Caledon Road
Homes here mostly date from before 1919. Home extensions nearby almost always get approved (95%). 131 homes approved 101 m away haven't started.
How planning works, with this area's numbers
steps can overlap · medians for home extensions within 1.5 km, 10 years- 1ApplySite notice up, plans online
- 2Comments5 weeks, €20. Comment to keep your right to appeal
- 3Decision8 weeks by law. Here 55 days
- 4Appeal window4 weeks after the decision
- 5AppealHere about 5 months
- 6PermissionLasts 5 years
- 7StartStart notice to the council. Here about 3 months after
- 8Sign-offCompletion cert, or the owner opts out
What's the planning story of this house?
When it was built, and the rules since
Most homes here were built before 1919, before planning permission was needed.
Each line is a rule that applies to work done after it.
MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area
Zoning, protection, tax and flood: the detail
What it says
Zone Z2 - DEV PLAN 2022-2028
What it says
Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
What it says
Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028
Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.
Licensed industrial sites within 1.0 km: Dean Waste Company Ltd (Upper Sheriff Street) (319 m); Cahill Printers Limited (325 m); Brooks Thomas Limited (446 m)
| Within 500 m | Count | For example |
|---|---|---|
| Licensed industrial sites | 3 | Cahill Printers Limited; Brooks Thomas Limited |
| Natural heritage areas | 2 | North Dublin Bay; Royal Canal |
| Heritage inventory buildings | 4 | house; church/chapel |
| Radon grid squares | 1 |
How we work this out
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (NIFM), Natural Heritage Areas (NPWS), National Inventory of Architectural Heritage · fetched 19 Oct 2026, 00:29
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Development plan zoning (councils) | CC BY 4.0 | 18 Oct 2026, 23:24 | open |
| EPA licensed sites | CC BY 4.0 | 27 Sept 2026, 19:36 | open |
| EPA radon map | CC BY 4.0 | 27 Sept 2026, 19:36 | open |
| EPA licensed facilities (LEAP) | CC BY 4.0 | 12 Oct 2026, 23:31 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 19 Oct 2026, 00:29 | open |
| Constraint layers (bundle) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026, 19:37 | open |
| OPW flood maps (NIFM) | CC BY-NC-ND 4.0 · shown as a yes/no only | 11 Sept 2026, 19:11 | open |
| Natural Heritage Areas (NPWS) | CC BY 4.0 | 27 Sept 2026, 19:27 | open |
| National Inventory of Architectural Heritage | CC BY 4.0 | 27 Sept 2026, 19:35 | open |
How we work this out
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 19 Oct 2026, 01:33 | open |
| National Planning Application Database | CC BY 4.0 | 19 Oct 2026, 02:08 | open |
Could you extend?
Nothing on this site restricts it: not protected, not in a conservation area.
What happened to applications like yours
Extensions are almost always approved here: 91–97% by type. A new house in a garden is harder: 76% approved, and 1 in 2 is asked for more information.
Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.
CalculatedOur classificationcouncil register via NPAD · 303 nearby, 6,973 council-wide
Caledon Road, file by file since 2020
4 of 4 decided extensions on the road were approved.
4 files with "Caledon Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.
MeasuredOur classificationcouncil register via NPAD · 2020–2026
Extensions and refusals right beside you 8 within 250 m · 0 refused within 100 m
Extensions and refusals near you 8 extensions within 250 m · the last 12 months
| Kind | Applied | Approved | Refused |
|---|---|---|---|
| Single-storey rear | 6 | 0 | — |
| Dormer or attic | 1 | 1 | — |
| Porch | 1 | 0 | — |
Refused within 100 m 0 in the last 12 months
Nothing refused this close in the last 12 months.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 16 Oct 2026, 23:06 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 19 Oct 2026, 01:33 | open |
| National Planning Application Database | CC BY 4.0 | 19 Oct 2026, 02:08 | open |
How long, and what if someone objects?
A home extension's journey here
A decision takes 55 days. 1 in 5 is asked for more information, which adds about 76 days. Building starts about 3 months after permission.
Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.
Calculated350 decided home extensions, 163 start notices, 113 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála
What appeals changed
15 of 45 appealed refusals became permissions. 15 of 70 appealed approvals were reversed.
Every appeal decided within 1.5 km in 10 years, any kind of development.
