Portland Row
What closes soonest 4 open windows
- Judicial review window closes 23 Sept 202610 days leftRefuse permission8 weeks from the Commission's decision (29 Jul 2026) · s.50 Planning and Development Act 2000 · 0 m away
- Consultation closes 25 Sept 202612 days leftPublic Participation in the Identification of New Bathing Watersas published by the council (25 May 2026) · council consultation portal · 397 m away
- Consultation closes 8 Oct 202625 days leftLansdowne Valley Park Active Travel Schemeas published by the council (9 Sept 2026) · council consultation portal · 397 m away
- Judicial review window closes 8 Oct 202625 days leftGrant permission with conditions8 weeks from the Commission's decision (13 Aug 2026) · s.50 Planning and Development Act 2000 · 689 m away
Where this is
- Settlement
- Dublin city and suburbs
- Electoral division
- Ballybough A
- Local electoral area
- North Inner City
- Local authority
- Dublin City Council
- Parcel
- Tailte Éireann 2519676 (freehold), 3.76 ha
Census 2022, small area 268009012
14.4% owner-occupied, 81.4% privately rented, 54.2% social. Vacancy 6.9%.
Zoning evaluated against the point
Zone Z1 - DEV PLAN 2022-2028
Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
Source: zoning · fetched 12 Sept 2026, 02:04
| Source | Licence | Fetched | Link |
|---|---|---|---|
| zoning | CC-BY-4.0 | 12 Sept 2026, 02:04 | open |
Designations and constraints within 1000 m
| Designation | Count | Examples |
|---|---|---|
| EPA-licensed facility | 2 | Cahill Printers Limited; Lower Oriel Street |
| Natural Heritage Area (incl. proposed) | 2 | North Dublin Bay; Royal Canal |
| NIAH-recorded building | 740 | George's Dock Bridge; 'Famine'; CHQ Building |
| Radon risk area | 1 | About 1 in 20 homes in this area is likely to have high radon levels |
| Recorded monument | 28 | House - 17th/18th century; Quay; Burial ground |
Sources: constraints, constraints.epa_licence, constraints.flood_cfram, constraints.flood_nifm, constraints.nha, constraints.niah, constraints.radon, constraints.smr · fetched 11 Sept 2026, 19:11
| Source | Licence | Fetched | Link |
|---|---|---|---|
| constraints | mixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false) | 11 Sept 2026, 19:11 | open |
| constraints.epa_licence | CC-BY-4.0 | 11 Sept 2026, 19:11 | open |
| constraints.flood_cfram | CC-BY-NC-ND-4.0 · not redistributable — shown as a flag only | 11 Sept 2026, 19:11 | open |
| constraints.flood_nifm | CC-BY-NC-ND-4.0 · not redistributable — shown as a flag only | 11 Sept 2026, 19:11 | open |
| constraints.nha | CC-BY-4.0 | 11 Sept 2026, 19:11 | open |
| constraints.niah | CC-BY-4.0 | 11 Sept 2026, 19:11 | open |
| constraints.radon | CC-BY-4.0 | 11 Sept 2026, 19:11 | open |
| constraints.smr | CC-BY-4.0 | 11 Sept 2026, 19:11 | open |
Residential Zoned Land Tax
Not available: section failed: GEOSIntersects: TopologyException: side location conflict at -6.2630052640000002 53.355752408000001.
This site is not on the current draft or final RZLT map.
