PlanningRegister.ie
Planning report · Dublin City Council · 500 m around the house · the last 12 months · 5 Nov 2026, 07:30

Windsor Avenue

53.36348, -6.23792

Homes here mostly date from before 1919. 2 planning files on this house, the latest from 2021. Home extensions nearby almost always get approved (97%). 41 homes approved 483 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 7 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed. 2 planning files on this house, the latest from 2021.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918. 2 planning files on this house.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Windsor AvenueBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2021: WEB1857/21 · garden room, refused2021: WEB1799/21 · garden room, withdrawn or invalid2021: 6 files on Windsor Avenue2022: 6 files on Windsor Avenue2024: 2 files on Windsor Avenue2025: 2 files on Windsor Avenue16 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2021
    WEB1857/21 · garden room · refused 2021
    approvedstarted?signed off?
  2. 2021
    WEB1799/21 · garden room · withdrawn
    approved?started?signed off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Heritage inventory3 within 100 m St. Mary's Church; Garadice House
Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Everlac Paints Ltd (81 m); Cahill Printers Limited (881 m); licence W0083 (996 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 500 mCountFor example
Licensed industrial sites1Everlac Paints Ltd
Heritage inventory buildings25St. Vincent's Hospital; post box
Radon grid squares1
Monuments5Bridge; Weir - fish
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 3 on the draft 2027 map; 3 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed sites, National Inventory of Architectural Heritage, EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), OPW flood maps (NIFM), Sites and Monuments Record · fetched 2 Nov 2026, 23:44
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.02 Nov 2026, 23:44open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
OPW flood maps (NIFM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 89–100% by type. A new house in a garden is harder: 72% approved, and 1 in 2 are asked for more information.

Single-storey rear73 decided · more info asked 18%
99% · council 97%
Two-storey rear65 decided · more info asked 20%
98% · council 96%
Two-storey side11 decided · more info asked 36%
100% · council 98%
Attic or dormer160 decided · more info asked 8%
99% · council 96%
First-floor37 decided · more info asked 19%
89% · council 94%
Garage conversion15 decided · more info asked 7%
100% · council 99%
New house in a garden or site54 decided · more info asked 57%
72% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 415 nearby, 5,480 council-wide

Figure 3

Windsor Avenue, file by file since 2021

3 of 4 decided extensions on the road were approved. New houses in side gardens or on sites: 5 of 6.

16 planning files on Windsor Avenue since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 13 · 2022 · attic conversion / dormer · approved · 3500/22No. 7 · 2022 · attic conversion / dormer · refused · 3502/22No. 7 · 2022 · attic conversion / dormer · approved · 4273/22No. 36 · 2022 · single-storey rear · approved · WEB1388/22Porches, roofs, otherNo. 16 · 2021 · other work · withdrawn or invalid · 3787/21No. 44 · 2021 · other work · approved · WEB1726/21No. 45 · 2021 · other work · refused · WEB1857/21No. 32 · 2022 · other work · approved · 3046/22New house in a side gardenNo. 11 · 2021 · new house · withdrawn or invalid · 3892/2111No. 13 · 2021 · new house · withdrawn or invalid · 3914/21No. 11 · 2021 · new house · approved · 3928/21No. 13 · 2022 · new house · approved · WEB1832/2213No. 31 · 2024 · new house · approved · WEB2777/2431No. 32 · 2024 · new house · approved · WEB2778/24No. 13 · 2025 · new house · refused · WEB1513/2513No. 13 · 2025 · new house · approved · WEB5901/25
ApprovedRefusedWithdrawn or invalid

16 files with "Windsor Avenue" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 7 within 250 m · 0 refused within 100 m

Extensions and refusals near you 7 extensions within 250 m · the last 12 months

4 approved3 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic43—
Single-storey rear21—
First-floor10—

On Fairview Close: 8 extensions in 10 years, 77% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 7 is asked for more information, which adds about 72 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 7): 129 days; Appeal window: 4 weeks; If appealed: +221 days; Building starts: 118 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=356)55 daysIf more info asked (1 in 7)With further information: median 129 days (n=65)129 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 221 days (n=115, all appeals within 1.5 km)+221 daysBuilding startsStart notice: median 118 days after permission (n=210)118 days after permissionSigned off570 days after the start, for the few who file. 54% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated421 decided home extensions, 216 start notices, 115 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    12 of 44 appealed refusals became permissions. 14 of 71 appealed approvals were reversed.

