PlanningRegister.ie
Planning report · Dublin City Council · 500 m around the house · the last 12 months · 24 Oct 2026, 10:46

Kickham Road

53.33763, -6.31014

Homes here mostly date from 1919–1945. Home extensions nearby almost always get approved (94%). 1 application nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Kickham RoadBuilt: most homes in this small area date from 1919–1945 (census estimate)most built2021: 1 file on Kickham Road2022: 2 files on Kickham Road2024: 2 files on Kickham Road2025: 1 file on Kickham Road6 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Natural heritage areas1Grand Canal
Heritage inventory buildings26Kilmainham Gaol; Kilmainham Courthouse
Radon grid squares2
Monuments7Water mill - unclassified; Bridge
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 2 on the draft 2027 map; 2 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), Natural Heritage Areas (NPWS), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 85–100% by type. A new house in a garden is harder: 63% approved, and 1 in 3 is asked for more information.

Single-storey rear54 decided · more info asked 7%
100% · council 97%
Two-storey rear61 decided · more info asked 8%
95% · council 96%
Two-storey side19 decided · more info asked 21%
95% · council 98%
Attic or dormer96 decided · more info asked 7%
95% · council 96%
First-floor20 decided · more info asked 10%
85% · council 94%
New house in a garden or site27 decided · more info asked 33%
63% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 277 nearby, 5,225 council-wide

Figure 3

Kickham Road, file by file since 2021

3 of 3 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

6 planning files on Kickham Road since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 19 · 2021 · two-storey rear · approved · 3199/21No. 106 · 2024 · two-storey rear · approved · 3296/24No. 69 · 2025 · attic conversion / dormer · approved · WEB1803/25Porches, roofs, otherNo. 119 · 2022 · other work · approved · 4694/22No. 19 · 2022 · two-storey side · approved · WEB1224/22New house in a side gardenNo. 39 · 2024 · new house · approved · WEB1088/2439
ApprovedRefusedWithdrawn or invalid

6 files with "Kickham Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

2 no decision or withdrawn
KindAppliedApprovedRefused
Two-storey rear20—

On Bulfin Estate: 72 extensions in 10 years, 90% of all applications approved; most common two-storey rear.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 24 Oct 2026, 02:29
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 9 is asked for more information, which adds about 87 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 9): 146 days; Appeal window: 4 weeks; If appealed: +139 days; Building starts: 120 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=280)55 daysIf more info asked (1 in 9)With further information: median 146 days (n=33)146 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 139 days (n=83, all appeals within 1.5 km)+139 daysBuilding startsStart notice: median 120 days after permission (n=99)120 days after permissionSigned off190 days after the start, for the few who file. 42% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated313 decided home extensions, 101 start notices, 83 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    11 of 50 appealed refusals became permissions. 3 of 36 appealed approvals were reversed.

    Refusals appealed50 decided
    11 became permissions
    Approvals appealed36 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Kickham Road with 15 numbered planning items
    ⌖ the houseOpen for commentsDerelict buildingBuilding startedEmpty land zoned for homesNo decision yetApproved
    1. 1172 Lally Road, Kilmainham WEB3443/26No decision yet · 478 m
    2. 2; ; DS1105Derelict building · 458 m
    3. 3492 Mourne Road Dublin 12 D12NA71 DS1693Derelict building · 459 m
    4. 4144 Benmadigan Road Dublin 12 D12ED90 DS2105Derelict building · 475 m
    5. 5646 South Circular Road, Dublin 8; 648 South Circular Road DS1581Derelict building · 477 m
    6. 625 O'Leary Road, Dublin 8 WEB5461/25Building started · 135 m
    7. 70.8 ha zoned for homesEmpty land zoned for homes · 299 m
    8. 80.1 ha zoned for homesEmpty land zoned for homes · 342 m
    9. 942 Southern Cross Avenue, Inchicore WEB2785/26No decision yet · 197 m
    10. 1010, Luby Road WEB1726/26Approved · 255 m
    11. 1130 Bulfin Gardens, Inchicore WEB5950/25Approved · 256 m
    12. 1219, Goldenbridge Terrace WEB1950/26Approved · 256 m
    13. 13The Davitt, Drimnagh WEB2629/26No decision yet · 279 m
    14. 1439 Connolly Gardens, Inchicore WEB1894/26Approved · 281 m
    15. 1518, Emmet Road WEB6036/25Approved · 304 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 72 permissions since 2016, 20 show a start notice and 2 have a completion certificate.

    106 applications lodged within 500 m. Council: 69 approved, 13 refused. After appeals: 72 approved. Of those: 2 signed off, 8 built with the owner's opt-out, 10 started, 52 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT69: lodged → approved13: lodged → refused19: lodged → withdrawn or invalid5: lodged → undecided69: approved → approved10: refused → refused19: withdrawn or invalid → withdrawn5: undecided → undecided3 refused by the council, approved after an appeal52: approved → no start notice found8: approved → built, owner opted out10: approved → started, not signed off2: approved → signed off106 lodged106 lodged69 approved69 approved13 refused13 refused19 withdrawn or invalid19 withdrawn or invalid5 undecided5 undecided72 approved72 approved10 refused10 refused19 withdrawn19 withdrawn5 undecided5 undecided52 no start notice found52 no start notice found8 built, owner opted out8 built, owner opted out10 started, not signed off10 started, not signed off2 signed off2 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured106 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 30 Oct 2026.

