PlanningRegister.ie
Planning report · Dun Laoghaire-Rathdown County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 16:47

Whitebeam Road, Milltown

53.31202, -6.24476

Homes here mostly date from 1919–1945. 1 planning file on this house, the latest from 2024. Home extensions nearby almost always get approved (94%). 2 applications nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed. 1 planning file on this house, the latest from 2024.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945. 1 planning file on this house.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Whitebeam RoadBuilt: most homes in this small area date from 1919–1945 (census estimate)most built2024: D24A/0671/WEB · the development will, approved2021: 1 file on Whitebeam Road2022: 2 files on Whitebeam Road2023: 3 files on Whitebeam Road2024: 4 files on Whitebeam Road2025: 4 files on Whitebeam Road2026: 1 file on Whitebeam Road15 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2024
    D24A/0671/WEB · the development will · approved 2024 · started, no sign-off needed
    approvedstartedsigned off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Protected building1 within 100 m Clonskeagh Castle
Radon1 in 10 homes have high radon (EPA)

Not on this site: heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Smurfit Paper Mills (574 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 500 mCountFor example
Radon grid squares2
Protected buildings4Emmet House; Richview Lodge
Monuments15Bridge; Water mill - unclassified
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 88–100% by type. A new house in a garden is harder: 65% approved, and 1 in 3 is asked for more information.

Single-storey rear143 decided · more info asked 11%
97% · council 96%
Two-storey rear76 decided · more info asked 26%
96% · council 92%
Two-storey side14 decided · more info asked 21%
100% · council 95%
Single-storey side17 decided · more info asked 6%
100% · council 96%
Attic or dormer190 decided · more info asked 13%
91% · council 94%
First-floor34 decided · more info asked 26%
88% · council 90%
Garage conversion21 decided · more info asked 14%
90% · council 99%
Porch or front12 decided · more info asked 25%
92% · council 98%
New house in a garden or site43 decided · more info asked 40%
65% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 550 nearby, 3,892 council-wide

Figure 3

Whitebeam Road, file by file since 2021

9 of 9 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 2.

15 planning files on Whitebeam Road since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 9 · 2021 · two-storey rear · approved · D21A/0101No. 14 · 2023 · single-storey rear · approved · D23A/0373No. 13 · 2023 · porch / front · approved · D23A/0394No. 70 · 2024 · garage conversion · approved · D24A/0671/WEBNo. 76 · 2024 · other extension · approved · D24A/0786No. 42 · 2025 · single-storey rear · withdrawn or invalid · D25A/0953/WEBNo. 42 · 2025 · single-storey rear · approved · D25A/0975/WEBNo. 42 · 2025 · attic conversion / dormer · approved · D25B/0703/WEBNo. 43 · 2025 · side · approved · D25B/0710/WEBNo. 42 · 2026 · attic conversion / dormer · approved · D26B/0114/WEBPorches, roofs, otherNo. 34 · 2022 · other work · approved · D22A/0703No. 90 · 2022 · other work · approved · D22B/0196No. 80 · 2024 · other work · approved · D24A/0479/WEBNew house in a side gardenNo. 78 · 2023 · new house · refused · D23A/073178No. 78 · 2024 · new house · approved · D24A/049678
ApprovedRefusedWithdrawn or invalid

15 files with "Whitebeam Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 10 within 250 m · 0 refused within 100 m

Extensions and refusals near you 10 extensions within 250 m · the last 12 months

7 of 7 approved (100%) · most common: single-storey rear

7 approved3 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey rear43—
Dormer or attic22—
Two-storey rear21—
Other10—
Side11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 70 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 128 days; Appeal window: 4 weeks; If appealed: +153 days; Building starts: 156 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 52–55 (n=518)55 daysIf more info asked (1 in 6)With further information: median 128 days (n=101)128 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 153 days (n=136, all appeals within 1.5 km)+153 daysBuilding startsStart notice: median 156 days after permission (n=338)156 days after permissionSigned off428 days after the start, for the few who file. 65% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated620 decided home extensions, 339 start notices, 136 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    14 of 47 appealed refusals became permissions. 5 of 95 appealed approvals were reversed.