CalculatedAn Coimisiún Pleanála cases linked to the council file
Appeals nearby 4 in the last 12 months
None of 2 changed the council's decision
- 501318 Granted · 117B Church Road, East Wall, Dublin 3 which also backs onto the… · 226 m report
- 501713 Pending · 22, 23 and part of 21 Church Street East, at corner of Abercorn Road… · 313 m
- 501459 Pending · 67 Bargy Road, East Wall, Dublin 3 · 251 m
- 500623 Granted · Unit 13 and Unit 14, Docklands Innovation Park, 128-130 East Wall… · 265 m report
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 19 Oct 2026, 02:08
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 16 Oct 2026, 23:06 | open |
| Courts Service legal diary (judicial reviews) | © the publisher | 19 Oct 2026, 01:37 | open |
| National Planning Application Database | CC BY 4.0 | 19 Oct 2026, 02:08 | open |
What's changing around you?
- 1Unit 8 Portside House, Portside Business Centre WEB3272/26
- 218, West Road WEB3380/26
- 3Alexandra Place 3703/20
- 445 Shelmalier Road Dublin 3 D03PW92 DS1596
- 553 Shelmalier Road Dublin 3 D03X512 DS1386
- 6Alexander Terrace and Castleforbes Road DSDZ3862/22
- 71.1 ha zoned for homes
- 83 Killane Road, Dublin 3 WEB1839/26
- 91.9 ha zoned for homes
- 100.5 ha zoned for homes
- 114 Church Road, East Wall 5105/26
- 123, Killane Road WEB1839/26
- 13125, Saint Mary's Road North WEB3239/26
- 14The proposed 3no. underground cable routes, or sections of cable routes in Dublin City are located in the Ashtown WEB1097/26
- 15Site known as The Carriageworks, which forms part of the former Castleforbes Business Park WEB5913/25
What happens to applications within 500 m
Permission isn't building. Of 152 permissions since 2016, 64 show a start notice and 21 have a completion certificate.
Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.
Measured195 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates
The next 30 days
4 deadlines within 500 m; the first closes 19 Oct 2026.
- Comments close 19 Oct 2026closes today1WEB3272/26 · application received — Permission for the sub-division of the existing commercial unit (Unit 8, Portside House) at…€20 to the council · 88 m away
- Time to ask the High Court for a review ends 27 Oct 20268 days leftGrant permission226 m away
- Comments close 2 Nov 202614 days left2WEB3380/26 · application received — The development will consist of the construction of a new front boundary wall with railings,…€20 to the council · 479 m away
- Comments close 10 Nov 202622 days leftWEB3461/26 · application received — The development consists of: The alteration and extension of the existing single storey rear…€20 to the council · 88 m away
Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file
Approved, stalled or planned, not built yet
131 homes 101 m away were approved Nov 2021 with no start notice yet; the permission runs to Nov 2026. DART+ West is planned 623 m away.
Each row is a dated fact from a public register: no score and no forecast.
Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)
Sites that could change 7 within 500 m
Derelict building 2
- 445 Shelmalier Road Dublin 3 D03PW92 · derelict since Dec 2024 · 192 m
- 553 Shelmalier Road Dublin 3 D03X512 · derelict since Sep 2023 · 208 m
Approved, not started, approval running out 2
- Alexandra Place · 131 homes approved, not started; runs out Nov 2026 · 101 m
- Alexander Terrace and Castleforbes Road · 58 homes approved, not started; runs out Aug 2027 · 429 m
Empty land zoned for homes 3
- 71.1 ha zoned for homes · no homes built on it yet · 126 m
- 91.9 ha zoned for homes · no homes built on it yet · 237 m
- 100.5 ha zoned for homes · no homes built on it yet · 373 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 19 Oct 2026, 02:28
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 16 Oct 2026, 23:06 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 19 Oct 2026, 01:33 | open |
| Derelict sites registers | CC BY 4.0 | 12 Oct 2026, 23:08 | open |
| Council meetings (ModernGov) | Public | 19 Oct 2026, 02:28 | open |
| National Planning Application Database | CC BY 4.0 | 19 Oct 2026, 02:08 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 19 Oct 2026, 00:29 | open |
Applications within 500 m, by year
Between 16 and 27 a year; busiest 2020. 94% of decisions were approvals.
2019 and 2026 are part years (*). Exemption requests and time extensions are left out.
