 94%
First-floor26 decided · more info asked 19%
96% · council 90%
Garage conversion33 decided · more info asked 15%
94% · council 99%
Porch or front13 decided · more info asked 15%
92% · council 98%
New house in a garden or site41 decided · more info asked 37%
66% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 587 nearby, 3,892 council-wide

Figure 3

Saint Columbanus Road, file by file since 2021

1 of 1 decided extensions on the road were approved.

4 planning files on Saint Columbanus Road since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 8 · 2022 · first-floor · approved · D22A/0053Porches, roofs, otherNo. 40 · 2021 · other work · approved · D21B/0188No. 70 · 2025 · other work · withdrawn or invalid · D25A/0215/WEBNo. 70 · 2025 · other work · approved · D25A/0429/WEBNew house in a side garden
ApprovedRefusedWithdrawn or invalid

4 files with "Saint Columbanus Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 6 within 250 m · 0 refused within 100 m

Extensions and refusals near you 6 extensions within 250 m · the last 12 months

4 of 5 approved (80%) · most common: single-storey rear

4 approved1 refused1 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey rear43—
Dormer or attic101
Rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 53 days. 1 in 7 is asked for more information, which adds about 81 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 7): 134 days; Appeal window: 4 weeks; If appealed: +156 days; Building starts: 154 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 50–55 (n=558)53 daysIf more info asked (1 in 7)With further information: median 134 days (n=91)134 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 156 days (n=122, all appeals within 1.5 km)+156 daysBuilding startsStart notice: median 154 days after permission (n=352)154 days after permissionSigned off464 days after the start, for the few who file. 71% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated650 decided home extensions, 353 start notices, 122 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    14 of 42 appealed refusals became permissions. 5 of 87 appealed approvals were reversed.

    Refusals appealed42 decided
    14 became permissions
    Approvals appealed87 decided
    5 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 5 in the last 12 months

    2 of 2 changed the council's decision

    • 502265 Pending · 1 Coolnahinch, Dundrum Road, Dundrum, Dublin 14, D14X8P0 · 201 m
    • 501352 Granted · 37, Churchtown Road Lower, Churchtown, Dublin 14, D14W8X3 · 236 m
    • 324615 Pending · Alexandra College, Milltown Road, Dublin, · 410 m
    • 501930 Pending · Nullamore House, Richmond Avenue South, Dublin 6 · 341 m
    • 500514 Granted · 18, Saint Luke's Crescent, Milltown, Dublin 14, D14CX80 · 200 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Saint Columbanus Road, Windy Arbour, Farranboley with 15 numbered planning items
    ⌖ the houseApproved, not startedLarge schemeAppealApprovedRefusedOther
    1. 1Dunelm, Rydalmount 4578/22Approved, no sign building has started · 261 m
    2. 2Lands at Example Cross, Testtown EX/2026/0003No decision yet · 228 m
    3. 318, Saint Luke's Crescent 500514Appeal: approved · 200 m
    4. 415, Saint Columbanus Avenue D25B/0642/WEBApproved · 77 m
    5. 510, Churchtown Avenue D26A/0309Approved · 186 m
    6. 611, Churchtown Avenue D25A/0962/WEBApproved · 190 m
    7. 71 Coolnahinch, Dundrum Road D26A/0556/WEBRefused · 201 m
    8. 822, Patrick Doyle Road D25B/0690/WEBApproved · 207 m
    9. 91, Patrick Doyle Road D26A/0541/WEBApproved · 223 m
    10. 104, Churchtown Road Lower D26B/0462/WEBApproved · 230 m
    11. 1137, Churchtown Road Lower D26A/0145/WEBRefused · 236 m
    12. 1237, Churchtown Road Lower V/012/26Section 5: exempt · 236 m
    13. 13Site of c. 4.4609 ha located within the school campus at Alexandra College, Richmond Avenue South WEB1482/26Approved · 282 m
    14. 14Nullamore House, Richmond Avenue South WEB5606/25Approved · 341 m
    15. 155, Bank Side Cottages REF16726Section 5: awaiting decision · 377 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 101 permissions since 2016, 60 show a start notice and 9 have a completion certificate. Most owners opt out of sign-off.