Planning applications 636 in 5 years within 1.0 km
Recent decisions and applications
- Citigroup Building, 1 North Wall Quay, Dublin 1, D01 T8Y1. The site is bound by North Wall Quay to the south, Commons Street to the west, Clarion Quay/Alderman Way to the north and an access ramp to the existing basement to the east. D01 T8Y1 Registered ApplicationWe, NWQ Devco Limited, intend to apply for a 10 year planning permission for development at a site consisting of the CitiGroup Building, 1 North Wall Quay, Dublin 1, D01 T8Y1. The site is bound by North Wall Quay to the south, Commons Street to the west, Clarion Quay/Alderman Way to the north and an access ramp to the existing basement to the east. The site area is c. 0.88 ha. The proposed development will consist of: • Partial demolition, removal of existing facades and extension of existing 5-6 storeys office building; • The resulting proposed extended development (c. 60,119 sq.m) ranges in height from 6 no. to 12 no. storeys in height over existing basement comprising office accommodation, 2 no. hotels, a retail/café unit and a community space; • The proposed development comprises 4 no. blocks: o Block A (6-11 storeys) comprises office accommodation. o Block B (12 no. storeys) comprises office accommodation. o Block C (10 storeys) will comprise a hotel with 201 no. bedrooms; o Block D (6-7 storeys) will comprise a hotel with 135 no. bedrooms; o It is noted that there will be a change of use of part of the existing retained floor area from office to hotel (c. 12,847 sqm) to accommodate the proposed hotels. • 1 no. retail/cafe unit (91 sq.m) is provided within Block D at ground floor level; • 1 no. internal community space (654 sq.m) is provided at ground floor level; • A shared entrance for Blocks C and D; • Provision of a shared atrium between Block C and Block D; • Outdoor terraces at 5th, 6th, 7th, 9th, and 11th floor levels; • Green roofs and blue roofs are provided across the scheme; • 32 no. car parking spaces will be provided at basement level to serve the development. This represents a reduction of 132 no. car parking spaces in comparison to the existing office building on the site; • 456 no. bicycle spaces (inc. and 4 no. motorcycle spaces are proposed at basement level; • 18 no. short-stay bicycle space (9 no. Sheffield stands) are proposed at surface level; • The development includes the fill and cover of existing access ramp to existing basement to provide a landscaped community pocket park (244 sq.m) to the east of the building. The park will include a pedestrian link from North Wall Quay to Clarion Quay; • Provision of upgrades to existing public realm within application site including public footpaths along North Wall Quay, Commons Street and Clarion Quay; • All ancillary and associated works to facilitate the development including plant, pv panels, switch rooms, generators, water tanks, sprinkler plant, ESB substations, landscaping, telecommunications infrastructure and utilities connections and infrastructure. An Environmental Impact Assessment Report and Natura Impact Statement have been prepared in respect of the proposed development and have been submitted with the planning application.
- Fowler Hall, 11 Rutland Place, Dublin 1, D01 TX39 Registered ApplicationProvision of a new entrance door to Fowler Hall, 11 Rutland Place, Dublin 1, D01 TX39
- Citigroup Building, 1 North Wall Quay, Dublin 1, D01 T8Y1 The site is bound by North Wall Quay to the South, Commons Street to the West, Clarion Quay/Alderman Way to the North and an access ramp to the existing basement to the East., D01 T8Y1 Application declared invalidWe, NWQ Devco Limited, intend to apply for a 10 year planning permission for development at a site consisting of the CitiGroup Building, 1 North Wall Quay, Dublin 1, D01 T8Y1. The site is bound by North Wall Quay to the south, Commons Street to the west, Clarion Quay/Alderman Way to the north and an access ramp to the existing basement to the east. The site area is c. 0.88 ha. The proposed development will consist of: • Partial demolition, removal of existing facades and extension of existing 5-6 storeys office building; • The resulting proposed extended development (c. 60,119 sq.m) ranges in height from 6 no. to 12 no. storeys in height over existing basement comprising office accommodation, 2 no. hotels, a retail/café unit and a community space; • The proposed development comprises 4 no. blocks: o Block A (6-11 storeys) comprises office accommodation. o Block B (12 no. storeys) comprises office accommodation. o Block C (10 storeys) comprises a hotel with 201 no. bedrooms. o Block D (6-7 storeys) comprises a hotel with 135 no. bedrooms. • 1 no. retail/cafe unit (91 sq.m) is provided within Block D at ground floor level; • 1 no. internal community space (654 sq.m) is provided at ground floor level; • A shared entrance for Blocks C and D; • Provision of a shared atrium between Block C and Block D; • Outdoor terraces at 5th, 6th, 7th 9th, and 11th floor levels; • Green roofs and blue roofs are provided across the scheme; • 32 no. car parking spaces will be provided at basement level to serve the development. This represents a reduction of 132 no. car parking spaces in comparison to the existing office building on the site; • 456 no. bicycle spaces (inc. and 4 no. motorcycle spaces are proposed at basement level; • 18 no. short-stay bicycle space (9 no. Sheffield stands) are proposed at surface level; • The development includes the fill and cover of existing access ramp to existing basement to provide a landscaped community pocket park (244 sq.m) to the east of the building. The park will include a pedestrian link from North Wall Quay to Clarion Quay; • Provision of upgrades to existing public realm within application site including public footpaths along North Wall Quay, Commons Street and Clarion Quay; • All ancillary and associated works to facilitate the development including plant, pv panels, switch rooms, generators, water tanks, sprinkler plant, ESB substations, landscaping, telecommunications infrastructure and utilities connections and infrastructure. An Environmental Impact Assessment Report and Natura Impact Statement have been prepared in respect of the proposed development and have been submitted with the planning application.