    Refusals appealed44 decided
    12 became permissions
    Approvals appealed71 decided
    14 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 324344 Granted with conditions · Block G, St. Vincent's, Fairview, Dublin 3. · 388 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher4 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 4

    What's changing around you?

    Street map around Windsor Avenue with 15 numbered planning items
    ⌖ the houseOpen for commentsApproved, not startedDerelict buildingBuilding startedEmpty land zoned for homesApprovedNo decision yet
    1. 1Bushfield House, 57 Philipsburgh Avenue WEB3599/26No decision yet · 157 m
    2. 247/49 Fairview Strand WEB5185/25Approved, no sign building has started · 167 m
    3. 347/49 Fairview Strand Dublin 3 D03E271 DS1017Derelict building · 173 m
    4. 418 Cadogan Road Dublin 3 D03K650 DS912Derelict building · 201 m
    5. 527 Richmond Avenue Dublin 3; 29 Richmond Avenue Dublin 3; 21 Richmond Avenue Dublin 3 D03A9C2 DS784Derelict building · 351 m
    6. 617-19 Richmond Avenue 3657/21Approved, no sign building has started · 376 m
    7. 7Spring Garden Street and Nos. 2 2320/21Approved, not started, approval runs out within a year · 483 m
    8. 82 ANNESLEY PLACE DUBLIN 3 D03T620 DS1005Derelict building · 484 m
    9. 913 Windsor Lane, Dublin WEB5901/25Building started · 69 m
    10. 100.1 ha zoned for homesEmpty land zoned for homes · 130 m
    11. 110.6 ha zoned for homesEmpty land zoned for homes · 362 m
    12. 12Site to rear of 13 Windsor Avenue, on Windsor Lane WEB5901/25Approved · 59 m
    13. 13Bushfield House, 57 WEB2756/26No decision yet · 175 m
    14. 1434 Cadogan Road, Dublin 3 WEB1135/26Approved · 199 m
    15. 15Apartment 1, 44 Philipsburgh Avenue WEB1496/26Approved · 206 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 109 permissions since 2016, 38 show a start notice and 4 have a completion certificate.

    154 applications lodged within 500 m. Council: 111 approved, 16 refused. After appeals: 109 approved. Of those: 4 signed off, 18 built with the owner's opt-out, 16 started, 71 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT111: lodged → approved16: lodged → refused20: lodged → withdrawn or invalid7: lodged → undecided107: approved → approved13: refused → refused20: withdrawn or invalid → withdrawn7: undecided → undecided3 approved by the council, refused after an appeal1 approved by the council, withdrawn or invalid after an appeal2 refused by the council, approved after an appeal1 refused by the council, withdrawn or invalid after an appeal71: approved → no start notice found18: approved → built, owner opted out16: approved → started, not signed off4: approved → signed off154 lodged154 lodged111 approved111 approved16 refused16 refused20 withdrawn or invalid20 withdrawn or invalid7 undecided7 undecided109 approved109 approved16 refused16 refused22 withdrawn22 withdrawn7 undecided7 undecided71 no start notice found71 no start notice found18 built, owner opted out18 built, owner opted out16 started, not signed off16 started, not signed off4 signed off4 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured154 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 11 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-11 ACP 324344: Allow appeal amend conditions; 2026-11-26 WEB3599/26: application received — PROTECTED STRUCTURE: RETENTION For a total of 16 solar panels on the roof comprising 8 no. panels to front roof (south),today10 Nov15 Nov20 Nov25 Nov30 Nov5 DecACP 324344: Allow appeal amend conditions · 388 m away · 2026-11-11WEB3599/26: application received — PROTECTED STRUCTURE: RETENTION For a total of 16 solar panels on the roof comprising 8 no. panels to front roof (south), · 157 m away · 2026-11-26
    Comments closeHigh Court window ends
    • Time to ask the High Court for a review ends 11 Nov 20266 days left
      Allow appeal amend conditions
      388 m away
    • Comments close 26 Nov 202621 days left
      1WEB3599/26 · application received — PROTECTED STRUCTURE: RETENTION For a total of 16 solar panels on the roof comprising 8 no.…
      €20 to the council · 157 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    41 homes 483 m away were approved Apr 2022 with no start notice yet; the permission runs to Apr 2027. DART+ West is planned 477 m away.

