PlanningRegister.ie
Planning report · Dublin City Council · 500 m around the house · the last 12 months · 1 Nov 2026, 16:21

Fairview Close

53.36360, -6.24238

Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (97%). 41 homes approved 455 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 7 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 3 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
M1
Zoning · Metro / rail economic corridor
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z10 - DEV PLAN 2022-2028

ZoningM1 · Metro / rail economic corridor
What it says

Z10: Inner Suburban and inner City Sustainable Mixed-Uses: To consolidate and facilitate the development of inner city and inner suburban sites for mixed-uses.

A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningM1 · Metro / rail economic corridor
What it says

Z10: Inner Suburban and inner City Sustainable Mixed-Uses: To consolidate and facilitate the development of inner city and inner suburban sites for mixed-uses.

A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Protected building1 within 100 m Jewish burial ground
Heritage inventory1 within 100 m graveyard/cemetery
Monument zone1 within 100 m Burial ground
Radon1 in 20 homes have high radon (EPA)

Not on this site: conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Everlac Paints Ltd (316 m); licence W0083 (957 m)

Vacant land taxNo not on the map
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 500 mCountFor example
Licensed industrial sites1Everlac Paints Ltd
Heritage inventory buildings27St. Vincent's Hospital; Woodbine Lodge
Radon grid squares1
Monuments9Castle - unclassified; Bridge
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 4 on the draft 2027 map; 4 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed sites, National Inventory of Architectural Heritage, EPA radon map, Sites and Monuments Record, EPA licensed facilities (LEAP), Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), OPW flood maps (NIFM) · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
OPW flood maps (NIFM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 93–100% by type. A new house in a garden is harder: 67% approved, and 1 in 2 is asked for more information.

Single-storey rear81 decided · more info asked 16%
99% · council 97%
Two-storey rear78 decided · more info asked 15%
95% · council 96%
Two-storey side10 decided · more info asked 30%
100% · council 98%
Attic or dormer173 decided · more info asked 9%
99% · council 96%
First-floor41 decided · more info asked 20%
93% · council 94%
Garage conversion15 decided · more info asked 7%
100% · council 99%
New house in a garden or site55 decided · more info asked 49%
67% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 453 nearby, 5,480 council-wide

Extensions and refusals right beside you 7 within 250 m · 0 refused within 100 m

Extensions and refusals near you 7 extensions within 250 m · the last 12 months

4 approved3 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic43—
Single-storey rear21—
Single-storey side10—

On Fairview Close: 8 extensions in 10 years, 77% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 7 is asked for more information, which adds about 74 days. Building starts about 3 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 7): 130 days; Appeal window: 4 weeks; If appealed: +213 days; Building starts: 106 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=393)55 daysIf more info asked (1 in 7)With further information: median 130 days (n=66)130 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 213 days (n=119, all appeals within 1.5 km)+213 daysBuilding startsStart notice: median 106 days after permission (n=231)106 days after permissionSigned off570 days after the start, for the few who file. 52% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated459 decided home extensions, 237 start notices, 119 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    13 of 50 appealed refusals became permissions. 14 of 69 appealed approvals were reversed.

    Refusals appealed50 decided
    13 became permissions
    Approvals appealed69 decided
    14 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 324344 Granted with conditions · Block G, St. Vincent's, Fairview, Dublin 3. · 158 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Fairview Close with 15 numbered planning items
    ⌖ the houseOpen for commentsApproved, not startedDerelict buildingAppealBuilding startedEmpty land zoned for homesNo decision yet
    1. 1Bushfield House, 57 Philipsburgh Avenue WEB3599/26No decision yet · 184 m
    2. 274, Ballybough Road WEB3595/26No decision yet · 456 m
    3. 317-19 Richmond Avenue 3657/21Approved, no sign building has started · 120 m
    4. 427 Richmond Avenue Dublin 3; 29 Richmond Avenue Dublin 3; 21 Richmond Avenue Dublin 3 D03A9C2 DS784Derelict building · 137 m
    5. 547/49 Fairview Strand WEB5185/25Approved, no sign building has started · 150 m
    6. 647/49 Fairview Strand Dublin 3 D03E271 DS1017Derelict building · 159 m
    7. 718 Cadogan Road Dublin 3 D03K650 DS912Derelict building · 295 m
    8. 8Spring Garden Street and Nos. 2 2320/21Approved, not started, approval runs out within a year · 455 m
    9. 9Block G, St. Vincent's 324344Appeal: approved with conditions · 158 m
    10. 10Former Dublin City Council Depot, Orchard Road 4067/24Building started · 152 m
    11. 11Convent Avenue, Richmond Road LRD6009/23-S3 & LRD6015/26-S3Building started · 195 m
    12. 120.2 ha zoned for homesEmpty land zoned for homes · 246 m
    13. 130.1 ha zoned for homesEmpty land zoned for homes · 425 m
    14. 140.6 ha zoned for homesEmpty land zoned for homes · 456 m
    15. 15Bushfield House, 57 WEB2756/26No decision yet · 168 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 117 permissions since 2016, 39 show a start notice and 3 have a completion certificate.