    143 applications lodged within 500 m. Council: 99 approved, 21 refused. After appeals: 101 approved. Of those: 9 signed off, 39 built with the owner's opt-out, 12 started, 41 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT99: lodged → approved21: lodged → refused20: lodged → withdrawn or invalid3: lodged → undecided98: approved → approved15: refused → refused20: withdrawn or invalid → withdrawn3: undecided → undecided1 approved by the council, undecided after an appeal3 refused by the council, approved after an appeal1 refused by the council, undecided after an appeal2 refused by the council, withdrawn or invalid after an appeal41: approved → no start notice found39: approved → built, owner opted out12: approved → started, not signed off9: approved → signed off143 lodged143 lodged99 approved99 approved21 refused21 refused20 withdrawn or invalid20 withdrawn or invalid3 undecided3 undecided101 approved101 approved15 refused15 refused22 withdrawn22 withdrawn5 undecided5 undecided41 no start notice found41 no start notice found39 built, owner opted out39 built, owner opted out12 started, not signed off12 started, not signed off9 signed off9 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured143 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 10 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-10 ACP 501352: Grant permissiontoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecACP 501352: Grant permission · 236 m away · 2026-11-10
    High Court window ends
    • Time to ask the High Court for a review ends 10 Nov 20269 days left
      Grant permission
      236 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    63 homes 261 m away were approved Jan 2026 with no start notice yet; the permission runs to Jan 2031.

    Dunelm, Rydalmount · 63 homes: 63 homes approved Jan 2026, not started20242025202620272028202920302031Dunelm, Rydalmount · 63 homes261 m · 4578/2263 homes approved Jan 2026, not started63 homes approved Jan 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 1 within 500 m

    Approved, not started 1

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 16 and 36 a year; busiest 2025. 83% of decisions were approvals.

    2021: 32, 2022: 20, 2023: 24, 2024: 16, 2025: 36, 2026: 150102030402021: 26 approved2021: 4 refused2021: 2 withdrawn or invalid32’21*2022: 14 approved2022: 4 refused2022: 1 withdrawn or invalid2022: 1 undecided20’222023: 19 approved2023: 4 refused2023: 1 withdrawn or invalid24’232024: 12 approved2024: 1 refused2024: 3 withdrawn or invalid16’242025: 20 approved2025: 5 refused2025: 11 withdrawn or invalid36’252026: 8 approved2026: 3 refused2026: 2 withdrawn or invalid2026: 2 undecided15’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 26 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 14 in the last 12 months
    1 signed off as finished5 not signed off8 no sign-off needed
    • Unit 1.4B, Building 13, Dundrum Town Centre, Dublin, D16 KWD0 · 8 Oct 2026 · 7-day notice not signed off · 306 m
    • 11 Churchtown Avenue, Dublin 14, Dublin, D14 RC66 · 29 Sept 2026 · 1 homes · short notice no sign-off needed · D25A/0962/WEB · 201 m
    • 2 Olivemount Terrace, Dublin 14, Dublin, D14 P3K0 · 29 Sept 2026 · 1 homes · start notice not signed off · D23B/0387 · 397 m
    • Dundrum Road, Dublin 14, Dublin · 14 Aug 2026 · 231 homes · 7-day notice not signed off · PC/H/02/2025 · 374 m
    • 14 Churchtown Road Lower, Dublin 14, Dublin · 6 Jul 2026 · 7-day notice not signed off · 290 m
    • Richmond Avenue South, Dublin, Dublin 6, D06 T2V0 · 6 Jul 2026 · start notice not signed off · 434 m
    • 68 South Hill, Dartry, Dublin 6, D06 C6X8 · 25 May 2026 · start notice, opted out no sign-off needed · 5448/25 · 490 m
    • 28 Farrenboley Park, Dublin, Dún Laoghaire-Rathdown, D14 FE89 · 6 May 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0539/WEB · 383 m
    • 22 Patrick Doyle Road, Dublin, Dún Laoghaire-Rathdown, D14 DP08 · 24 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0690/WEB · 214 m
    • 47 Churchfields, Dundrum, Dublin, Dún Laoghaire-Rathdown, D14 V2T2 · 10 Feb 2026 · 1 homes · short notice no sign-off needed · D25B/0254 · 463 m
    • 70 Saint Columbanus Road, Dundrum, Dublin 14., Dún Laoghaire-Rathdown, D14 N2V1 · 3 Feb 2026 · start notice, opted out no sign-off needed · D25A/0429/WEB · 232 m
    • 30 Farrenboley Park, Windy Arbour, Dublin 14, Dún Laoghaire-Rathdown, D14 XD79 · 22 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · D24A/0724/WEB · 367 m
    • 37 Churchtown Road Lower, DUBLIN 14, Dún Laoghaire-Rathdown, D14 W8X3 · 5 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0721/WEB · 296 m
    • 8 Churchtown Close, Dublin 14, Dún Laoghaire-Rathdown, D14 Y767 · 3 Nov 2025 · start notice signed off · D25B/0293/WEB · 193 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 63 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Dunelm, Rydalmount5555 not started (2026-Q2)215 m
    Mount St. Mary's129129 not started (2026-Q2)271 m
    Mount Saint Mary's and Saint Joseph's——271 m
    Central Mental Hospital934934 not started (2026-Q2)643 m
    c.9.6 ha——643 m
    97A Highfield Park——917 m
    c.0.9ha at No. 97A Highfield Park——917 m
    Former Murphy and Gunn Site7474 not started (2026-Q2)940 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Ashgrove Creche & Montessori · Crèche7 Jul 2025 · report · Tusla Early Years Inspectorate491 m
    Giraffe Childcare Milltown · Crèche24 Jun 2025 · report · Tusla Early Years Inspectorate591 m
    Minerva Montessori · Crèche12 Feb 2026 · report · Tusla Early Years Inspectorate651 m
    Ashgrove Creche and Montessori School · Crèche5 Nov 2025 · report · Tusla Early Years Inspectorate666 m
    Daisychain Montessori & Childcare · Crèche3 Sept 2025 · report · Tusla Early Years Inspectorate806 m
    Templeogue Montessori · Crèche12 Aug 2025 · report · Tusla Early Years Inspectorate836 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here997
    Council middle49
    Homes started
    Here857
    Council middle94
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    86% of homes built before 1971 (council 38%). 60% owner-occupied (council 68%).