    2 deadlines in the next 30 days: 2026-10-30 WEB2987/26: GRANT PERMISSION — A 11m2 single storey extension to the rear to house a utility room, and ancillary works including; new solar panels to t; 2026-11-09 WEB3443/26: application received — RETENTION & PERMISSION; The development will consist/consists of 1. Permission for proposed front (5msq) and Rear (32msqtoday29 Oct3 Nov8 Nov13 Nov18 Nov23 NovWEB2987/26: GRANT PERMISSION — A 11m2 single storey extension to the rear to house a utility room, and ancillary works including; new solar panels to t · 478 m away · 2026-10-30WEB3443/26: application received — RETENTION & PERMISSION; The development will consist/consists of 1. Permission for proposed front (5msq) and Rear (32msq · 478 m away · 2026-11-09
    Comments closeTime to appeal ends
    • Time to appeal ends 30 Oct 20266 days left
      WEB2987/26 · GRANT PERMISSION — A 11m2 single storey extension to the rear to house a utility room, and ancillary works including;…
      €220 to An Coimisiún Pleanála (€110 observer) · 478 m away
    • Comments close 9 Nov 202616 days left
      1WEB3443/26 · application received — RETENTION & PERMISSION; The development will consist/consists of 1. Permission for proposed…
      €20 to the council · 478 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    DART+ South West is planned 607 m away.

    DART+ South West, DART+ South…: railway order granted (13 November 2024)20242025202620272028DART+ South West, DART+ South…607 m · plannedrailway order granted (13 November 2024)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 6 within 500 m

    Derelict building 4

    • 2; ; · derelict since May 2023 · 458 m
    • 3492 Mourne Road Dublin 12 D12NA71 · derelict since Mar 2026 · 459 m
    • 4144 Benmadigan Road Dublin 12 D12ED90 · derelict since Jun 2025 · 475 m
    • 5646 South Circular Road, Dublin 8; 648 South Circular Road · derelict since Jul 2024 · 477 m

    Empty land zoned for homes 2

    • 70.8 ha zoned for homes · no homes built on it yet · 299 m
    • 80.1 ha zoned for homes · no homes built on it yet · 342 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 24 Oct 2026, 02:46
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    Council meetings (ModernGov)Public24 Oct 2026, 02:46open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 9

    Applications within 500 m, by year

    Between 12 and 24 a year; busiest 2025. 84% of decisions were approvals.

    2021: 11, 2022: 23, 2023: 12, 2024: 16, 2025: 24, 2026: 2001020302021: 7 approved2021: 4 refused11’21*2022: 16 approved2022: 6 refused2022: 1 undecided23’222023: 12 approved12’232024: 14 approved2024: 1 refused2024: 1 withdrawn or invalid16’242025: 12 approved2025: 2 refused2025: 10 withdrawn or invalid24’252026: 8 approved2026: 8 withdrawn or invalid2026: 4 undecided20’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 27 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    Building work nearby 7 in the last 12 months
    3 not signed off4 no sign-off needed
    • 279 Mourne Road, Dublin, Dublin 12, D12 EW95 · 24 Aug 2026 · start notice, opted out no sign-off needed · WEB2573/25 · 478 m
    • 625 O'Leary Road, Dublin 8, D08 XE7C · 9 Jun 2026 · short notice no sign-off needed · WEB5461/25 · 135 m
    • 4 Saint Helen's Terrace, Inchicore, Dublin 8, D08 ENW2 · 18 May 2026 · short notice no sign-off needed · WEB2605/25 · 290 m
    • 97 Emmet Road, Inchicore, Dublin 8, D08 FF97 · 15 Apr 2026 · 1 homes · start notice not signed off · 436 m
    • Emmet Road, Inchicore, Dublin 8, Dublin, Dublin 8 · 6 Feb 2026 · 7-day notice not signed off · ABP-314791-22 · 478 m
    • Emmet Road, Inchicore, Dublin 8, Dublin 08, Dublin 8 · 2 Feb 2026 · 487 homes · start notice not signed off · ABP-314791-22 · 491 m
    • 24 Suir Road, Dublin, Dublin 8, D08 X3C3 · 3 Nov 2025 · short notice no sign-off needed · 147 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Bulfin Estate · 97 applications in 10 years · 90% approved · most common: two-storey rear