    Spring Garden Street and… · 41 homes: 41 homes approved, not started; runs out Apr 2027; 17-19 Richmond Avenue · 27 homes: 27 homes approved Apr 2024, not started; DART+ West, DART+ West:…: railway order granted (July 2024)202220232024202520262027202820292030Spring Garden Street and… · 41 homes483 m · 2320/2141 homes approved, not started; runs out Apr 202741 homes approved, not started; runs out Apr 202717-19 Richmond Avenue · 27 homes376 m · 3657/2127 homes approved Apr 2024, not started27 homes approved Apr 2024, not startedDART+ West, DART+ West:…477 m · plannedrailway order granted (July 2024)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 8 within 500 m

    Derelict building 4

    • 347/49 Fairview Strand Dublin 3 D03E271 · derelict since Apr 2026 · 173 m
    • 418 Cadogan Road Dublin 3 D03K650 · derelict since Jul 2022 · 201 m
    • 527 Richmond Avenue Dublin 3; 29 Richmond Avenue Dublin 3; 21 Richmond Avenue Dublin 3 D03A9C2 · derelict since Dec 2012 · 351 m
    • 82 ANNESLEY PLACE DUBLIN 3 D03T620 · derelict since Apr 2025 · 484 m

    Approved, not started, approval running out 1

    Approved, not started 1

    Empty land zoned for homes 2

    • 100.1 ha zoned for homes · no homes built on it yet · 130 m
    • 110.6 ha zoned for homes · no homes built on it yet · 362 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
    Council meetings (ModernGov)Public5 Nov 2026, 02:33open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
    Figure 9

    Applications within 500 m, by year

    Between 19 and 30 a year; busiest 2022. 87% of decisions were approvals.

    2021: 31, 2022: 30, 2023: 19, 2024: 21, 2025: 27, 2026: 260102030402021: 24 approved2021: 4 refused2021: 3 withdrawn or invalid31’21*2022: 25 approved2022: 5 refused30’222023: 15 approved2023: 4 refused19’232024: 19 approved2024: 2 refused21’242025: 21 approved2025: 1 refused2025: 5 withdrawn or invalid27’252026: 7 approved2026: 12 withdrawn or invalid2026: 7 undecided26’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 33 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Building work nearby 14 in the last 12 months
    4 not signed off10 no sign-off needed
    • 913 Windsor Lane, Dublin, Dublin 3 · 12 Nov 2026 · 1 homes · start notice, opted out no sign-off needed · WEB5901/25 · 69 m
    • Former Dublin City Council Depot, Orchard Road, Drumcondra, Dublin 3, Dublin 3 · 2 Nov 2026 · 38 homes · start notice not signed off · 4067/24 · 412 m
    • 58 Croydon Green, Dublin 3, D03 A7X2 · 2 Nov 2026 · start notice, opted out no sign-off needed · WEB1763/26 · 433 m
    • Convent Avenue, Richmond Road, Fairview, Dublin 3, Dublin 3 · 4 Aug 2026 · 7-day notice not signed off · LRD6009/23-S3 & LRD6015/26-S3 · 432 m
    • 44 Philipsburgh Avenue, Dublin 3, D03 CK03 · 24 Jun 2026 · short notice no sign-off needed · WEB1496/26 · 222 m
    • 22 Clonliffe Road, Dublin 3, D03 PD32 · 11 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 3337/25 · 442 m
    • 34 Cadogan Road, Dublin, Dublin 3, D03 XY07 · 25 May 2026 · short notice no sign-off needed · WEB1135/26 · 212 m
    • Richmond Road, Fairview, Dublin 3., Dublin 3 · 9 Apr 2026 · 811 homes · start notice not signed off · LRD6009/23-S3 · 435 m
    • 2 Haverty Road, Marino, Dublin 3, D03 V026 · 25 Mar 2026 · start notice, opted out no sign-off needed · WEB2610/25 · 362 m
    • Richmond Road, Fairview, Dublin 3., Dublin 3 · 2 Mar 2026 · start notice not signed off · LRD6009/23-S3 · 448 m
    • 1 Edges Corner, Fairview, Dublin, Dublin 3 · 2 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · WEB2216/25 · 147 m
    • 65 Shelmartin Avenue, Marino, Dublin 3, D03 P9C0 · 27 Jan 2026 · short notice no sign-off needed · WEB1158/25 · 372 m
    • 14 Fairview Green, Dublin 3, D03 T8K3 · 25 Nov 2025 · short notice no sign-off needed · WEB1908/25 · 245 m
    • 124 Shelmartin Avenue, Dublin 3, D03 T8P3 · 14 Nov 2025 · short notice no sign-off needed · WEB2250/25 · 178 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 5 Nov 2026, 03:55
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Homes coming 78 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Fairview Close · 22 applications in 10 years · 77% approved · most common: attic conversion / dormer

