Planning report · Dublin City Council · 500 m around the house · the last 12 months · 26 Oct 2026, 17:40

Arran Quay

53.34632, -6.27770

Homes here mostly date from before 1919. 1 planning file on this house, the latest from 2022. Home extensions nearby almost always get approved (91%). 10 homes approved 340 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 7 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed. 1 planning file on this house, the latest from 2022.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918. 1 planning file on this house.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Arran QuayBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2022: 3161/22 · driveway, approved2022: 1 file on Arran Quay2023: 1 file on Arran Quay2024: 1 file on Arran Quay2025: 2 files on Arran Quay5 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2022
    3161/22 · driveway · approved 2022 · not started, runs out 2027
    approvedstartedsigned off
On this site
M2
Zoning · Major town centre
Yes
Protected or listed · inside the zone around a recorded monument (DU018-020426-)
No
Vacant land tax · not on the map
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z5 - DEV PLAN 2022-2028

ZoningM2 · Major town centre
What it says

Z5: City Centre: To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

The main town centre — retail, offices, civic uses, apartments.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningM2 · Major town centre
What it says

Z5: City Centre: To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

The main town centre — retail, offices, civic uses, apartments.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Protected building10 within 100 m Presbytery (Catholic Youth Council); St. Paul's Church
Heritage inventory13 within 100 m Catholic Youth Care; Saint Paul's Roman Catholic Church
Monument zoneOn this site Quay; Chapel
Radon1 in 20 homes have high radon (EPA)

Not on this site: conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Diageo Ireland Unlimited Company (440 m)

Vacant land taxNo not on the map
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 500 mCountFor example
Licensed industrial sites4Diageo Ireland
Heritage inventory buildings245quay/wharf; Rory O'More Bridge
Radon grid squares1
Monuments230Mural tower (Historic Town)
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 23 on the draft 2027 map; 22 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA radon map, Sites and Monuments Record, SMR zones of notification, EPA licensed facilities (LEAP), Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), EPA licensed sites, OPW flood maps (CFRAM) · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
EPA licensed facilities (LEAP)CC BY 4.019 Oct 2026, 23:51open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 88–100% by type. A new house in a garden is harder: 74% approved, and 1 in 2 is asked for more information.

Single-storey rear81 decided · more info asked 11%
98% · council 97%
Two-storey rear56 decided · more info asked 7%
95% · council 96%
Single-storey side10 decided · more info asked 10%
100% · council 99%
Attic or dormer76 decided · more info asked 11%
88% · council 96%
First-floor33 decided · more info asked 24%
97% · council 94%
New house in a garden or site46 decided · more info asked 46%
74% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 302 nearby, 5,176 council-wide

Figure 3

Arran Quay, file by file since 2022

5 planning files on Arran Quay since 2022, by kind and decision.20222023202420252026Extensions, atticsPorches, roofs, otherNo number · 2022 · other work · approved · 3161/22No. 7 · 2023 · other work · approved · 4290/23No. 8A · 2024 · other work · approved · 4152/24No. 8A · 2025 · other work · withdrawn or invalid · WEB2778/25No. 8A · 2025 · other work · withdrawn or invalid · WEB2813/25New house in a side garden
ApprovedRefusedWithdrawn or invalid

5 files with "Arran Quay" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2022–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 80 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 141 days; Appeal window: 4 weeks; If appealed: +209 days; Building starts: 165 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=312)55 daysIf more info asked (1 in 6)With further information: median 141 days (n=61)141 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 209 days (n=207, all appeals within 1.5 km)+209 daysBuilding startsStart notice: median 165 days after permission (n=143)165 days after permissionSigned off444 days after the start, for the few who file. 35% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated373 decided home extensions, 147 start notices, 207 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    36 of 112 appealed refusals became permissions. 10 of 99 appealed approvals were reversed.

