G5 — Open space and amenitydevelopment plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
Z9: Amenity/Open Space Lands/Green Network: To preserve, provide and improve recreational amenity, open space and ecosystem services.
What that means: Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.
RETENTION: Reinstatement of boundary wall to rear of site, bordering Camac River, including new foundation to support masonry wall with concrete capping built up to garden level in place of original collapsed stone wall.
RETENTION: Reinstatement of boundary wall to rear of site, bordering Camac River, including new foundation to support masonry wall with concrete capping built up to garden level in place of original collapsed stone wall.
WEB2523/26received 18 Jun 2026decided 18 Jun 2026271 m away
(i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operation of the new National Children’s Hospital with associated internal alterations to facilitate revised layout providing for 8 no. ensuite bedrooms each with access to shared facilities including kitchen/dining area, living area, storage/service area, linen store and existing roof terrace all at first floor level; (ii) partial change of use of basement-floor level storage area to provide shared laundry/storage room in association with limited-term staff accommodation use and re-designation of the separate entrance foyer at ground floor level to serve the limited-term staff accommodation use; and, (iii) all associated works, including drainage works, engineering works and installation of new boiler cabinet, as necessary to facilitate the development.
(i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operation of the new National Children’s Hospital with associated internal alterations to facilitate revised layout providing for 8 no. ensuite bedrooms each with access to shared facilities including kitchen/dining area, living area, storage/service area, linen store and existing roof terrace all at first floor level;
(ii) partial change of use of basement-floor level storage area to provide shared laundry/storage room in association with limited-term staff accommodation use and re-designation of the separate entrance foyer at ground floor level to serve the limited-term staff accommodation use; and,
(iii) all associated works, including drainage works, engineering works and installation of new boiler cabinet, as necessary to facilitate the development.
WEB2408/26received 9 Jun 2026decided 10 Jun 2026307 m away
(i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operation of the new National Children’s Hospital with associated internal alterations to facilitate revised layout providing for 8 no. ensuite bedrooms each with access to shared facilities including kitchen/dining area, living area, storage/service area, linen store and existing roof terrace all at first floor level; (ii) partial change of use of basement-floor level storage area to provide shared laundry/storage room in association with limited-term staff accommodation use and re-designation of the separate entrance foyer at ground floor level to serve the limited-term staff accommodation use; and, (iii) all associated works, including drainage works, engineering works and installation of new boiler cabinet, as necessary to facilitate the development.
WEB2379/26received 5 Jun 2026decided 8 Jun 2026307 m away
The development will consist of a two storey extension to the rear of the existing house, including internal alterations, a new rooflight to the existing rear pitch of the roof and all ancillary works.
WEB2114/26received 7 May 2026decided 7 May 2026458 m away
RETENTION: 10 square metres single storey kitchen extension with pitch roof with two Velux roof windows incorporated. All to the rear of the existing two storey dwelling.
WEB1759/26received 2 Apr 2026decided 2 Apr 2026436 m away
Planning permission is sought by Baskin Projects Limited for the amendment to Planning Ref No. 5400/22 for the previous approved six storey 13 No. apartment development to a revised development consisting of 14 No. apartments (11 No. one-bed, 2 No. two-bed & 1 No. three bed) with associated minor amendments to all elevations & the approved layouts of the associated balconies/terraces, the provision of 3 no. communal open space areas at ground level and on third floor and fourth floor terraces, ancillary areas for bicycle parking, refuse storage, apartment storage room, associated plant room at ground floor at 29 Bow Lane West, Dublin 8, D08V44T.
WEB1042/26received 9 Jan 2026decided 4 Mar 202614 units498 m away
Planning permission is sought by Baskin Projects Limited for the amendment to Planning Ref No. 5400/22 for the previous approved six storey 13 No. apartment development to a revised development consisting of 14 No. apartments (11 No. one-bed, 2 No. two-bed & 1 No. three bed) with associated minor amendments to all elevations & the approved layouts of the associated balconies/terraces, the provision of 3 no. communal open space areas at ground level and on third floor and fourth floor terraces, ancillary areas for bicycle parking, refuse storage, apartment storage room, associated plant room at ground floor at 29 Bow Lane West, Dublin 8, D08V44T.
WEB1021/26received 7 Jan 2026decided 9 Jan 2026498 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 27 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
Irish Museum of Modern Art — Dublin city and suburbs
16.97 ha0 m awayas of 1 Apr 2023
Electricity Supply Board — Dublin city and suburbs
0.14 hafolio DN184731F72 m awayas of 1 Apr 2023
Córas Iompair Éireann — Dublin city and suburbs
12.87 ha123 m awayas of 1 Apr 2023
Health Service Executive — Dublin city and suburbs
0.26 hafolio DN126294F294 m awayas of 1 Apr 2023
The Office of Public Works — Dublin city and suburbs
0.46 ha334 m awayas of 1 Apr 2023
Health Service Executive — Dublin city and suburbs
0.28 hafolio DN64397F357 m awayas of 1 Apr 2023
Health Service Executive — Dublin city and suburbs
18.16 ha357 m awayas of 1 Apr 2023
Health Service Executive — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 14 Sept 2026, 05:04 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.