    171 applications lodged within 500 m. Council: 122 approved, 23 refused. After appeals: 117 approved. Of those: 3 signed off, 18 built with the owner's opt-out, 18 started, 78 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT122: lodged → approved23: lodged → refused15: lodged → withdrawn or invalid11: lodged → undecided115: approved → approved20: refused → refused15: withdrawn or invalid → withdrawn11: undecided → undecided5 approved by the council, refused after an appeal2 approved by the council, withdrawn or invalid after an appeal2 refused by the council, approved after an appeal1 refused by the council, withdrawn or invalid after an appeal78: approved → no start notice found18: approved → built, owner opted out18: approved → started, not signed off3: approved → signed off171 lodged171 lodged122 approved122 approved23 refused23 refused15 withdrawn or invalid15 withdrawn or invalid11 undecided11 undecided117 approved117 approved25 refused25 refused18 withdrawn18 withdrawn11 undecided11 undecided78 no start notice found78 no start notice found18 built, owner opted out18 built, owner opted out18 started, not signed off18 started, not signed off3 signed off3 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured171 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    4 deadlines within 500 m; the first closes 4 Nov 2026.

    4 deadlines in the next 30 days: 2026-11-04 WEB3009/26: REFUSE RETENTION PERMISSION — RETENTION : The development consists of the retention of the construction of 1-bedroom residential unit and flat roofed ; 2026-11-11 ACP 324344: Allow appeal amend conditions; 2026-11-26 WEB3599/26: application received — PROTECTED STRUCTURE: RETENTION For a total of 16 solar panels on the roof comprising 8 no. panels to front roof (south),; 2026-11-26 WEB3595/26: application received — The development will consist of a new 1-bedroom residential unit over the ground floor commercial unit, new gable roof atoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecWEB3009/26: REFUSE RETENTION PERMISSION — RETENTION : The development consists of the retention of the construction of 1-bedroom residential unit and flat roofed · 456 m away · 2026-11-04ACP 324344: Allow appeal amend conditions · 158 m away · 2026-11-11WEB3599/26: application received — PROTECTED STRUCTURE: RETENTION For a total of 16 solar panels on the roof comprising 8 no. panels to front roof (south), · 184 m away · 2026-11-26WEB3595/26: application received — The development will consist of a new 1-bedroom residential unit over the ground floor commercial unit, new gable roof a · 456 m away · 2026-11-26
    Comments closeTime to appeal endsHigh Court window ends
    • Time to appeal ends 4 Nov 20263 days left
      WEB3009/26 · REFUSE RETENTION PERMISSION — RETENTION : The development consists of the retention of the construction of 1-bedroom…
      €220 to An Coimisiún Pleanála (€110 observer) · 456 m away
    • Time to ask the High Court for a review ends 11 Nov 202610 days left
      Allow appeal amend conditions
      158 m away
    • Comments close 26 Nov 202625 days left
      1WEB3599/26 · application received — PROTECTED STRUCTURE: RETENTION For a total of 16 solar panels on the roof comprising 8 no.…
      €20 to the council · 184 m away
    • Comments close 26 Nov 202625 days left
      2WEB3595/26 · application received — The development will consist of a new 1-bedroom residential unit over the ground floor…
      €20 to the council · 456 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    41 homes 455 m away were approved Apr 2022 with no start notice yet; the permission runs to Apr 2027. DART+ West is planned 324 m away.

    Spring Garden Street and… · 41 homes: 41 homes approved, not started; runs out Apr 2027; 17-19 Richmond Avenue · 27 homes: 27 homes approved Apr 2024, not started; DART+ West, DART+ West:…: railway order granted (July 2024)202220232024202520262027202820292030Spring Garden Street and… · 41 homes455 m · 2320/2141 homes approved, not started; runs out Apr 202741 homes approved, not started; runs out Apr 202717-19 Richmond Avenue · 27 homes120 m · 3657/2127 homes approved Apr 2024, not started27 homes approved Apr 2024, not startedDART+ West, DART+ West:…324 m · plannedrailway order granted (July 2024)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 9 within 500 m

    Derelict building 4

    • 427 Richmond Avenue Dublin 3; 29 Richmond Avenue Dublin 3; 21 Richmond Avenue Dublin 3 D03A9C2 · derelict since Dec 2012 · 137 m
    • 647/49 Fairview Strand Dublin 3 D03E271 · derelict since Apr 2026 · 159 m
    • 718 Cadogan Road Dublin 3 D03K650 · derelict since Jul 2022 · 295 m
    • 2 ANNESLEY PLACE DUBLIN 3 D03T620 · derelict since Apr 2025 · 473 m

    Approved, not started, approval running out 1

    Approved, not started 1

    Empty land zoned for homes 3

    • 120.2 ha zoned for homes · no homes built on it yet · 246 m
    • 130.1 ha zoned for homes · no homes built on it yet · 425 m
    • 140.6 ha zoned for homes · no homes built on it yet · 456 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 25 and 34 a year; busiest 2022. 84% of decisions were approvals.