    Refusals appealed47 decided
    14 became permissions
    Approvals appealed95 decided
    5 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months

    1 of 1 changed the council's decision

    • 324615 Pending · Alexandra College, Milltown Road, Dublin, · 294 m
    • 500514 Granted · 18, Saint Luke's Crescent, Milltown, Dublin 14, D14CX80 · 481 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Whitebeam Road, Milltown with 15 numbered planning items
    ⌖ the houseOpen for commentsBuilding startedApprovedNo decision yetOther
    1. 1106 Ramleh Park, Dublin 6 WEB3450/26No decision yet · 279 m
    2. 259, Whitethorn Road D26B/0541/WEBNo decision yet · 350 m
    3. 343 Whitebeam Road, D14 D25B/0710/WEBBuilding started · 88 m
    4. 442 Whitebeam Road, Dublin 14 D26B/0114/WEB -D25B/0703/WEBBuilding started · 174 m
    5. 542 Whitebeam Road, Dublin 14 D25A/0975/WEBBuilding started · 176 m
    6. 643, Whitebeam Road D25B/0710/WEBApproved · 71 m
    7. 78, Strand Terrace WEB5959/25No decision yet · 99 m
    8. 842, Whitebeam Road D26B/0114/WEBApproved · 166 m
    9. 917, Whitethorn Road D26B/0265/WEBApproved · 184 m
    10. 10The Lodge, Milltown Road WEB2518/26No decision yet · 215 m
    11. 1150, Ramleh Park WEB6064/25Approved · 219 m
    12. 12Site of c. 4.4609 ha located within the school campus at Alexandra College, Richmond Avenue South WEB1482/26Approved · 242 m
    13. 1333, Whitebeam Avenue D26A/0297/WEBApproved · 246 m
    14. 143, Maple Road REF12626Section 5: awaiting decision · 256 m
    15. 15Bus Stop 3562, Milltown Road WEB2861/26No decision yet · 289 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 96 permissions since 2016, 47 show a start notice and 3 have a completion certificate. Most owners opt out of sign-off.

    124 applications lodged within 500 m. Council: 93 approved, 8 refused. After appeals: 96 approved. Of those: 3 signed off, 26 built with the owner's opt-out, 18 started, 47 with no start notice found, 2 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT93: lodged → approved8: lodged → refused17: lodged → withdrawn or invalid6: lodged → undecided93: approved → approved4: refused → refused17: withdrawn or invalid → withdrawn6: undecided → undecided3 refused by the council, approved after an appeal1 refused by the council, undecided after an appeal47: approved → no start notice found26: approved → built, owner opted out18: approved → started, not signed off3: approved → signed off2: approved → ran out124 lodged124 lodged93 approved93 approved8 refused8 refused17 withdrawn or invalid17 withdrawn or invalid6 undecided6 undecided96 approved96 approved4 refused4 refused17 withdrawn17 withdrawn7 undecided7 undecided47 no start notice found47 no start notice found26 built, owner opted out26 built, owner opted out18 started, not signed off18 started, not signed off3 signed off3 signed off2 ran out2 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured124 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 9 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-09 WEB3450/26: application received — The development will consist of the removal of the existing ground floor, rear lean-to extension and the construction of; 2026-11-17 D26B/0541/WEB: application received — (a) The demolition of an existing ground floor, single-storey, side carport doortoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecWEB3450/26: application received — The development will consist of the removal of the existing ground floor, rear lean-to extension and the construction of · 279 m away · 2026-11-09D26B/0541/WEB: application received — (a) The demolition of an existing ground floor, single-storey, side carport door · 350 m away · 2026-11-17
    Comments close
    • Comments close 9 Nov 20268 days left
      1WEB3450/26 · application received — The development will consist of the removal of the existing ground floor, rear lean-to extension…
      €20 to the council · 279 m away
    • Comments close 17 Nov 202616 days left
      2D26B/0541/WEB · application received — (a) The demolition of an existing ground floor, single-storey, side carport door
      €20 to the council · 350 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Applications within 500 m, by year

    Between 14 and 25 a year; busiest 2022. 92% of decisions were approvals.