    Refusals appealed112 decided
    36 became permissions
    Approvals appealed99 decided
    10 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 6 in the last 12 months

    None of 2 changed the council's decision

    • 501390 Granted · Site at Thomas Street, including No. 144 Thomas Street (the site is… · 419 m
    • 501783 Pending · 50 Blackhall Place, 13/14 Hendrick Street, Oxmantown Lane, Dublin 7,… · 299 m
    • 501717 Pending · 1, Inns Court, Winetavern Street, Dublin 8, D08 W3P3 · 471 m
    • 500670 Granted · 13/14 Merchants Quay (Riverbank Building), Dublin 8 · 299 m report
    • 501338 Pending · 1-6 Beresford Street, Dublin 7, D7T611. The site is bounded by Cuckoo… · 327 m
    • 324129 Pending · Yard to rear of St. Catherines Church, Meath Street, Dublin 8, D08… · 445 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher25 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 4

    What's changing around you?

    Street map around Arran Quay with 15 numbered planning items
    ⌖ the houseOpen for commentsDerelict buildingApproved, not startedEmpty land zoned for homesApprovedNo decision yet
    1. 1Nos. 1, 1a WEB3397/26No decision yet · 173 m
    2. 239/40 BRIDGEFOOT STREET DUBLIN 8 D08T6F7 DS1363Derelict building · 239 m
    3. 3Usher's Island 4035/24Approved, no sign building has started · 340 m
    4. 40.4 ha zoned for homesEmpty land zoned for homes · 86 m
    5. 50.2 ha zoned for homesEmpty land zoned for homes · 294 m
    6. 60.2 ha zoned for homesEmpty land zoned for homes · 296 m
    7. 70.1 ha zoned for homesEmpty land zoned for homes · 369 m
    8. 80.2 ha zoned for homesEmpty land zoned for homes · 391 m
    9. 9Nos. 1, 1a WEB5595/25Approved · 100 m
    10. 10Light House Cinema, Smithfield 5225/26No decision yet · 177 m
    11. 11Merchants Court, 24 Merchant's Quay WEB2544/26No decision yet · 228 m
    12. 1213/14 Merchants Quay (Riverbank Building), Dublin 8 WEB5521/25Approved · 299 m
    13. 131-6 Beresford Street, Dublin 7 WEB5590/25Approved · 327 m
    14. 1413-18, Fegan's WEB1433/26Approved · 369 m
    15. 15Site of c.210 sq m at 3 Wood Lane, Dublin 7 WEB3085/26No decision yet · 377 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 129 permissions since 2016, 30 show a start notice and 15 have a completion certificate.

    182 applications lodged within 500 m. Council: 131 approved, 24 refused. After appeals: 129 approved. Of those: 15 signed off, 0 built with the owner's opt-out, 15 started, 99 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT131: lodged → approved24: lodged → refused19: lodged → withdrawn or invalid8: lodged → undecided125: approved → approved18: refused → refused19: withdrawn or invalid → withdrawn8: undecided → undecided1 approved by the council, undecided after an appeal3 approved by the council, refused after an appeal2 approved by the council, withdrawn or invalid after an appeal4 refused by the council, approved after an appeal1 refused by the council, undecided after an appeal1 refused by the council, withdrawn or invalid after an appeal99: approved → no start notice found15: approved → started, not signed off15: approved → signed off182 lodged182 lodged131 approved131 approved24 refused24 refused19 withdrawn or invalid19 withdrawn or invalid8 undecided8 undecided129 approved129 approved21 refused21 refused22 withdrawn22 withdrawn10 undecided10 undecided99 no start notice found99 no start notice found15 started, not signed off15 started, not signed off15 signed off15 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured182 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    3 deadlines within 500 m; the first closes 31 Oct 2026.