- 146, Clonliffe Road, Drumcondra, Dublin 3 Registered ApplicationThe development will consist of (i) the demolition of the existing garden shed and the previous extension, the removal of the existing chimney to the rear of the property, and the construction of a new single-storey rear extension to the existing house, together with all associated site and landscaping works; (ii) an attic conversion to provide a habitable room and an en-suite bathroom at second-floor level within the terraced house. The works will include the construction of a dormer window to the north-facing roof slope, set back from each side boundary to provide separation from the adjoining properties; (iii) the installation of three high-level rooflights to the existing rear roof slope, together with two solar panel arrays, one on the front roof slope and one on the rear roof slope; and (iv) renovation works and minor internal alterations to the existing dwelling.
- 67 Fourth Avenue, Seville Place, Dublin 1 Registered ApplicationPlanning permission to convert the existing attic to bedroom use with flat roofed dormer to the rear and 2no. rooflights to the front roof plane with all associated site works.
- 54, Clonliffe Road, Dublin 3, D03 E685 Registered Applicationa new vehicular access to front, with all related works.
- 18, Rutland Cottages, Dublin 1, D01 W9V9 Registered ApplicationThe removal of the existing rear extension and dormer and its replacement with a new 2 storey flat roof rear extension, raising the existing ridge to accommodate the new rear extension, 4no. new rooflights and a privacy screen to rear, and all associated ancillary site and boundary works.
- Nos. 16-19 Rutland Place, Dublin 1, (located to the rear of Nos 16-19 North Great George's Street all of which, are Protected Structures) Registered ApplicationPROTECTED STRUCTURE: Sevona Ltd. intend to apply for planning permission for amendments to DCC Reg. Ref. 3747/23 (ACP Ref. 319653-24) at this c. 0.0846ha site located at Nos. 16-19 Rutland Place, Dublin 1 (located to the rear of Nos. 16-19 North Great George’s Street, all of which are Protected Structures) (RPS Nos. 3191, 3192, 3193, and 3194). The proposed amendments are comprised of internal alterations to the permitted layout at first, second, and third floor levels to facilitate a revised unit mix of 4 No. Studio apartment units; 17 No. 1-Bedroom apartment units; 1 No. 2-Bedroom, 4-Person apartment unit; 3 No. 3-Bedroom, 4-Person apartment units; and 1 No. 3-Bedroom, 5-Person apartment unit, representing an overall increase in the number of apartment units provided from 20 No. units to 26 No. units in total. The proposed amendments are also comprised of alterations and reconfiguration to the internal layout, including amendments to internal party walls at first, second, and third floor levels; Relocation of lift and A.O.V system at ground, first, second, and third floor levels; Modification to fenestration on front elevation to apartment unit A-1-04 at first floor level and apartment unit A-2-12 at second floor level consisting of the replacement of previously permitted single large opening at both levels with two smaller openings to reflect internal changes; The omission of previously permitted louvre openings to balconies on south-eastern side elevation at first, and second floor levels per Condition No. 5 of granted permission; Modification to building line at third floor and roof level to simplify the roof arrangement and remove previously permitted recesses; The omission of 2 No. previously permitted openings to the plant rooms on the north/south/east/west rear building façade; The addition of 8 No. bicycle parking spaces to the rear courtyard and relocation of stands; and all other associated development works above and below ground.