Measuredcouncil register via NPAD
Open for comments €20 to comment
- 1Unit 8 Portside House, Portside Business Centre, East Wall Road, East Wall, Dublin 3, D03 ET62 comments close 19 Oct 2026Permission for the sub-division of the existing commercial unit (Unit 8, Portside House) at ground and first…
- 218, West Road, Dublin 3 comments close 2 Nov 2026The development will consist of the construction of a new front boundary wall with railings, 1.37 metres in…
- 6, Hawthorn Terrace, East Wall, Dublin 3, D03 C651 comments close 10 Nov 2026The development consists of: The alteration and extension of the existing single storey rear return,…
Every application within 500 m 31 in the last 12 months
See every application on the map
- 6 Hawthorn Terrace, East Wall, Dublin 3, D03 C651 Withdrawn or not validThe development consists of: The alteration and extension of the existing single storey rear return,…
- 18 West Road, East Wall, Dublin 3, D03NV27 Withdrawn or not validThe development will consist of the construction of a new front boundary wall with railings, 1.37 metres in…
- Unit 8 Portside House, Portside Business Centre, East Wall Road, East Wall, Dublin 3, D03 ET62 Withdrawn or not validPermission for the sub-division of the existing commercial unit (Unit 8, Portside House) at ground and first…
- 13125, Saint Mary's Road North, Dublin 3 No decision yetThe development will consist of the following: a) Construction of a single story lean to roof extension to…
- 125, Saint Mary's Road North, Dublin 3 Withdrawn or not validThe development will consist of the following: a) Construction of a single story lean-to roof extension to…
- 67 West Road, Dublin 3, Dublin 3, D03 WN23 No decision yetPlanning application for the construction of (a) Construction of a two-storey extension to the side, with the…
- MACE, Retail 03, Marshall Yards, East Wall, Dublin 3. No decision yetBeer, Wine, Spirits, Retail Off Licence subsidiary to main retail use and all associated works at ground…
- Building 2, City Block 3, Coopers Cross at Sheriff Street Upper, Castleforbes Road and Mayor Street Upper, North Lotts, Dublin 1 No decision yetKWCI GP Limited acting in its capacity as general partner of KWCI Limited Partnership intends to apply for…
- 44, Church Road, East Wall, Dublin 3, D03 X061 Withdrawn or not validThe proposed development consists of the construction of a new vehicular entrance, including the lowering or…
- 114 Church Road, East Wall, Dublin 3, D03VK10 No decision yet1. Demolition of (a) existing single storey garage/storage space to the side of existing house and (b) part…
- 4 Church Road, East Wall, Dublin 3, D03VK10 Withdrawn or not valid1. Demolition of (a) existing single storey garage/storage space to the side of existing house and (b) part…
- 123, Killane Road, Dublin 3, D03 YY20 ApprovedConversion of existing attic space comprising of modification of existing roof structure, new access stairs,…
- 18 Crescent Gardens, East Wall, Dublin 3 RefusedRETENTION : Retention of the change of use of the existing vacant flat roofed single storey structure in rear…
- 18 Crescent Gardens, East Wall, Dublin 3 Withdrawn or not validRETENTION PERMISSION: Change of use of the existing vacant flat roofed single storey structure in rear garden…
- 67 Bargy Road, East Wall, Dublin 3 ApprovedConstruction of a two storey flat roof extension at the rear/side , alteration to existing gable window and…
- 18 Crescent Gardens, East Wall, Dublin 3 Withdrawn or not validRETENTION : Retention of change of use of the existing vacant flat roofed single storey structure in rear…
- 7 Hawthorn Terrace,, Dublin 3, D03 Y998, D03 Y998 ApprovedThe development seeking permission will consist of the provision of a 3m wide vehicular entrance to the front…
- 14The proposed 3no. underground cable routes, or sections of cable routes in Dublin City are located in the Ashtown, Glasnevin and North Wall areas as follows:, The proposed Coolmine cable route section connecting the permitted Ashtown 38 kV substation (AC No decision yetThe Electricity Supply Board (ESB) intends to apply for permission for a 10-year approval for development at…
