PlanningRegister.ie
Planning report · Dublin City Council · 500 m around the house · the last 12 months · 26 Oct 2026, 23:30

Shrewsbury

53.32608, -6.22012

Homes here mostly date from the 1980s. Home extensions nearby almost always get approved (91%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1981–90, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1981–1990.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1981–1990 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Protected building4 within 100 m House; House
Radon1 in 20 homes have high radon (EPA)

Not on this site: heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 500 mCountFor example
Radon grid squares1
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM) · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 91–100% by type. A new house in a garden is harder: 69% approved, and 1 in 3 is asked for more information.

Single-storey rear103 decided · more info asked 15%
91% · council 97%
Two-storey rear62 decided · more info asked 18%
97% · council 96%
Two-storey side13 decided · more info asked 31%
100% · council 98%
Attic or dormer162 decided · more info asked 15%
91% · council 96%
First-floor33 decided · more info asked 21%
94% · council 94%
Garage conversion16 decided · more info asked 19%
94% · council 99%
New house in a garden or site51 decided · more info asked 31%
69% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 440 nearby, 5,452 council-wide

Extensions and refusals right beside you 5 within 250 m · 0 refused within 100 m

Extensions and refusals near you 5 extensions within 250 m · the last 12 months

4 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic32—
Garage conversion11—
Other11—

On Shrewsbury: 4 extensions in 10 years; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 77 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 133 days; Appeal window: 4 weeks; If appealed: +150 days; Building starts: 145 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=410)55 daysIf more info asked (1 in 6)With further information: median 133 days (n=93)133 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 150 days (n=142, all appeals within 1.5 km)+150 daysBuilding startsStart notice: median 145 days after permission (n=267)145 days after permissionSigned off463 days after the start, for the few who file. 64% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated503 decided home extensions, 274 start notices, 142 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    15 of 61 appealed refusals became permissions. 10 of 87 appealed approvals were reversed.

    Refusals appealed61 decided
    15 became permissions
    Approvals appealed87 decided
    10 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 9 in the last 12 months

    3 of 3 changed the council's decision

    • 502049 Pending · 1 Sydenham Road, Ballsbridge, Dublin 4 · 325 m
    • 501935 Pending · 30 Park Court, Dubln 4, D04XK76 · 211 m
    • 501490 Refused · Pembroke Wanderers HC, 27A Serpentine Avenue, Dublin 4, D04 T329 · 295 m
    • 501512 Refused · Pembroke Wanderers HC, 27A Serpentine Avenue, Dublin 4, D04 T329 · 295 m
    • 501439 Refused · Pembroke Wanderers HC, 27A Serpentine Avenue, Dublin 4, D04 T329 · 295 m
    • 501517 Invalid · Pembroke Wanderers HC, 27A Serpentine Avenue, Dublin 4, D04 T329 · 295 m
    • 501506 Invalid · Pembroke Wanderers HC, 27A Serpentine Avenue, Dublin 4, D04 T329 · 295 m
    • 501418 Invalid · Pembroke Wanderers HC, 27A Serpentine Avenue, Dublin 4, D04 T329 · 295 m
    • 501421 Invalid · Pembroke Wanderers HC, 27A Serpentine Avenue, Dublin 4, D04 T329 · 295 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 26 Oct 2026, 23:11
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher26 Oct 2026, 23:11open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 4

    What's changing around you?

    Street map around Shrewsbury with 15 numbered planning items
    ⌖ the houseDerelict buildingBuilding startedNo decision yetApproved
    1. 140 Park Avenue Dublin 4 D04RP74 DS1263Derelict building · 477 m
    2. 231 Sandymount Avenue, Dublin WEB1885/26Building started · 184 m
    3. 310, Wilfield Road WEB2485/26No decision yet · 138 m
    4. 472, Wilfield Road 5107/26Approved · 138 m
    5. 5Saint Joseph's, 31 Sandymount Avenue WEB1885/26Approved · 165 m
    6. 686, Wilfield Road WEB1093/26Approved · 183 m
    7. 759 Wilfield Road, Sandymount WEB5709/25Approved · 200 m
    8. 830 Park Court, Dubln 4 5146/26Approved · 211 m
    9. 914 Churchill Terrace, Ballsbridge WEB2134/26Approved with conditions · 250 m
    10. 10128, Merrion Road WEB1611/26Approved · 262 m
    11. 11Pembroke Wanderers HC, 27A Serpentine Avenue WEB5829/25Approved · 295 m
    12. 12Lands at Lansdowne Football Club, Claremont Road WEB1919/26Approved · 313 m
    13. 13Wanderer's F. C. Rugby Club . 65A Merrion Road, Dublin 4 WEB1828/26Approved · 319 m
    14. 14A. C.18 ha site at Coolbeg, 14 WEB5862/25Approved · 362 m
    15. 1511, Merlyn Road WEB1851/26Approved with conditions · 384 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 118 permissions since 2016, 52 show a start notice and 7 have a completion certificate.