- 18, Rutland Cottages, Dublin 1 Application declared invalidThe removal of the existing rear extension and dormer and its replacement with a new 2 storey flat roof rear extension, raising the existing ridge to accommodate the new rear extension, 4no. new rooflights and a privacy screen to rear, and all associated ancillary site and boundary works.
- Unit 1, Talbot Mall, Talbot Street, Dublin 1 Registered ApplicationThe erection of a new operator signage on the fascia and three clipper frame signs on the interior of the windows. The development includes all works associated with the proposed development.
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
Source: npad · fetched 12 Sept 2026, 20:38
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 12 Sept 2026, 20:38 | open |
Appeals 96 in 5 years within 1.0 km
- ACP 500887 on WEB5358/25 Granted with conditions
- ACP 500535 on WEB2410/25 Refused
- ACP 324467 on WEBLRD6089/26-S3 Open
- ACP 501713 on WEB6040/25 Pending
- ACP 501651 on WEB6103/25 Open
- ACP 501632 on WEB1480/26 Open
- ACP 501023 on WEB6034/25 Refused
- ACP 324344 on DAC2618636DC Pending
- ACP 501478 on WEB1608/26 Pending
- ACP 501319 on WEB2466/25 Pending
Source: acp · fetched 12 Sept 2026, 00:05
| Source | Licence | Fetched | Link |
|---|---|---|---|
| acp | CC-BY-4.0 | 12 Sept 2026, 00:05 | open |
Commencement notices 127 in 3 years within 1.0 km
- 22/23 Talbot Street, Dublin 1, D01 DW02 — Commencement notice
- Unit 1, The Distillery Building, Distillery Road, Dublin 3, D03 X7N3 — Commencement notice
- 8 Hibernian Avenue, Dublin 3, D03 KR50 — Short commencement notice
- 3 Killane Road, Dublin 3, Dublin, D03 YY20 — Short commencement notice
- 111 Talbot Street, Dublin 1, D01 H0F4 — Commencement notice
- North Wall Quay, Dublin 1, D01 YE64 — Short commencement notice
- Fitzgibbon Street, Dublin 1 — Commencement notice
- 2 Connolly Station, Dublin 1, D01 H592 — Seven day notice
- 1 Gardiner Street Upper, Dublin 1, D01 Y9T1 — Short commencement notice
- 6 Denmark Street Great, Dublin 1, D01 TK25 — Short commencement notice
One notice can cover many buildings — count notices, never building rows, or a single multi-unit scheme reads as a trend (T11).
Source: bcms · fetched 12 Sept 2026, 23:34
| Source | Licence | Fetched | Link |
|---|---|---|---|
| bcms | CC-BY-4.0 | 12 Sept 2026, 23:34 | open |
Sales 1083 in 36 months within 1.0 km
€23,000 – €92,511,013, 13 Sept 2023 to 1 Sept 2026.
| Address | Sold | Price | Asking | Type | Beds | m² | €/m² | BER | Dist. |
|---|---|---|---|---|---|---|---|---|---|
| 62 LIBERTY CORNER, FOLEY ST, DUBLIN 1 | 1 Sept 2026 | €355,000 | — | — | — | — | — | — | 787 m |
| 32 HILL OF DOWN, SPENCER DOCK, DUBLIN 1 | 31 Aug 2026 | €535,000 | — | — | — | — | — | — | 787 m |
| 30 CLONCURRY HOUSE, SPENCER DOCK, DUBLIN 1 | 28 Aug 2026 | €415,000 | — | — | — | — | — | — | 787 m |
| APT 5, BLOCK 11, CLARION QUAY DUBLIN 1 | 27 Aug 2026 | €425,000 | — | — | — | — | — | — | 787 m |
| APT 67, RICHMOND HALL, RICHMOND RD FAIRVIEW | 26 Aug 2026 | €360,000 | €325,000 | Apartment | 2 | — | — | B3 | 909 m |
| 96 KIRKPATRICK HOUSE, SPENCER DOCK, DUBLIN 1 | 21 Aug 2026 | €460,000 | — | — | — | — | — | — | 787 m |
| APT 3, 47 MOUNTJOY SQ, DUBLIN 1 | 21 Aug 2026 | €450,000 | — | — | — | — | — | — | 787 m |
| 509 THE LIFFEY TRUST, 117 126 UPPER SHERIFF ST, DUBLIN | 20 Aug 2026 | €567,000 | — | — | — | — | — | — | 787 m |