    Developments within 1.0 km

    SchemeHomesProgressDistance
    45-47 Fairview Avenue Lower25no activity on site reported (2025-Q4)129 m
    19 and 21 Esmond Avenue2121 not started (2026-Q2)163 m
    61-65 Fairview Strand and 3 Esmond Avenue8282 not started (2026-Q2)201 m
    17-19 Richmond Avenue2121 not started (2026-Q2)343 m
    9/9a Richmond Avenue2828 being built (2026-Q2)351 m
    Ready Mix Site6868 not started (2026-Q2)370 m
    St. Vincent's Hospital Site779283 being built · 496 not started (2026-Q2)388 m
    Richmond Road and Convent Avenue104104 not started (2026-Q2)437 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Fairview Creche and Montessori · Crèche3 Jul 2025 · report · Tusla Early Years Inspectorate200 m
    Lullaby's Creche & Montessori · Crèche15 Apr 2025 · report · Tusla Early Years Inspectorate346 m
    Lullabys Montessori & Afterschool · Crèche13 May 2025 · report · Tusla Early Years Inspectorate364 m
    First Steps Creche and Montessori · Crèche9 Sept 2024 · report · Tusla Early Years Inspectorate430 m
    Hyde & Seek Childcare (Tolka Road) · Crèche5 Jun 2026 · report · Tusla Early Years Inspectorate564 m
    Larkin Early Education Service · Crèche11 Mar 2026 · report · Tusla Early Years Inspectorate621 m
    Westwood Childcare · Crèche10 Mar 2026 · report · Tusla Early Years Inspectorate641 m
    Larkin Childcare Facility · Crèche15 Aug 2024 · report · Tusla Early Years Inspectorate655 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.02 Nov 2026, 23:01open
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register4 Nov 2026, 23:36open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here139
    Council middle52
    Homes started
    Here1,837
    Council middle109
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    96% of homes built before 1971 (council 52%). 62% owner-occupied (council 47%).