    2021: 22, 2022: 25, 2023: 14, 2024: 22, 2025: 22, 2026: 1901020302021: 18 approved2021: 2 refused2021: 2 withdrawn or invalid22’21*2022: 22 approved2022: 2 refused2022: 1 withdrawn or invalid25’222023: 11 approved2023: 2 refused2023: 1 withdrawn or invalid14’232024: 21 approved2024: 1 withdrawn or invalid22’242025: 13 approved2025: 2 refused2025: 6 withdrawn or invalid2025: 1 undecided22’252026: 8 approved2026: 6 withdrawn or invalid2026: 5 undecided19’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 30 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 11 in the last 12 months
    3 not signed off8 no sign-off needed
    • 33 Whitebeam Avenue, Dublin 14, Dublin, D14 NP99 · 5 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · D26A/0297/WEB · 256 m
    • 9-14 Milltown Road, Dublin 6 · 17 Sept 2026 · 7-day notice not signed off · ABP-313048-22 & 2775/24 · 348 m
    • Unit 1, Richview Office Park, Clonskeagh, Dublin 14, Dublin, D14 W6X6 · 15 Sept 2026 · short notice no sign-off needed · 451 m
    • Dundrum Road, Dublin 14, Dublin · 14 Aug 2026 · 231 homes · 7-day notice not signed off · PC/H/02/2025 · 439 m
    • 542 Whitebeam Road, Dublin 14, Dublin, D14 K634 · 10 Aug 2026 · short notice no sign-off needed · D25A/0975/WEB · 176 m
    • Richmond Avenue South, Dublin, Dublin 6, D06 T2V0 · 6 Jul 2026 · start notice not signed off · 476 m
    • 442 Whitebeam Road, Dublin 14, Dublin, D14 K634 · 15 Jun 2026 · 1 homes · short notice no sign-off needed · D26B/0114/WEB -D25B/0703/WEB · 174 m
    • 343 Whitebeam Road, D14, Dún Laoghaire-Rathdown, D14 WD52 · 28 May 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0710/WEB · 88 m
    • 47 Churchfields, Dundrum, Dublin, Dún Laoghaire-Rathdown, D14 V2T2 · 10 Feb 2026 · 1 homes · short notice no sign-off needed · D25B/0254 · 405 m
    • land adjacent 78 Whitebeam Road, Dodder Beeches, Dún Laoghaire-Rathdown · 8 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · D24A/0496 · 79 m
    • 22 Laburnum Road, Clonskeagh, Dún Laoghaire-Rathdown, D14 DT28 · 19 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · D25A/0115/WEB · 425 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Former Murphy and Gunn Site7474 not started (2026-Q2)314 m
    Former Paper Mills Site3030 not started (2026-Q2)347 m
    Mount Saint Mary's and Saint Joseph's——406 m
    Former Smurfit Paper Mills Site167—443 m
    Mount St. Mary's129129 not started (2026-Q2)450 m
    Dunelm, Rydalmount5555 not started (2026-Q2)516 m
    Milltown Park636636 not started (2026-Q2)541 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Daisychain Montessori & Childcare · Crèche3 Sept 2025 · report · Tusla Early Years Inspectorate209 m
    Giraffe Childcare Milltown · Crèche24 Jun 2025 · report · Tusla Early Years Inspectorate258 m
    David Lloyd Leisure Creche · Crèche5 Aug 2025 · report · Tusla Early Years Inspectorate730 m
    Little Treasures Playschool · Crèche26 Feb 2025 · report · Tusla Early Years Inspectorate881 m
    Willow House Montessori · Crèche27 Nov 2025 · report · Tusla Early Years Inspectorate907 m
    Little Steps Montessori · Crèche22 Apr 2026 · report · Tusla Early Years Inspectorate953 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here91
    Council middle36
    Homes started
    Here277
    Council middle88
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    98% of homes built before 1971 (council 38%). 83% owner-occupied (council 68%).