| 159 IVY EXCHANGE, PARNELL ST, DUBLIN 1 | 20 Aug 2026 | €445,000 | — | — | — | — | — | — | 787 m |
| APT 24, 55 MOUNTJOY SQ WEST, DUBLIN 1 | 20 Aug 2026 | €275,000 | — | — | — | — | — | — | 787 m |
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Sources: cara_listings, ppr · fetched 11 Sept 2026, 20:14
| Source | Licence | Fetched | Link |
|---|---|---|---|
| cara_listings | Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped. | 11 Sept 2026, 20:14 | open |
| ppr | PSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.' | 12 Sept 2026, 20:31 | open |
Consultations 4 matched by place
- Public Participation in the Identification of New Bathing Waters 12 days left
- iMEND 1 - Portobello Community Engagement 19 days left
- Lansdowne Valley Park Active Travel Scheme 25 days left
- Dublin District Heating Project Part 8 38 days left
Source: consult · fetched 12 Sept 2026, 02:04
| Source | Licence | Fetched | Link |
|---|---|---|---|
| consult | public | 12 Sept 2026, 02:04 | open |
Council items 10 in 24 months
- With reference to the Extinguishment of Public Right of Way at 1-21 Nottingham Street
- With reference to the Extinguishment of Public Right of Way at Rutland Cottages, Dublin 1
- With reference to the Extinguishment of Public Right of Way at Rutland Cottages, Dublin 1
- With reference to the Extinguishment of Public Right of Way at 1-21 Nottingham Street
- Report No. 181/2026 of the A/Executive Manager (S. Hennessy) - With reference to Disposal of a site at Church Street Upper and Brunswick Street North, D7 to Brunswick North Regeneration Limited.
- With reference to the disposal of a site at Church Street Upper and Brunswick Street North, Dublin 7 to Brunswick North Regeneration Limited
- Report No. 164/2026 of the Executive Manager (D. O'Connor) - With reference to the grant of a 3-year Short-Term Letting at Ballybough Community Centre, Ballybough Road, Dublin 1 to Young People at Risk (YPAR)
- Report No. 149/2026 of the Executive Manager (D. O'Connor) - With reference to the grant of a further licence of site at Lourdes Parish Hall, Rutland Street, Dublin 1
- Report No. 150/2026 of the Executive Manager (D. O'Connor) - With reference to the proposed grant of a 3-year lease of the premises at Liberty Corner (Retail Unit No.7), James Joyce Street, Dublin 1 to Wexford Centre Project CLG.
- Report No. 150/2026 of the Executive Manager (D. O'Connor) - With reference to the proposed grant of a 3-year lease of the premises at Liberty Corner (Retail Unit No.7), James Joyce Street, Dublin 1 to Wexford Centre Project CLG.
Source: moderngov · fetched 12 Sept 2026, 21:48
| Source | Licence | Fetched | Link |
|---|---|---|---|
| moderngov | public | 12 Sept 2026, 21:48 | open |
Capacity and public land
No publishable utility-capacity record within the radius. 180 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
- City of Dublin Education and Training Board — Dublin city and suburbs
- City of Dublin Education and Training Board — Dublin city and suburbs
- City of Dublin Education and Training Board — Dublin city and suburbs
- Health Service Executive — Dublin city and suburbs
- Córas Iompair Éireann — Dublin city and suburbs
- Dublin City Council — Dublin city and suburbs
- Dublin City Council — Dublin city and suburbs
- Dublin City Council — Dublin city and suburbs
