The proposed development consists of the construction of a new vehicular entrance, including the lowering or dishing of the public footpath, and all associated site works at 44 Church Road, East wall, to provide vehicular access from the public road.
WEB1959/26received 23 Apr 2026decided 27 Apr 2026253 m away
1. Demolition of (a) existing single storey garage/storage space to the side of existing house and (b) part of the single storey extension to the rear of existing house . 2. The construction of a new ground floor single storey extension with a flat roof to house a new bedroom and shower room , all to the rear of the existing house . 3. Replacement of the existing single storey garage/ storage space to the side of the existing house with as new single storey flat roof garage , storage space and utility room . Plus all associated site works .
5105/26received 20 Apr 2026decided 12 Jun 2026275 m away
1. Demolition of (a) existing single storey garage/storage space to the side of existing house and (b) part of the single storey extension to the rear of existing house . 2. The construction of of a new ground floor single storey extension with a flat roof to house a new bedroom and shower room all to the rear of the existing house . 3. Replacenent of the existing single storey garage/storage space to the side of the exiting house with a new single storey flat roof garage /storage space and utility room . Plus all associated site works .
5097/26received 15 Apr 2026decided 16 Apr 2026275 m away
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
WEB1839/26received 13 Apr 2026decided 4 Jun 2026268 m away
RETENTION : Retention of the change of use of the existing vacant flat roofed single storey structure in rear garden of dwelling from garage/workshop use to habitable use (floor area 38.70 sqm ) ancillary to principal dwelling .
5091/26received 9 Apr 2026decided 3 Jun 2026289 m away
RETENTION PERMISSION: Change of use of the existing vacant flat roofed single storey structure in rear garden of dwelling from garage/ workshop use to habitable use (Floor Area 38.7M2) ancillary to the principal dwelling.
5085/26received 31 Mar 2026decided 2 Apr 2026289 m away
RETENTION : Retention of change of use of the existing vacant flat roofed single storey structure in rear garden of dwelling from garage/workshop use to habitable use (floor area 38.7 sq. m ) ancillary to principal dwelling .
5066/26received 19 Mar 2026decided 20 Mar 2026289 m away
Construction of a two storey flat roof extension at the rear/side , alteration to existing gable window and formation of additional gable wall windows , new vehicular entrance driveway and front boundary wall and piers , dishing of existing kerb and all associated works.
5067/26received 19 Mar 2026decided 8 May 2026337 m away
The development seeking permission will consist of the provision of a 3m wide vehicular entrance to the front of the property as well as repairing the existing front wall.
WEB1510/26received 5 Mar 2026decided 29 Apr 2026150 m away
The Electricity Supply Board (ESB) intends to apply for permission for a 10-year approval for development at this site consisting of up to approximately 3.72 kilometres (km) of 38 kilovolts (kV) underground cable (UGC) across 3 no. routes at different locations in Dublin City with a total site area of c.4.23ha. The proposed UGC are located at the Ashtown, Glasnevin and North Wall areas within Dublin City. The proposed development consists of the following elements:
• Installation of 3no. new 38 kV underground cable routes, or cable route sections, and all associated site and development works within the administrative area of Dublin City Council (DCC) as outlined below and illustrated on the maps herein:
- The proposed Coolmine cable route section within DCC is approximately 1.14km in length connecting the permitted Ashtown 38 kV substation (ACP Ref. 314232) to the County Border with Fingal at Navan Road (R147).
- The proposed Glasnevin cable route is wholly within DCC and is approximately 1.2km in length connecting the existing Glasnevin 38kV substation to the permitted Clareville 38kV substation (ACP Ref. 314232).
- The proposed North Quays cable route is wholly within DCC and is approximately 1.38km in length connecting the permitted Spencer Dock 38kV substation (ACP Ref. 314232) with the existing 38 kV circuit on East Wall Road (R131).
The primary purpose of the proposed underground cables is to provide electrical power to the Dart+ West Railway project as granted under the DART+ West Railway Order (ACP Ref. 314232).
The proposed underground cable routes will incorporate the following elements:
• Communication links and fibre optic cables between all substations in the same trench as the UGC;
• Joint bays and communication chambers along the UGC alignment;
• Temporary construction laydown and work areas with ancillary staff facilities and parking, temporary access tracks, passing bays and water and utility crossings.
• All associated and ancillary above and below ground site development works, including works comprising or relating to permanent and temporary construction and roadworks and excavation (including HDD) and vegetation clearance.
Refer to the enclosed site and newspaper notices for a full description of development for the maps attached.
WEB1097/26received 16 Jan 2026decided 11 Mar 2026304 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 50 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
An Post — Dublin city and suburbs
0.71 hafolio DN160213L166 m awayas of 1 Apr 2023
Córas Iompair Éireann — Dublin city and suburbs
3.15 hafolio DN165256F241 m awayas of 1 Apr 2023
An Post — Dublin city and suburbs
0.19 hafolio DN150310L256 m awayas of 1 Apr 2023
Córas Iompair Éireann — Dublin city and suburbs
1.68 hafolio DN32425F353 m awayas of 1 Apr 2023
Electricity Supply Board — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 05:45 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.