    156 applications lodged within 500 m. Council: 121 approved, 16 refused. After appeals: 118 approved. Of those: 7 signed off, 26 built with the owner's opt-out, 19 started, 66 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT121: lodged → approved16: lodged → refused14: lodged → withdrawn or invalid5: lodged → undecided118: approved → approved15: refused → refused14: withdrawn or invalid → withdrawn5: undecided → undecided1 approved by the council, undecided after an appeal1 approved by the council, refused after an appeal1 approved by the council, withdrawn or invalid after an appeal1 refused by the council, undecided after an appeal66: approved → no start notice found26: approved → built, owner opted out19: approved → started, not signed off7: approved → signed off156 lodged156 lodged121 approved121 approved16 refused16 refused14 withdrawn or invalid14 withdrawn or invalid5 undecided5 undecided118 approved118 approved16 refused16 refused15 withdrawn15 withdrawn7 undecided7 undecided66 no start notice found66 no start notice found26 built, owner opted out26 built, owner opted out19 started, not signed off19 started, not signed off7 signed off7 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured156 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 7

      Approved, stalled or planned, not built yet

      BusConnects Core Bus Corridors is planned 935 m away.

      BusConnects Core Bus…: core bus corridor (DLR County Development Plan 2022-2028)20242025202620272028BusConnects Core Bus…935 m · plannedcore bus corridor (DLR County Development Plan 2022-2028)today

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 1 within 500 m

      Derelict building 1

      • 140 Park Avenue Dublin 4 D04RP74 · derelict since Aug 2020 · 477 m
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 26 Oct 2026, 23:09
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      Council meetings (ModernGov)Public26 Oct 2026, 01:54open
      National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 8

      Applications within 500 m, by year

      Between 24 and 33 a year; busiest 2025. 88% of decisions were approvals.

      2021: 26, 2022: 27, 2023: 26, 2024: 24, 2025: 33, 2026: 200102030402021: 20 approved2021: 5 refused2021: 1 undecided26’21*2022: 23 approved2022: 4 refused27’222023: 23 approved2023: 3 refused26’232024: 22 approved2024: 1 refused2024: 1 withdrawn or invalid24’242025: 22 approved2025: 1 refused2025: 10 withdrawn or invalid33’252026: 11 approved2026: 2 refused2026: 3 withdrawn or invalid2026: 4 undecided20’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 27 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 26 Oct 2026, 01:57
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
      Building work nearby 10 in the last 12 months
      1 not signed off9 no sign-off needed
      • 231 Sandymount Avenue, Dublin, Dublin 4, D04 W5N3 · 4 Nov 2026 · short notice no sign-off needed · WEB1885/26 · 184 m
      • Simmonscourt Road, Dublin 4, D04 A9K8 · 8 Oct 2026 · short notice no sign-off needed · 431 m
      • 14 Churchill Terrace, Dublin 4, D04 XD37 · 10 Sept 2026 · short notice no sign-off needed · WEB2134/26 · 256 m
      • 30 Gilford Park, Dublin 4, D04 KC58 · 28 Aug 2026 · start notice, opted out no sign-off needed · WEB1032/26 · 343 m
      • 11 Merlyn Road, Dublin 4, D04 T6D0 · 27 Jul 2026 · start notice, opted out no sign-off needed · WEB1851/26 · 416 m
      • 86 Wilfield Road, Dublin, Dublin 4, D04 X4H2 · 25 Jun 2026 · short notice no sign-off needed · WEB1093/26 · 201 m
      • 40 Saint John's, Sandymount, Dublin 4, D04 A8X7 · 16 Apr 2026 · start notice, opted out no sign-off needed · 3414/25 · 462 m
      • 40 Park Avenue, Sandymount, Dublin 4 · 5 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · WEB5174/25 · 471 m
      • 20 Wilfield Road, Dublin, Dublin 4, D04 AW81 · 26 Nov 2025 · short notice no sign-off needed · WEB2292/25 · 132 m
      • 18 Merlyn Road, Dublin, Dublin 4, D04 P084 · 30 Oct 2025 · 2 homes · start notice not signed off · 3069/24 · 458 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 26 Oct 2026, 01:57
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Estate: Shrewsbury · 4 applications in 10 years · most common: attic conversion / dormer