    Homes built before 1971
    98% · council 38%
    Homes built since 2001
    2% · council 25%
    Owner-occupied
    83% · council 68%
    Rented
    11% · council 29%
    Children under 15
    17% · council 18%
    Aged 65 and over
    20% · council 17%
    Households with 2+ cars
    54% · council 39%
    Work mainly from home
    23% · council 19%
    This small area (389 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267055003

    Bus
    228 m
    Alexandra College · 44, 44D · busiest stop within 500 m: 8 an hour at peak
    Radon
    1 in 10
    homes here likely high (EPA). Test it
    Flood
    Yes
    OPW flood map area within 100 m
    Nearest school
    389 m
    Alexandra College, 664 pupils
    Homes sold nearby
    96
    in 3 years, 20 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Alexandra College · postprimary · 664 pupils · 389 m
    • Gonzaga College · postprimary · 576 pupils · 617 m

    Stops 42

    • Alexandra College · 44, 44D · 1/hour at peak · 228 m
    • Alexandra College · 44, 44D · 1/hour at peak · 246 m
    • Bankside Cottages · S4 · 6/hour at peak · 250 m
    • Glenmalure Square · 44, 44D · 1/hour at peak · 269 m
    • Glenmalure Square · 44, 44D · 1/hour at peak · 300 m
    • Shangarry · S4 · 6/hour at peak · 345 m
    • Richview Office Pk · 11 · 3/hour at peak · 396 m
    • Milltown Road · 44, 44D · 1/hour at peak · 428 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Alexandra College · 389 m-0.3% pupils (664) · an extension 2024, approved
    • Gonzaga College · 617 m+0.5% pupils (576) · an extension 2024, approved

    Council meetings 2 items

    Public land

    • Dublin City Council · 0.51 ha · 91 m
    • Dublin City Council · 1.01 ha · 162 m
    • Health Service Executive · 0.15 ha · 176 m
    • Dublin City Council · 0.22 ha · 185 m
    • Dublin City Council · 0.11 ha · 355 m
    • Dublin City Council · 0.43 ha · 366 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. The development will (D24A/0671/WEB) built without official sign-off: built properly?
      Ask for: An engineer's opinion of compliance.
      Seller · solicitor
    2. Flood risk area within 100 m: can you insure it?
      Ask for: A flood-cover quote before sale agreed.
      Insurer
    3. High radon area (1 in 10 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    4. Application 279 m away open for comments until 9 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    5. Building work started 88 m away: for how long?
      Ask for: The planning conditions for D25B/0710/WEB.
      Agent · council
    6. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Roebuck
    Electoral division
    Clonskeagh-Milltown
    Electoral area
    Stillorgan
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest D24A/0671/WEB, approved 2024, started, no sign-off needed.
    • Zoned R2 (existing residential); not protected; no vacant land tax; flood risk area within 100 m; high radon area.
    • Nothing nearby looks set to change.
    • 2 applications open for comments nearby; nearest closes 9 Nov 2026.
    • St Luke's Crescent (bus 142, 44) 466 m away: 8 an hour at morning peak; 52 from all stops within 500 m.
    • Here (2022 census): 83% owner-occupied (council 68%); 2% of homes empty (council 6%); most built 1919–1945; 38% drive to work (council 43%); population up 10% since 2016.
    • 10 home extensions within 250 m since 2025: 7 approved (100%). Most were single-storey rear extensions.
    • The council decides in a median 52 days (about 7 weeks); 1 in 8 is asked for more information.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 32
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 16:47 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.