- 5B East Road, East Wall, Dublin 3 ApprovedAt ground floor level, change of use from an existing retail unit to 2no. 2-bedroom apartments with communal…
- 5B East Road, East Wall, Dublin 3 Withdrawn or not validAt ground floor level, change of use from an existing retail unit to 2no. 2-bedroom apartments with communal…
- 22, 23 and part of 21 Church Street East, at corner of Abercorn Road and Church Street East, Dublin 3 ApprovedThe development will consists of Construction of 8 no. apartments, comprising 5no. 2 bed and 3no. 1 bed…
- 5B East Road, East Wall, Dublin 3 Withdrawn or not validChange of use from an existing retail unit to 2no. 2-bedroom apartments with communal open space and a single…
- 15Site known as The Carriageworks, which forms part of the former Castleforbes Business Park, Sheriff Street Upper and East Road, Dublin 1 ApprovedThe site is bound by Sheriff St Upper to the south, the railway yards to the north, the completed Freight…
- Castleforbes Square To south (front) of Block D, Castleforbes Square, and partly to south of Block C, Castleforbes Square, Castleforbes Square (between Castleforbes Road and North Wall Avenue), Dublin 1 ApprovedThe development will consist of alterations to existing loading/unloading/set down area (50.874m x 2.4m) on…
- 22, 23 and part of 21 Church Street East at corner of Abercorn Road and Church Street East, Dublin 3 Withdrawn or not validThe development will consists of Construction of 8 no. apartments, comprising 5no. 2 bed and 3no. 1 bed…
- Unit 13 and Unit 14, Docklands Innovation Park, 128–130 East Wall Road, Dublin 3 ApprovedPERMISSION AND RETENTION: We, EWR Innovation Park Limited, intend to apply for retention permission and…
- 44, Church Road, East Wall, Dublin 3, D03 X061 Withdrawn or not validThe proposed development consists of the construction of a new vehicular entrance, including the lowering or…
- 23 Church Street East, Dublin 3 Withdrawn or not validPlanning Permission for previously approved planning ref 3362/19, at this site 23 Church Street East, Dublin…
How we work this out
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 19 Oct 2026, 02:08
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 19 Oct 2026, 02:08 | open |
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 16 Oct 2026, 23:06 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 19 Oct 2026, 01:33 | open |
Building work nearby 14 in the last 12 months
- 67 Bargy Road, Dublin, Dublin 3, D03 X757 · 30 Oct 2026 · start notice, opted out no sign-off needed · 5067/26 · 261 m
- East Wall Road, Dublin, Dublin 3, D03 DK29 · 21 Sept 2026 · 7-day notice not signed off · 352 m
- 83 Killane Road, Dublin 3, Dublin, D03 YY20 · 3 Sept 2026 · short notice no sign-off needed · WEB1839/26 · 159 m
- 8 Castleforbes Road, Dublin 1, D01 PY95 · 2 Sept 2026 · 7-day notice not signed off · WEBDSDZ2533/26 · 473 m
- 8 Castleforbes Road, Dublin 1, D01 PY95 · 25 Aug 2026 · 7-day notice not signed off · WEBDSDZ2533/26 · 473 m
- Sheriff Street Upper, Dublin, Dublin 1 · 29 May 2026 · 7-day notice not signed off · WEB5593-25 · 348 m
- Sheriff Street Upper, Dublin, Dublin 1, D01 X0A4 · 22 May 2026 · 7-day notice not signed off · WEB5913/25 · 355 m
- 102 Caledon Road east wall, East Wall, Dublin 3, D03 DA32 · 7 May 2026 · start notice, opted out no sign-off needed · WEB5215/21 · 226 m
- 34 Fairfield Avenue, Dublin, Dublin 3, D03 CV40 · 27 Apr 2026 · start notice, opted out no sign-off needed · WEB2793/25 · 335 m
- 8 Castleforbes Road, Dublin, Dublin 1, D01 PY95 · 12 Jan 2026 · 7-day notice signed off · 473 m
- 8 Castleforbes Road, Dublin, Dublin 1, D01 PY95 · 12 Jan 2026 · short notice no sign-off needed · 473 m
- Castleforbes, Sheriff Street Upper, Dublin, Dublin 1, D01 X0A4 · 5 Jan 2026 · start notice signed off · 301 m
- 80 Castleforbes Square, Dublin, Dublin 1, D01 RP28 · 8 Dec 2025 · start notice signed off · 3358/25 · 401 m