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Sandymount Avenue Apartments6969 built (2026-Q2)498 m
      Sandymount Avenue Residential Development69—498 m
      Sandymount Place67—498 m
      10 Pembroke Place and 36-38 Herbert Park103103 being built (2026-Q2)867 m
      Baggotrath House2222 being built (2026-Q2)897 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Enable Ireland Little Pals Preschool · Crèche16 Sept 2024 · report · Tusla Early Years Inspectorate200 m
      Eco Kidz Park Avenue · Crèche19 Mar 2026 · report · Tusla Early Years Inspectorate522 m
      Gilford Montessori School Limited · Crèche11 Sept 2024 · report · Tusla Early Years Inspectorate624 m
      Park Montessori · Crèche17 Jun 2026 · report · Tusla Early Years Inspectorate765 m
      St. Michael's College Pre-School · Crèche7 May 2026 · report · Tusla Early Years Inspectorate777 m
      Sandymount Green Montessori · Crèche10 Apr 2024 · report · Tusla Early Years Inspectorate936 m
      Eco Kidz Sandymount · Crèche6 Oct 2025 · report · Tusla Early Years Inspectorate970 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 26 Oct 2026, 23:00
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
      Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026, 20:18open
      National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Tusla early years registerPublic register21 Oct 2026, 23:37open
      How busy is this area Busier than most of Dublin City Council.
      Homes approved
      Here91
      Council middle52
      Homes started
      Here215
      Council middle116
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
      National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      7% of homes built before 1971 (council 52%). 31% owner-occupied (council 47%).

      Homes built before 1971
      7% · council 52%
      Homes built since 2001
      7% · council 19%
      Owner-occupied
      31% · council 47%
      Rented
      55% · council 45%
      Children under 15
      11% · council 15%
      Aged 65 and over
      10% · council 13%
      Households with 2+ cars
      33% · council 19%
      Work mainly from home
      17% · council 12%
      This small area (233 people)Dublin

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268114016

      Bus
      194 m
      Shrewsbury Road · 27X, 4, 7 · busiest stop within 500 m: 12 an hour at peak
      Planned
      935 m
      BusConnects Core Bus Corridors, Merrion to Blackrock
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Flood
      Yes
      OPW flood map area within 100 m
      Nearest school
      432 m
      Enable Ireland Sandymount School, 49 pupils
      Homes sold nearby
      66
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • Enable Ireland Sandymount School · primary · 49 pupils · 432 m
      • Scoil Mhuire · primary · 286 pupils · 581 m
      • St Michaels College · postprimary · 731 pupils · 775 m
      • Shellybanks Educate Together National School · primary · 333 pupils · 865 m
      • Marian College · postprimary · 318 pupils · 903 m
      • Sandymount Park Educate Together Secondary School · postprimary · 437 pupils · 917 m

      Stops 45

      • Shrewsbury Road · 27X, 4, 7, 7A · 8/hour at peak · 194 m
      • Sandymount Avenue · S2 · 4/hour at peak · 197 m
      • Sandymount · DART · 12/hour at peak · 202 m
      • Sandymount Station · S2 · 4/hour at peak · 212 m
      • British Embassy · 27X, 4, 511, 7, 702, 7A · 9/hour at peak · 222 m
      • Shrewsbury Park · 27X, 4, 511, 7, 7A, 7n · 9/hour at peak · 233 m
      • Sandymount Station · S2 · 4/hour at peak · 237 m
      • British Embassy · 27X, 4, 511, 7, 702, 7A · 9/hour at peak · 257 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Enable Ireland Sandymount School · 432 m+6.5% pupils (49)
      • Scoil Mhuire · 581 m+3.2% pupils (286)
      • St Michaels College · 775 m+0.7% pupils (731) · a pitch or play area 2025, no decision yet
      • Shellybanks Educate Together National School · 865 m-2.6% pupils (333) · 12 classrooms 2024, approved
      • Marian College · 903 m+4.3% pupils (318)
      • Sandymount Park Educate Together Secondary School · 917 m+0.2% pupils (437) · 12 classrooms 2024, approved

      Open consultations

      Council meetings 19 items

      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 26 Oct 2026, 01:54
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
      Council consultation portalsPublic26 Oct 2026, 00:55open
      Council meetings (ModernGov)Public26 Oct 2026, 01:54open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Flood risk area within 100 m: can you insure it?
        Ask for: A flood-cover quote before sale agreed.
        Insurer
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Electoral division
      Pembroke East E
      Electoral area
      Pembroke
      Council
      Dublin City Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax; flood risk area within 100 m.
      • 1 site nearby could change: 1 derelict.
      • Park Avenue (bus 47, 84n) 385 m away: 15 an hour at morning peak; 119 from all stops within 500 m. Planned: BusConnects Core Bus Corridors 935 m away, core bus corridor (DLR County Development Plan 2022-2028).
      • Here (2022 census): 55% rent (council 45%); 9% of homes empty (council 8%); most built 1981–1990; 26% drive to work (council 28%).
      • 5 home extensions within 250 m since 2025. Most were dormers or attic conversions.
      • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
      • 3 appeals nearby decided in the last 12 months; 3 overturned an approval.
      • Homes started within 1 km: 8 in the last year, 13 three years before.
      What the terms mean 8 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
      • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 30
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.026 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public26 Oct 2026
      www2.courts.ie—© the publisher26 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public26 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.026 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence26 Oct 2026
      data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 26 Oct 2026, 23:30 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.