Bright Ford Rialto
60 apartments6 storeysLidl Ireland GmbHHerberton Road, Dublin City Council
- 10 May 2022Received
- 18 Nov 2022Grant permission
- 12 Dec 2022Appealed
- 18 Jul 2024Appeal: Granted with conditions
- 18 Jul 2024Final grant
- Status
- Appeal decided — granted
- Decision
- Grant permission · 18 Nov 2022
- Size
- 60 apartments · up to 6 storeys
- Uses
- retail, residential, apartments
- Applicant
- Lidl Ireland GmbH
- Site
- 4,514 m²
- Appeal
- ACP 315314 · Granted with conditions
Building progress as the Dublin councils report it, Q2 2026
60 homes permitted; building has not started (Q2 2026).
completed · under construction · not started · 0 houses and 60 apartments permitted
Quarter by quarter
| Quarter | Permitted | Under construction | Completed | Completed share |
|---|---|---|---|---|
| Q2 2025 | 60 | 0 | 0 | |
| Q3 2025 | 60 | 0 | 0 | |
| Q4 2025 | 60 | 0 | 0 | |
| Q1 2026 | 60 | 0 | 0 | |
| Q2 2026 | 60 | 0 | 0 |
The scheme
Lidl Ireland GmbH proposes a mixed-use development at Bright Ford Rialto on Herberton Road. The project involves demolishing existing buildings to construct a supermarket, three retail units, and 60 residential apartments. The development includes a landscaped podium courtyard and an undercroft car park.
it involves the construction of 60 residential apartments and a supermarket
What the register says
Planning permission for development at this site (0.45 ha) at lands known as Bright Ford Rialto, Herberton Road, Dublin 12 (Eircode D12HT99). The proposed development will consist of the demolition of existing buildings on site (1,316 sq.m gross floor area) and the construction of a mixed use retail/commercial and residential development totalling 9,177sq.m gross floor area comprising a supermarket with ancillary off-licence and bakery and associated circulation, storage, staff accommodation, canteen, toilets, shower facilities, deliveries room and ESB substation totalling 2,811 sq.m gross floor area (of which 1,463 sq.m is net retail sales area), 3 no. ground floor independent retail/commercial units of 181 sq.m including a mezzanine, 194 sq.m and 82 sq.m and 60 no. residential apartments on 4 levels (Levels 1M, 2, 3 and 4) comprising 30 no. one-bedroom units, 29 no. two-bed units and 1 no. three bed unit and all associated private amenity space, circulation, lift and stair cores and escape stairs. The supermarket is located at first floor level over an undercroft car park with access gained via travellators located in the entrance lobby at street level fronting Herberton Road. The proposed development also comprises communal amenity space in the form of a landscaped podium level courtyard (610 sq.m) located at second floor level. Access to the apartment units is gained via 3no. entrance points one of which is located on the north eastern corner of the building fronting Herberton Road and two remaining entrances are located on the southern elevation addressing the new internal access road. The ground floor level includes ancillary residential accommodation including entrance lobbies, bin store and cycle stores and other ancillary uses. Vehicular access to serve the proposed development will be provided via a new entrance from Herberton Road located at the south eastern boundary of the site. The supermarket is serviced by an external delivery/service area and dock leveller located at the north western corner of the building. The development is serviced by a surface level undercroft car park containing 56 no. car parking spaces. 14 no. surface car parking spaces are provided on the internal access road. 128 no. cycle parking spaces are proposed within secure designated storage areas and surface cycle parking as part of the development. The proposed building is a 6 storey equivalent structure (4 floors of residential over commercial). Permission is also sought for public lighting, signage, hard and soft landscaping, boundary treatment and all ancillary and associated site development works
On this list because it is 20 homes or more on the Dublin councils' housing pipeline. Name and summary derived from the register record on 27 Sept 2026; the facts are the council's.
Planning timeline 6 steps
- 10 May 2022Application lodged — Standard
- 18 Nov 2022Council decision — Grant
- 14 Dec 2022Appealed to An Coimisiún Pleanála — ABP-315314-22
- 18 Jul 2024Commission decision — Granted
- 18 Jul 2024Final grant of permission
- 31 Aug 2029Permission expires (estimate) — Estimated permission expiry
The site 4,514 m²
Boundary of Bright Ford Rialto as the Dublin councils map it in the housing pipeline.
Planning applications inside the site 1 application in the last 10 years
Appeals inside the site 1 with An Coimisiún Pleanála
Full planning report for 53.33249, -6.29858
Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.
No account, no payment. Not a statutory planning search.
Other big developments nearby within 2 km
- Dolphin Park · 161 homes · 6 storeys · 246 m away
- Dolphin Park · 161 homes · 6 storeys · 246 m away
- Dolphin Park · 161 homes · 6 storeys · 246 m away
- 47-53 Keeper Road · 53 homes · 6 storeys · 275 m away
- Former Fodhla Printing Works · 3 homes · 862 m away
- Former Fodhla Printing Works · 79 homes · 6 storeys · 862 m away
- 726 South Circular Road · 53 homes · 5 storeys · 965 m away
- Former Irish Cone and Wafer Factory · 65 homes · 7 storeys · 992 m away
Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.