    Homes built before 1971
    86% · council 38%
    Homes built since 2001
    7% · council 25%
    Owner-occupied
    60% · council 68%
    Rented
    39% · council 29%
    Children under 15
    16% · council 18%
    Aged 65 and over
    21% · council 17%
    Households with 2+ cars
    19% · council 39%
    Work mainly from home
    16% · council 19%
    This small area (264 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267057006

    Rail noise
    55–59 dB
    day–night average (EPA 2022)
    Bus
    249 m
    Milltown Luas · S4 · busiest stop within 500 m: 22 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    435 m
    Alexandra College, 664 pupils
    Homes sold nearby
    79
    in 3 years, 21 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Alexandra College · postprimary · 664 pupils · 435 m
    • Our Ladys NS · primary · 176 pupils · 553 m

    Stops 40

    • Milltown Luas · S4 · 6/hour at peak · 249 m
    • Milltown Luas · S4 · 6/hour at peak · 266 m
    • Millmount Trce · 142, 44, 44D, S4 · 8/hour at peak · 281 m
    • St Luke's Crescent · 142, 44, 44D, S4 · 8/hour at peak · 291 m
    • St Luke's Crescent · 142, 44, 44D, S4 · 8/hour at peak · 295 m
    • Shangarry · S4 · 6/hour at peak · 300 m
    • Millmount Trce · 142, 44, 44D, S4 · 8/hour at peak · 321 m
    • Milltown · Green · 20/hour at peak · 356 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Alexandra College · 434 m-0.3% pupils (664) · an extension 2024, approved
    • Our Ladys NS · 553 m-8.3% pupils (176)

    Council meetings 1 items

    Public land

    • Dublin City Council · 2.18 ha · 13 m
    • Dublin City Council · 0.52 ha · 118 m
    • Dublin City Council · 1.04 ha · 158 m
    • Dublin City Council · 0.12 ha · 174 m
    • Dublin City Council · 0.43 ha · 188 m
    • Dublin City Council · 0.11 ha · 235 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Rathmines Great
    Electoral division
    Clonskeagh-Farranboley
    Electoral area
    Dundrum
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 1 site nearby could change: 1 approved scheme.
    • 63 homes approved nearby, not started; largest 63 at Dunelm, Rydalmount.
    • Milltown (Luas Green) 359 m away: 22 an hour at morning peak; 134 from all stops within 500 m.
    • Noise from rail mapped at 55–59 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 60% owner-occupied (council 68%); 4% of homes empty (council 6%); most built 1946–1960; 37% drive to work (council 43%); population up 8% since 2016.
    • 6 home extensions within 250 m since 2025: 4 approved (80%). Most were single-storey rear extensions. 1 dormer or attic conversion refused.
    • The council decides in a median 52 days (about 7 weeks); 1 in 8 is asked for more information.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 30
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 12:36 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.