- 63 Russell Avenue East, Dublin, Dublin 3, D03 PX71 · 30 Oct 2025 · start notice, opted out no sign-off needed · WEB2190/25 · 158 m
How we work this out
Source: Building Control Management System (commencement notices) · fetched 19 Oct 2026, 01:33
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 19 Oct 2026, 01:33 | open |
Homes coming 189 not started
- Castleforbes Business Park · 702 homes · building started · 310 m
- 1-4 East Road · 554 homes · building started · 164 m
- City Block 3 and Northbank House · 472 homes · building started · 431 m
- City Block 2, Spencer Dock · 329 homes · ran out · runs out 28 Jan 2026 · 455 m
- 3Alexandra Place · 131 homes · runs out soon · runs out 23 Nov 2026 · 101 m
- 6Alexander Terrace and Castleforbes Road · 58 homes · runs out soon · runs out 25 Aug 2027 · 429 m
- East Wall Road and Alfie Byrne Road · 18 homes · building started · 483 m
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 19 Oct 2026, 02:08
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 16 Oct 2026, 23:06 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 19 Oct 2026, 01:33 | open |
| National Planning Application Database | CC BY 4.0 | 19 Oct 2026, 02:08 | open |
| Social housing construction status report | CC BY-SA 4.0 | 9 Oct 2026, 23:01 | open |
Named places nearby: estate, schemes, crèches, schools
Named places estate, developments, inspections
Developments within 1.0 km
| Scheme | Homes | Progress | Distance |
|---|---|---|---|
| Alexandra Place | 71 | 71 not started (2026-Q2) | 67 m |
| 1-4 East Road | 554 | 554 built (2025-Q4) | 73 m |
| Castleforbes Business Park | 702 | 287 built · 415 being built (2026-Q2) | 237 m |
| 17-23 Church Street East | 28 | no activity on site reported (2025-Q2) | 313 m |
| City Block 3 and Northbank House | 449 | — | 360 m |
| City Block 2, Spencer Dock | 329 | — | 373 m |
| Alexander Terrace and Castleforbes Road | 58 | — | 417 m |
| City Block 9 | 550 | — | 553 m |
Who applies most nearby
- Bronwood Commercial Limited — 2 applications, latest 14 Sept 2026
Crèches and schools inspected
| Name | Latest inspection | Distance |
|---|---|---|
| Daisy Days Childcare Ltd · Crèche | 28 Feb 2024 · report · Tusla Early Years Inspectorate | 42 m |
| Larkin Childcare Facility · Crèche | 15 Aug 2024 · report · Tusla Early Years Inspectorate | 793 m |
| Giraffe Childcare NCI · Crèche | 21 Aug 2025 · report · Tusla Early Years Inspectorate | 840 m |
| Little Treasures Community Creche · Crèche | 11 Jun 2026 · report · Tusla Early Years Inspectorate | 859 m |
| Giraffe Childcare IFSC · Crèche | 16 Feb 2026 · report · Tusla Early Years Inspectorate | 890 m |
| The Links Creche & Montessori LTD · Crèche | 25 Mar 2025 · report · Tusla Early Years Inspectorate | 972 m |
| Daughters of Charity and Family service , St. Louise's ECDS · Crèche | 16 Sept 2024 · report · Tusla Early Years Inspectorate | 981 m |
How we work this out
Sources: Dublin housing delivery pipeline, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list, Tusla early years register · fetched 19 Oct 2026, 02:08
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Dublin housing delivery pipeline | CC BY 4.0 | 12 Oct 2026, 23:02 | open |
| National Planning Application Database | CC BY 4.0 | 19 Oct 2026, 02:08 | open |
| Applicant organisations (from the CRO) | Derived by Planning Register | 18 Oct 2026, 23:06 | — |
| Department of Education school list | CC BY 4.0 | 27 Sept 2026, 23:32 | open |
| Tusla early years register | Public register | 14 Oct 2026, 23:20 | open |
How busy is this area Busier than most of Dublin City Council.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 16 Oct 2026, 23:06 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 19 Oct 2026, 01:33 | open |
| National Planning Application Database | CC BY 4.0 | 19 Oct 2026, 02:08 | open |
What's the area like?
This street block against the council
90% of homes built before 1971 (council 52%). 60% owner-occupied (council 47%).
MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268108023
Schools, stops and the council
Schools
- St Josephs Mxd NS · primary · 211 pupils · 316 m
- St Laurence O'Toole's National School · primary · 159 pupils · 664 m
- Naomh Lorcan O Tuathail Senior Boys · primary · 69 pupils · 706 m
- St L O Tooles 2 Spec · primary · 14 pupils · 810 m
- St Columbas NS Mxd · primary · 90 pupils · 855 m
Stops 60
- East Road · 151, 53, N4 · 9/hour at peak · 111 m
- East Road · 53, N4 · 6/hour at peak · 134 m
- Church Rd E · 53 · 1/hour at peak · 140 m
- Church Rd S · 53 · 1/hour at peak · 211 m
- Bargy Road · 151 · 3/hour at peak · 232 m
- Church Rd W · 53 · 1/hour at peak · 238 m
- Church Rd W · 53 · 1/hour at peak · 240 m
- Bargy Road · 151, 53, N4 · 6/hour at peak · 244 m
Schools growing or shrinking planning in 3 years · pupils last year
- St Josephs Mxd NS · 316 m-6.2% pupils (211) · an extension 2026, approved
- St Laurence O'Toole's National School · 664 m-10.2% pupils (159)
- Naomh Lorcan O Tuathail Senior Boys · 706 m-6.8% pupils (69)
- St L O Tooles 2 Spec · 809 m-30% pupils (14)
- St Columbas NS Mxd · 855 m-1.1% pupils (90)
Open consultations
- Proposed Front of School Works St Matthew's National School closes today
- Dublin District Heating Project Part 8 2 days left
- The Draft Markets Public Realm Plan (2026) 12 days left
- Golden Lane Part 8 Planning 18 days left
- NOTICE OF PROPOSED TREE PRESERVATION ORDER AT KENILWORTH SQUARE, DUBLIN 6. PLANNING AND DEVELOPMENT ACT 2000 (AS AMENDED). 46 days left
Council meetings 30 items
- 15 Sept 2026 · With reference to the Extinguishment of Public Right of Way at 1-21 Nottingham Street
- 15 Sept 2026 · With reference to the Extinguishment of Public Right of Way at Rutland Cottages, Dublin 1
- 15 Sept 2026 · With reference to the Extinguishment of Public Right of Way at Rutland Cottages, Dublin 1
- 7 Sept 2026 · Report No. 181/2026 of the A/Executive Manager (S. Hennessy) - With reference to Disposal of a site…
- 21 Jul 2026 · With reference to the disposal of a site at Church Street Upper and Brunswick Street North, Dublin…
- 6 Jul 2026 · Report No. 149/2026 of the Executive Manager (D. O'Connor) - With reference to the grant of a…
- 6 Jul 2026 · Report No. 164/2026 of the Executive Manager (D. O'Connor) - With reference to the grant of a…
- 6 Jul 2026 · Report No. 150/2026 of the Executive Manager (D. O'Connor) - With reference to the proposed grant…
Public land
- An Post · 0.71 ha · 50 m
- An Post · 0.19 ha · 108 m
- Córas Iompair Éireann · 1.68 ha · 188 m
- Córas Iompair Éireann · 0.12 ha · 239 m
- Córas Iompair Éireann · 0.16 ha · 248 m
- Córas Iompair Éireann · 3.15 ha · 263 m
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 19 Oct 2026, 02:28
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Public transport stops and routes (NTA GTFS) | CC BY 4.0 | 18 Oct 2026, 23:44 | open |
| Department of Education school list | CC BY 4.0 | 27 Sept 2026, 23:32 | open |
| National Planning Application Database | CC BY 4.0 | 19 Oct 2026, 02:08 | open |
| Council consultation portals | Public | 19 Oct 2026, 01:38 | open |
| Council meetings (ModernGov) | Public | 19 Oct 2026, 02:28 | open |
| Land Development Agency public land register | CC BY 4.0 | 11 Sept 2026, 16:43 | open |
| cso_saps_2022 | CC BY 4.0 | — | open |
| National Transport Authority | CC BY 4.0 | — | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | CC BY 4.0 | — | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | CC BY 4.0 | — | — |
| EPA strategic noise maps | CC BY 4.0 | — | — |
| Fingal County Council | CC BY 4.0 | — | — |
What to ask, and who
- 131 homes approved 101 m away (Alexandra Place), not started: what is planned?CouncilAsk for: The planning file for 3703/20.
- Application 88 m away open for comments until 19 Oct 2026: comment?CouncilAsk for: The plans on the council's website (€20 to comment).
- Any work done without planning permission?Seller · solicitorAsk for: An opinion of compliance for the whole house.