Sources: esbn, lda_lands · fetched 11 Sept 2026, 16:42
| Source | Licence | Fetched | Link |
|---|---|---|---|
| esbn | all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only | 11 Sept 2026, 16:42 | open |
| lda_lands | CC-BY-4.0 | 11 Sept 2026, 16:43 | open |
Schools and public transport within 1.0 km
Schools
- ST VINCENTS INF BOYS
- ST L O TOOLES 2 SPEC
- S N SAN VINSEANN CAILIN
- O'Connell School
- AN TAONAD REAMHSCOILE
- NAOMH LORCAN O TUATHAIL SENIOR BOYS
- ST COLUMBAS N S MXD
- SCOIL UI CHONAILL BOYS SENIORS
Stops 87 · routes 100X, 101, 101X, 103, 103X, 105X, 109, 109A, 109B, 109X, 111, 111X, 115, 115C, 115X, 120, 120B, 120F, 120X, 126, 126A, 126B, 126D, 126N, 126T, 126X, 13, 130, 130A, 132, 133, 14, 142, 15, 151, 179, 191, 193, 194, 2, 22, 23, 245X, 27, 27A, 27B, 27X, 29n, 30, 31n, 32, 32X, 33, 33D, 33E, 33X, 33n, 40D, 41, 41B, 41C, 41D, 41X, 42, 42n, 43, 500, 500N, 500X, 501, 502, 503, 505, 505X, 506, 506X, 507, 53, 6, 60, 7, 73, 740, 740A, 740X, 782, 783, 784, 785, 7A, 7B, 7D, 7E, 847, 853, 900, 901, 910, 912, 980, 980A, 980B, Commuter, DART, G1, G2, Green, H1, H2, H3, NX, Red, rail
- Newcomen Bridge
- Newcomen Bridge
- Five Lamps
- Five Lamps
- Summerhill Pd
- Summerhill Pd
- Summerhill
- North Strand Rd
Sources used in this report
| Section | Source | Licence | Fetched |
|---|---|---|---|
| Location | places | CC-BY-4.0 | 11 Sept 2026, 21:28 |
| Parcel | parcels | CC-BY-4.0 | 11 Sept 2026, 19:06 |
| Zoning | zoning | CC-BY-4.0 | 12 Sept 2026, 02:04 |
| Constraints | constraints | mixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false) | 11 Sept 2026, 19:11 |
| Constraints | constraints.epa_licence | CC-BY-4.0 | 11 Sept 2026, 19:11 |
| Constraints | constraints.flood_cfram | CC-BY-NC-ND-4.0 · not redistributable, flag only | 11 Sept 2026, 19:11 |
| Constraints | constraints.flood_nifm | CC-BY-NC-ND-4.0 · not redistributable, flag only | 11 Sept 2026, 19:11 |
| Constraints | constraints.nha | CC-BY-4.0 | 11 Sept 2026, 19:11 |
| Constraints | constraints.niah | CC-BY-4.0 | 11 Sept 2026, 19:11 |
| Constraints | constraints.radon | CC-BY-4.0 | 11 Sept 2026, 19:11 |
| Constraints | constraints.smr | CC-BY-4.0 | 11 Sept 2026, 19:11 |
| Planning | npad | CC-BY-4.0 | 12 Sept 2026, 20:38 |
| Appeals | acp | CC-BY-4.0 | 12 Sept 2026, 00:05 |
| Commencements | bcms | CC-BY-4.0 | 12 Sept 2026, 23:34 |
| Sales | cara_listings | Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped. | 11 Sept 2026, 20:14 |
| Sales | ppr | PSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.' | 12 Sept 2026, 20:31 |
| Consultations | consult | public | 12 Sept 2026, 02:04 |
| Council items | moderngov | public | 12 Sept 2026, 21:48 |
| Capacity | esbn | all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only | 11 Sept 2026, 16:42 |
| Public land | lda_lands | CC-BY-4.0 | 11 Sept 2026, 16:43 |
| Projects | social_housing | CC-BY-SA-4.0 | 11 Sept 2026, 20:13 |
| Amenities | gtfs | CC-BY-4.0 | 11 Sept 2026, 19:16 |
| Amenities | schools | CC-BY-4.0 | 11 Sept 2026, 16:41 |
| Deadlines | acp | CC-BY-4.0 | 12 Sept 2026, 00:05 |
| Deadlines | consult | public | 12 Sept 2026, 02:04 |
| Deadlines | moderngov | public | 12 Sept 2026, 21:48 |
| Deadlines | npad | CC-BY-4.0 | 12 Sept 2026, 20:38 |
| Deadlines | rzlt | CC-BY-4.0 | 12 Sept 2026, 00:23 |
Generated 13 Sept 2026, 08:40 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.