G5 — Open space and amenitydevelopment plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
Z9: Amenity/Open Space Lands/Green Network: To preserve, provide and improve recreational amenity, open space and ecosystem services.
What that means: Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.
RETENTION: Reinstatement of boundary wall to rear of site, bordering Camac River, including new foundation to support masonry wall with concrete capping built up to garden level in place of original collapsed stone wall.
RETENTION: Reinstatement of boundary wall to rear of site, bordering Camac River, including new foundation to support masonry wall with concrete capping built up to garden level in place of original collapsed stone wall.
WEB2523/26received 18 Jun 2026decided 18 Jun 2026271 m away
(i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operation of the new National Children’s Hospital with associated internal alterations to facilitate revised layout providing for 8 no. ensuite bedrooms each with access to shared facilities including kitchen/dining area, living area, storage/service area, linen store and existing roof terrace all at first floor level; (ii) partial change of use of basement-floor level storage area to provide shared laundry/storage room in association with limited-term staff accommodation use and re-designation of the separate entrance foyer at ground floor level to serve the limited-term staff accommodation use; and, (iii) all associated works, including drainage works, engineering works and installation of new boiler cabinet, as necessary to facilitate the development.
(i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operation of the new National Children’s Hospital with associated internal alterations to facilitate revised layout providing for 8 no. ensuite bedrooms each with access to shared facilities including kitchen/dining area, living area, storage/service area, linen store and existing roof terrace all at first floor level;
(ii) partial change of use of basement-floor level storage area to provide shared laundry/storage room in association with limited-term staff accommodation use and re-designation of the separate entrance foyer at ground floor level to serve the limited-term staff accommodation use; and,
(iii) all associated works, including drainage works, engineering works and installation of new boiler cabinet, as necessary to facilitate the development.
WEB2408/26received 9 Jun 2026decided 10 Jun 2026307 m away
(i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operation of the new National Children’s Hospital with associated internal alterations to facilitate revised layout providing for 8 no. ensuite bedrooms each with access to shared facilities including kitchen/dining area, living area, storage/service area, linen store and existing roof terrace all at first floor level; (ii) partial change of use of basement-floor level storage area to provide shared laundry/storage room in association with limited-term staff accommodation use and re-designation of the separate entrance foyer at ground floor level to serve the limited-term staff accommodation use; and, (iii) all associated works, including drainage works, engineering works and installation of new boiler cabinet, as necessary to facilitate the development.
WEB2379/26received 5 Jun 2026decided 8 Jun 2026307 m away
The development will consist of a two storey extension to the rear of the existing house, including internal alterations, a new rooflight to the existing rear pitch of the roof and all ancillary works.
WEB2114/26received 7 May 2026decided 7 May 2026458 m away
RETENTION: 10 square metres single storey kitchen extension with pitch roof with two Velux roof windows incorporated. All to the rear of the existing two storey dwelling.
WEB1759/26received 2 Apr 2026decided 2 Apr 2026436 m away
Abbey Building Contractors Limited intend to apply for planning permission on lands located at the junction of Irwin Court and Irwin Street, Kilmainham, Dublin 8. The proposed residential development will consist of the construction of a 5-storey apartment block comprising 27 no. apartments (13 no. 1-bed units and 14 no. 2-bed units) with balconies to all elevations; store room, bin store, bike store (comprising a total of 58 spaces) at ground level; plant room at first floor level; and communal open space in the form of roof terraces at fourth floor level and roof levels; along with all associated site development and infrastructural works necessary to facilitate the proposed development.
WEB6015/25received 17 Dec 2025decided 18 Feb 202627 units245 m away
Abbey Building Contractors Limited intend to apply for planning permission on lands located at the junction of Irwin Court and Irwin Street, Kilmainham, Dublin 8, D08 H1W6. The proposed residential development will consist of the construction of a 5-storey apartment block comprising 27 no. apartments (13 no. 1-bed units and 14 no. 2-bed units) with balconies to all elevations; store room, bin store, bike store (comprising a total of 58 spaces) at ground level; plant room at first floor level; and communal open space in the form of roof terraces at fourth floor level and roof levels; along with all associated site development and infrastructural works necessary to facilitate the proposed development.
WEB5939/25received 11 Dec 2025decided 15 Dec 2025245 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 25 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
Irish Museum of Modern Art — Dublin city and suburbs
16.97 ha0 m awayas of 1 Apr 2023
Electricity Supply Board — Dublin city and suburbs
0.14 hafolio DN184731F72 m awayas of 1 Apr 2023
Córas Iompair Éireann — Dublin city and suburbs
12.87 ha123 m awayas of 1 Apr 2023
Health Service Executive — Dublin city and suburbs
0.26 hafolio DN126294F294 m awayas of 1 Apr 2023
The Office of Public Works — Dublin city and suburbs
0.46 ha334 m awayas of 1 Apr 2023
Health Service Executive — Dublin city and suburbs
0.28 hafolio DN64397F357 m awayas of 1 Apr 2023
Health Service Executive — Dublin city and suburbs
18.16 ha357 m awayas of 1 Apr 2023
Health Service Executive — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 19:14 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.