Where this is, the terms, the sources
- Electoral division
- North Dock B
- Electoral area
- North Inner City
- Council
- Dublin City Council
Everything we found, as a list 8 lines
- Zoned R2 (existing residential); not protected; no vacant land tax.
- 7 sites nearby could change: 2 derelict, 2 approved schemes, 3 empty zoned plots.
- 3 applications open for comments nearby; nearest closes 19 Oct 2026.
- 189 homes approved nearby, not started; largest 131 at Alexandra Place.
- New Wapping Street (bus G1, G2) 486 m away: 15 an hour at morning peak; 75 from all stops within 500 m. Planned: DART+ West 622 m away, railway order granted (July 2024).
- Noise from rail mapped at 45–49 dB (day-evening-night average, EPA 2022).
- Here (2022 census): 60% owner-occupied (council 47%); 14% of homes empty (council 8%); most built before 1919; 17% drive to work (council 28%); population up 32% since 2016.
- 8 home extensions within 250 m since 2026. Most were single-storey rear extensions.
What the terms mean 9 terms
- Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
- Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
- Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
- Approved (Grant of permission): The council said yes, usually with conditions.
- Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
- Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
- Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
- Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
- What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 33
| Source | Publisher | Licence | Fetched |
|---|---|---|---|
| EPA strategic noise maps | — | CC BY 4.0 | — |
| Fingal County Council | — | CC BY 4.0 | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | — | CC BY 4.0 | — |
| National Transport Authority | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | An Coimisiún Pleanála | CC BY 4.0 | 16 Oct 2026 |
| data.nbco.gov.ie | National Building Control Office (BCMS) | CC BY 4.0 | 19 Oct 2026 |
| data.gov.ie | Various (see each layer) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026 |
| gis.epa.ie | Environmental Protection Agency | CC BY 4.0 | 27 Sept 2026 |
| s3.eu-west-1.amazonaws.com | Office of Public Works | CC BY-NC-ND 4.0 · flag only | 11 Sept 2026 |
| services-eu1.arcgis.com | National Parks and Wildlife Service | CC BY 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Inventory of Architectural Heritage | CC BY 4.0 | 27 Sept 2026 |
| gis.epa.ie | Environmental Protection Agency | CC BY 4.0 | 27 Sept 2026 |
| dlrcoco.citizenspace.com | Local authorities (consultation portals) | Public | 19 Oct 2026 |
| www2.courts.ie | — | © the publisher | 19 Oct 2026 |
| cso.ie | — | CC BY 4.0 | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | Local authorities (derelict sites registers) | CC BY 4.0 | 12 Oct 2026 |
| services.arcgis.com | Dublin local authorities (housing delivery pipeline) | CC BY 4.0 | 12 Oct 2026 |
| data.epa.ie | Environmental Protection Agency (LEAP licence register) | CC BY 4.0 | 12 Oct 2026 |
| esbnetworks.ie | — | © the publisher · flag only | 11 Sept 2026 |
| transportforireland.ie | National Transport Authority | CC BY 4.0 | 18 Oct 2026 |
| lda.ie | Land Development Agency | CC BY 4.0 | 11 Sept 2026 |
| meetings.fingal.ie | Local authorities (council meetings) | Public | 19 Oct 2026 |
| services.arcgis.com | Department of Housing (National Planning Application Database) | CC BY 4.0 | 19 Oct 2026 |
| organisations | Planning Register (derived from applications and the CRO register) | Derived by Planning Register | 18 Oct 2026 |
| services-eu1.arcgis.com | Tailte Éireann | CC BY 4.0 | 11 Sept 2026 |
| services-eu1.arcgis.com | CSO, Tailte Éireann, OpenStreetMap contributors | CC BY 4.0 | 4 Oct 2026 |
| propertypriceregister.ie | Property Services Regulatory Authority (PPR) | © PSRA, PSI licence | 19 Oct 2026 |
| services.arcgis.com | Local authorities (RZLT maps) | CC BY 4.0 | 18 Oct 2026 |
| gov.ie | Department of Education | CC BY 4.0 | 27 Sept 2026 |
| gov.ie | Department of Housing | CC BY-SA 4.0 | 9 Oct 2026 |
| tusla.ie | Tusla (Early Years Inspectorate) | Public register | 14 Oct 2026 |
| services.arcgis.com | Local authorities via the Department of Housing (GZT / MyPlan) | CC BY 4.0 | 18 Oct 2026 |