    Homes built before 1971
    96% · council 52%
    Homes built since 2001
    0% · council 19%
    Owner-occupied
    62% · council 47%
    Rented
    35% · council 45%
    Children under 15
    22% · council 15%
    Aged 65 and over
    9% · council 13%
    Households with 2+ cars
    17% · council 19%
    Work mainly from home
    18% · council 12%
    This small area (193 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268049006

    Bus
    138 m
    Philipsburgh Ave · 42n, 73 · busiest stop within 500 m: 45 an hour at peak
    Planned
    477 m
    DART+ West, DART+ West: Connolly - Maynooth
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Yes
    OPW flood map area within 100 m
    Nearest school
    81 m
    St Marys NS, 212 pupils
    Homes sold nearby
    986
    in 3 years, 49 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St Marys NS · primary · 212 pupils · 81 m
    • St Josephs C.B.S. · postprimary · 310 pupils · 287 m
    • St Joseph¿s Primary School, An Edmund Rice School · primary · 116 pupils · 336 m
    • Marino College · postprimary · 297 pupils · 434 m
    • St Joseph'S Adolescent School · primary · 11 pupils · 516 m
    • St Columbas NS Mxd · primary · 90 pupils · 603 m
    • Howth Rd Mxd NS · primary · 89 pupils · 788 m
    • St Vincents De Paul Junior NS · primary · 334 pupils · 878 m

    Stops 58

    • Philipsburgh Ave · 42n, 73 · 5/hour at peak · 138 m
    • Philipsburgh Ave · 73 · 5/hour at peak · 140 m
    • Fairview · 130, 14, 15, 27, 27A, 27B · 43/hour at peak · 157 m
    • Annesley Br Road · 29n, 31n · 205 m
    • Melrose Avenue · 42n, 73 · 5/hour at peak · 219 m
    • Fairview · 130, 14, 15, 27, 27A, 27B · 45/hour at peak · 226 m
    • Fairview Strand · 73 · 5/hour at peak · 237 m
    • Brian Road · 73 · 5/hour at peak · 259 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Marys NS · 81 m+2.9% pupils (212)
    • St Josephs C.B.S. · 287 m+17.9% pupils (310) · temporary classrooms 2024, approved
    • St Joseph¿s Primary School, An Edmund Rice School · 336 m+0.9% pupils (116) · temporary classrooms 2024, approved
    • Marino College · 434 m+7.2% pupils (297)
    • St Joseph'S Adolescent School · 516 m+22.2% pupils (11)
    • St Columbas NS Mxd · 603 m-1.1% pupils (90)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 21.32 ha · 123 m
    • Dublin City Council · 0.7 ha · 320 m
    • Dublin City Council · 0.15 ha · 346 m
    • Dublin City Council · 0.46 ha · 361 m
    • Dublin City Council · 0.63 ha · 362 m
    • An Post · 0.15 ha · 391 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Council consultation portalsPublic5 Nov 2026, 01:15open
    Council meetings (ModernGov)Public5 Nov 2026, 02:33open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Garden room (WEB1857/21) refused 2021: built anyway?
      Ask for: The seller's answer and your surveyor's check.
      Seller · solicitor
    2. Flood risk area within 100 m: can you insure it?
      Ask for: A flood-cover quote before sale agreed.
      Insurer
    3. Application 157 m away open for comments until 26 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    4. Building work started 69 m away: for how long?
      Ask for: The planning conditions for WEB5901/25.
      Agent · council
    5. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Clontarf West D
    Electoral area
    Clontarf
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • 2 applications on this site; latest WEB1857/21, refused 2021.
    • Zoned R2 (existing residential); not protected; no vacant land tax; flood risk area within 100 m.
    • 8 sites nearby could change: 4 derelict, 2 approved schemes, 2 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 26 Nov 2026.
    • 78 homes approved nearby, not started; largest 41 at Spring Garden Street and Nos. 2.
    • North Strand FS (bus 130, 14) 419 m away: 46 an hour at morning peak; 269 from all stops within 500 m. Planned: DART+ West 477 m away, railway order granted (July 2024).
    • Here (2022 census): 62% owner-occupied (council 47%); 17% of homes empty (council 8%); most built before 1919; 20% drive to work (council 28%); population up 10% since 2016.
    • 7 home extensions within 250 m since 2025. Most were dormers or attic conversions. On Fairview Close: 8 in 10 years, 77% approved.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 34
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.05 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public5 Nov 2026
    www2.courts.ie—© the publisher4 Nov 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.02 Nov 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.02 Nov 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public5 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.05 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence5 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register4 Nov 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 5 Nov 2026, 07:30 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.