    3 deadlines in the next 30 days: 2026-10-31 DCC consultation opened: The Draft Markets Public Realm Plan (2026); 2026-11-03 WEB3397/26: application received — PI Hotels & Restaurants Ireland Ltd intends to apply for permission for development to amend a previously permitted hote; 2026-11-13 ACP 501390: Grant permissiontoday31 Oct5 Nov10 Nov15 Nov20 Nov25 NovDCC consultation opened: The Draft Markets Public Realm Plan (2026) · 177 m away · 2026-10-31WEB3397/26: application received — PI Hotels & Restaurants Ireland Ltd intends to apply for permission for development to amend a previously permitted hote · 173 m away · 2026-11-03ACP 501390: Grant permission · 419 m away · 2026-11-13
    Comments closeHigh Court window endsOther deadlines
    • Consultation closes 31 Oct 20265 days left
      The Draft Markets Public Realm Plan (2026)
      177 m away
    • Comments close 3 Nov 20268 days left
      1WEB3397/26 · application received — PI Hotels & Restaurants Ireland Ltd intends to apply for permission for development to amend a…
      €20 to the council · 173 m away
    • Time to ask the High Court for a review ends 13 Nov 202618 days left
      Grant permission
      419 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    10 homes 340 m away were approved May 2025 with no start notice yet; the permission runs to May 2030.

    Usher's Island · 10 homes: 10 homes approved May 2025, not started20242025202620272028202920302031Usher's Island · 10 homes340 m · 4035/2410 homes approved May 2025, not started10 homes approved May 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 15 within 500 m

    Derelict building 4

    • 239/40 BRIDGEFOOT STREET DUBLIN 8 D08T6F7 · derelict since Feb 2024 · 239 m
    • 86 King Street North Dublin 7 · derelict since Jul 2020 · 402 m
    • 1 Thomas Court Dublin 8; 2 Thomas Court Dublin 8; 3 Thomas Court Dublin 8 · derelict since Nov 2018 · 457 m
    • 37 Thomas Court Dublin 8 D08T2R7 · derelict since Feb 2016 · 460 m

    Approved, not started 1

    Empty land zoned for homes 10

    • 40.4 ha zoned for homes · no homes built on it yet · 86 m
    • 50.2 ha zoned for homes · no homes built on it yet · 294 m
    • 60.2 ha zoned for homes · no homes built on it yet · 296 m
    • 70.1 ha zoned for homes · no homes built on it yet · 369 m
    • 80.2 ha zoned for homes · no homes built on it yet · 391 m
    • 0.2 ha zoned for homes · no homes built on it yet · 403 m
    • 0.3 ha zoned for homes · no homes built on it yet · 413 m
    • 0.2 ha zoned for homes · no homes built on it yet · 447 m
    • 0.4 ha zoned for homes · no homes built on it yet · 451 m
    • 0.7 ha zoned for homes · no homes built on it yet · 460 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    Council meetings (ModernGov)Public26 Oct 2026, 01:54open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 28 and 39 a year; busiest 2024. 85% of decisions were approvals.