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Former Heidelberg/Miller Building and S.C.R Garage188188 built (2025-Q4)158 m
    Oscar House26no activity on site reported (2025-Q2)251 m
    Emmet Road578487 being built · 91 not started (2026-Q2)385 m
    Former Fodhla Printing Works3—596 m
    Former Irish Cone and Wafer Factory65— (2026-Q1)614 m
    47-53 Keeper Road53—730 m
    Former G4S Site113113 not started (2026-Q2)778 m
    Bright Ford Rialto6060 not started (2026-Q2)916 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    St Matthews Playgroup · Crèche13 Oct 2025 · report · Tusla Early Years Inspectorateapprox. 234 m
    Inchicore CDT Children's Project · Crèche3 Nov 2025 · report · Tusla Early Years Inspectorate522 m
    Safari Childcare Kilmainham · Crèche19 Aug 2025 · report · Tusla Early Years Inspectorate530 m
    Mayfield Montessori · Crèche10 Dec 2024 · report · Tusla Early Years Inspectorate558 m
    Forget-me-not Montessori School · Crèche24 Feb 2026 · report · Tusla Early Years Inspectorate606 m
    Naíonra Bogha Baistí · Crèche17 Nov 2025 · report · Tusla Early Years Inspectorate721 m
    Best Start Childcare Brickfield · Crèche10 Dec 2025 · report · Tusla Early Years Inspectorate875 m
    Safari Childcare · Crèche24 Mar 2026 · report · Tusla Early Years Inspectorate942 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 24 Oct 2026, 02:29
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.019 Oct 2026, 23:03open
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026, 20:18open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here93
    Council middle63
    Homes started
    Here696
    Council middle125
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    92% of homes built before 1971 (council 52%). 73% owner-occupied (council 47%).

    Homes built before 1971
    92% · council 52%
    Homes built since 2001
    3% · council 19%
    Owner-occupied
    73% · council 47%
    Rented
    26% · council 45%
    Children under 15
    15% · council 15%
    Aged 65 and over
    15% · council 13%
    Households with 2+ cars
    20% · council 19%
    Work mainly from home
    11% · council 12%
    This small area (313 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268085018

    Rail noise
    45–49 dB
    day–night average (EPA 2022)
    Bus
    56 m
    Goldenbridge Ave · 68, 68A · busiest stop within 500 m: 20 an hour at peak
    Planned
    607 m
    DART+ South West, DART+ South West: Hazelhatch and Celbridge - Dublin Heuston
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    606 m
    Goldenbridge Convent, 188 pupils
    Homes sold nearby
    83
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Goldenbridge Convent · primary · 188 pupils · 606 m
    • St John Of God Sp Sch · primary · 86 pupils · 700 m
    • Gaelscoil Inse Chor · primary · 209 pupils · 722 m
    • Inchicore Ns · primary · 201 pupils · 784 m
    • Mercy Secondary School · postprimary · 349 pupils · 796 m
    • Our Lady Of Good Counsel School · primary · 125 pupils · 898 m
    • Lady Of Good Counsel Boys Senior Ns · primary · 120 pupils · 932 m
    • Our Lady Of Mercy Secondary School · postprimary · 289 pupils · 958 m

    Stops 77

    • Goldenbridge Ave · 68, 68A · 1/hour at peak · 56 m
    • Stephens Road · 68, 68A · 1/hour at peak · 127 m
    • Suir Road · 73 · 5/hour at peak · 172 m
    • Suir Rd N · 68, 68A, 73 · 6/hour at peak · 202 m
    • Suir Road · Red · 20/hour at peak · 221 m
    • Suir Road · Red · 17/hour at peak · 226 m
    • Bulfin Gardens · 68, 68A · 2/hour at peak · 229 m
    • Bulfin Road · 68, 68A · 2/hour at peak · 253 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Goldenbridge Convent · 606 m-1.6% pupils (188)
    • St John Of God Sp Sch · 700 m0% pupils (86)
    • Gaelscoil Inse Chor · 722 m+0.5% pupils (209)
    • Inchicore Ns · 784 m-3.4% pupils (201)
    • Mercy Secondary School · 796 m+6.4% pupils (349)
    • Our Lady Of Good Counsel School · 898 m+3.3% pupils (125)

    Open consultations

    Council meetings 21 items

    Public land

    • Dublin City Council · 0.45 ha · 157 m
    • Dublin City Council · 3.17 ha · 186 m
    • Dublin City Council · 0.54 ha · 257 m
    • Dublin City Council · 1.22 ha · 308 m
    • Waterways Ireland · 0.13 ha · 317 m
    • Waterways Ireland · 0.29 ha · 358 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 24 Oct 2026, 02:46
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Council consultation portalsPublic24 Oct 2026, 01:49open
    Council meetings (ModernGov)Public24 Oct 2026, 02:46open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Application 478 m away open for comments until 9 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Kilmainham C
    Electoral area
    South West Inner City
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 6 sites nearby could change: 4 derelict, 2 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 9 Nov 2026.
    • Suir Road (Luas Red) 221 m away: 20 an hour at morning peak; 223 from all stops within 500 m. Planned: DART+ South West 607 m away, railway order granted (13 November 2024).
    • Noise from rail mapped at 45–49 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 73% owner-occupied (council 47%); 1% of homes empty (council 8%); most built 1919–1945; 36% drive to work (council 28%); population down 4% since 2016.
    • 2 home extensions within 250 m since 2026. Most were two-storey rear extensions. On Bulfin Estate: 72 in 10 years, 90% approved.
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 32
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.024 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public24 Oct 2026
    www2.courts.ie—© the publisher23 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.019 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public24 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.024 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence24 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 24 Oct 2026, 10:46 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.