    2021: 26, 2022: 28, 2023: 37, 2024: 39, 2025: 35, 2026: 170102030402021: 22 approved2021: 3 refused2021: 1 undecided26’21*2022: 21 approved2022: 7 refused28’222023: 30 approved2023: 7 refused37’232024: 36 approved2024: 3 refused39’242025: 18 approved2025: 3 refused2025: 14 withdrawn or invalid35’252026: 4 approved2026: 1 refused2026: 5 withdrawn or invalid2026: 7 undecided17’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 22 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    Building work nearby 9 in the last 12 months
    3 signed off as finished5 not signed off1 no sign-off needed
    • 18 Chancery Street, Dublin 7 · 23 Sept 2026 · 7-day notice not signed off · WEB1433/26 · 387 m
    • 10 Usher's Island, Dublin, Dublin 8, D08 A586 · 26 May 2026 · 7-day notice not signed off · WEB1262/26 · 306 m
    • 56 King Street North, Dublin, Dublin 7, D07 FW72 · 13 May 2026 · 7-day notice not signed off · 4269/22 · 466 m
    • 29/30 Usher's Quay, Dublin, Dublin 8, D08 VYX7 · 9 Apr 2026 · 7-day notice not signed off · 2409/20 & ABP-308627-20 · 110 m
    • 54 Smithfield, Dublin, D07 CF98 · 6 Apr 2026 · start notice not signed off · WEB5317/25 · 132 m
    • 90 King Street North, Dublin, Dublin 7, D07 N7CV · 5 Feb 2026 · short notice no sign-off needed · 412 m
    • 135 Francis Street, Dublin, Dublin 8, D08 P5N2 · 28 Jan 2026 · start notice signed off · 463 m
    • 134 Sráid Thomáis Thiar, Dublin, Dublin 8, D08 T6H9 · 2 Dec 2025 · start notice signed off · WEB1948/25 · 407 m
    • 6-11 Hendrick Street, Smithfield D7, Dublin 7, D07 A8N1 · 3 Nov 2025 · start notice signed off · 276 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    Homes coming 10 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    1-6 Beresford Street189—327 m
    Fegan's, Chancery Street12—369 m
    9-13 Blackhall Place200—458 m
    Mary's Lane, Halston Street and Little Green Street Site64—485 m
    Brunswick Street North and Church Street Upper3333 not started (2026-Q2)487 m
    Guinness Brewery Lands336—525 m
    School Street and Thomas Court Bawn Estate124124 not started (2026-Q2)616 m
    Constitution Hill Flats12446 being built · 78 not started (2026-Q2)649 m

    Who applies most nearby

    • Your Home from Home Limited — 2 applications, latest 20 Aug 2026

    Crèches and schools inspected

    NameLatest inspectionDistance
    St. Audoen's Pre- school · Crèche10 Sept 2025 · report · Tusla Early Years Inspectorate283 m
    Little Stars Creche · Crèche27 Feb 2026 · report · Tusla Early Years Inspectorate396 m
    Christchurch Creche & Montessori School · Crèche3 Apr 2025 · report · Tusla Early Years Inspectorate463 m
    Dublin Waldorf School · Crèche17 Nov 2025 · report · Tusla Early Years Inspectorate559 m
    Rainbow Community Playgroup · Crèche12 Feb 2026 · report · Tusla Early Years Inspectorate597 m
    Rainbow Community Playgroup · Crèche25 Mar 2025 · report · Tusla Early Years Inspectorate597 m
    Pitter Patter Community Play Group · Crèche17 Feb 2026 · report · Tusla Early Years Inspectorate599 m
    Connolly Children's Centre · Crèche28 Jul 2025 · report · Tusla Early Years Inspectorate706 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list, Tusla early years register · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.019 Oct 2026, 23:03open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Applicant organisations (from the CRO)Derived by Planning Register25 Oct 2026, 23:01—
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here528
    Council middle52
    Homes started
    Here834
    Council middle116
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    38% of homes built before 1971 (council 52%). 11% owner-occupied (council 47%).

    Homes built before 1971
    38% · council 52%
    Homes built since 2001
    19% · council 19%
    Owner-occupied
    11% · council 47%
    Rented
    82% · council 45%
    Children under 15
    11% · council 15%
    Aged 65 and over
    3% · council 13%
    Households with 2+ cars
    1% · council 19%
    Work mainly from home
    9% · council 12%
    This small area (258 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268003015

    Road noise
    65–69 dB
    day–night average (EPA 2022)
    Bus
    46 m
    Arran Quay · 37, 39, 39A · busiest stop within 500 m: 44 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Yes
    OPW flood map area within 100 m
    Nearest school
    313 m
    St Audoens Ns, 171 pupils
    Homes sold nearby
    135
    in 3 years, 1 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St Audoens Ns · primary · 171 pupils · 313 m
    • Presentation Primary School · primary · 165 pupils · 452 m
    • Scoil Na Mbrathar Boys Senior School · primary · 120 pupils · 470 m
    • St Pauls C.B.S. · postprimary · 244 pupils · 494 m
    • Scoil na mBrathar · primary · 155 pupils · 612 m
    • An Cosan CSS · primary · 56 pupils · 637 m
    • Stanhope Street Primary School · primary · 384 pupils · 748 m
    • St Josephs Secondary School · postprimary · 283 pupils · 754 m

    Stops 92

    • Arran Quay · 37, 39, 39A, 4, 51D, 60 · 44/hour at peak · 46 m
    • Arran Quay · 52, C1, C2, C3, C4, C5 · 20/hour at peak · 65 m
    • Usher's Quay · 782, 845, 847, 860 · 2/hour at peak · 81 m
    • Smithfield · Red · 19/hour at peak · 92 m
    • Smithfield · Red · 20/hour at peak · 102 m
    • Usher's Quay · 37, 39, 39A, 4, 51D, 69 · 25/hour at peak · 126 m
    • Usher's Quay · 52, 60, C1, C2, C3, C4 · 11/hour at peak · 145 m
    • Church Street · 23, 24 · 6/hour at peak · 208 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Audoens Ns · 313 m-5.5% pupils (171)
    • Presentation Primary School · 452 m+8.6% pupils (165) · an extension 2025, approved
    • Scoil Na Mbrathar Boys Senior School · 470 m-7% pupils (120) · an extension 2025, approved
    • St Pauls C.B.S. · 493 m+11.4% pupils (244) · an extension 2025, approved
    • Scoil na mBrathar · 611 m-5.5% pupils (155)
    • An Cosan CSS · 637 m+93.1% pupils (56) · 14 classrooms 2024, approved

    Open consultations

    Council meetings 30 items

    Public land

    • The Office of Public Works · 0.34 ha · 86 m
    • The Office of Public Works · 0.12 ha · 130 m
    • The Office of Public Works · 0.14 ha · 164 m
    • The Minister for Justice and Equality · 2.22 ha · 165 m
    • Dublin City Council · 0.33 ha · 177 m
    • The Minister for Justice and Equality · 0.38 ha · 213 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 26 Oct 2026, 01:54
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Council consultation portalsPublic26 Oct 2026, 00:55open
    Council meetings (ModernGov)Public26 Oct 2026, 01:54open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Driveway (3161/22) approved 2022, not started: still planned?
      Ask for: The grant, and whether it stays with the house.
      Seller · solicitor
    2. Next to a recorded monument: does digging need notice?
      Ask for: Details of past works from the seller.
      Seller · council
    3. Flood risk area within 100 m: can you insure it?
      Ask for: A flood-cover quote before sale agreed.
      Insurer
    4. Application 173 m away open for comments until 3 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    5. Mapped at 65–69 dB from road traffic: will you hear it inside?
      Ask for: A visit at rush hour (and at night), and the windows' glazing specification.
      Visit at rush hour
    6. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Arran Quay C
    Electoral area
    North Inner City
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest 3161/22, approved 2022, not started, runs out 2027.
    • Zoned M2 (major town centre); monument zone; no vacant land tax; flood risk area within 100 m.
    • 15 sites nearby could change: 4 derelict, 1 approved scheme, 10 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 3 Nov 2026.
    • 10 homes approved nearby, not started; largest 10 at Usher's Island.
    • Arran Quay (bus 37, 39) 46 m away: 44 an hour at morning peak; 571 from all stops within 500 m.
    • Noise from road traffic mapped at 65–69 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 82% rent (council 45%); 3% of homes empty (council 8%); most built before 1919; 10% drive to work (council 28%); population up 4% since 2016.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 35
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.026 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public26 Oct 2026
    www2.courts.ie—© the publisher25 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.019 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.019 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public26 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.026 Oct 2026
    organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register25 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence26 Oct 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 26 Oct 2026, 17:40 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.