    2021: 30, 2022: 34, 2023: 25, 2024: 28, 2025: 30, 2026: 240102030402021: 24 approved2021: 3 refused2021: 3 withdrawn or invalid30’21*2022: 26 approved2022: 7 refused2022: 1 undecided34’222023: 20 approved2023: 5 refused25’232024: 24 approved2024: 4 refused28’242025: 22 approved2025: 3 refused2025: 5 withdrawn or invalid30’252026: 6 approved2026: 1 refused2026: 7 withdrawn or invalid2026: 10 undecided24’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 30 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 22 in the last 12 months
    1 signed off as finished11 not signed off10 no sign-off needed
    • 10Former Dublin City Council Depot, Orchard Road, Drumcondra, Dublin 3, Dublin 3 · 2 Nov 2026 · 38 homes · start notice not signed off · 4067/24 · 152 m
    • Unit 1, The Distillery Building, Distillery Road, Dublin 3, D03 X7N3 · 16 Sept 2026 · start notice not signed off · WEB2002/26 · 424 m
    • Richmond Road, Fairview, Dublin 3., Dublin · 11 Aug 2026 · 811 homes · start notice not signed off · LRD6009/23-S3 & WEBLRD6104/26-S3A · 476 m
    • 11Convent Avenue, Richmond Road, Fairview, Dublin 3, Dublin 3 · 4 Aug 2026 · 7-day notice not signed off · LRD6009/23-S3 & LRD6015/26-S3 · 195 m
    • 44 Philipsburgh Avenue, Dublin 3, D03 CK03 · 24 Jun 2026 · short notice no sign-off needed · WEB1496/26 · 251 m
    • 35 Clonliffe Gardens, Dublin 3, D03 DW08 · 18 Jun 2026 · short notice no sign-off needed · 335 m
    • 22 Clonliffe Road, Dublin 3, D03 PD32 · 11 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 3337/25 · 241 m
    • Convent Avenue,, Richmond Road, Fairview, Dublin 3, Dublin 3, D03 V3P0 · 8 Jun 2026 · 7-day notice not signed off · LRD6009/23-S3 · 320 m
    • 34 Cadogan Road, Dublin, Dublin 3, D03 XY07 · 25 May 2026 · short notice no sign-off needed · WEB1135/26 · 257 m
    • Brooklawn House, Fairview,, Dublin 3, D03 V3P0 · 7 May 2026 · short notice no sign-off needed · LRD6009/23-S3 · 284 m
    • St Vincent’s Hospital, Convent Avenue,, Richmond road, Fairview Dublin 3, Dublin 3 · 1 May 2026 · 7-day notice not signed off · LRD6009/23-S3 · 337 m
    • Richmond Road, Fairview, Dublin 3., Dublin 3 · 9 Apr 2026 · 811 homes · start notice not signed off · LRD6009/23-S3 · 248 m
    • Richmond House, Dublin 3, D03 V3P0 · 8 Apr 2026 · short notice no sign-off needed · LRD6009/23-S3 · 279 m
    • 157 Richmond Road, Fairview, Dublin 3, Dublin · 31 Mar 2026 · 811 homes · start notice not signed off · LRD6009/23-S3 · 401 m
    • 126 Tolka Road, Drumcondra, Dublin 3 · 3 Mar 2026 · 1 homes · start notice not signed off · WEB2129/25 · 255 m
    • 157 Richmond Road, Fairview, Dublin 3., Dublin 3 · 2 Mar 2026 · 779 homes · start notice not signed off · LRD6009/23-S3 · 273 m
    • Richmond Road, Fairview, Dublin 3., Dublin 3 · 2 Mar 2026 · start notice not signed off · LRD6009/23-S3 · 250 m
    • 1 Edges Corner, Fairview, Dublin, Dublin 3 · 2 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · WEB2216/25 · 191 m
    • 65 Shelmartin Avenue, Marino, Dublin 3, D03 P9C0 · 27 Jan 2026 · short notice no sign-off needed · WEB1158/25 · 477 m
    • 72 Ballybough Road, Dublin, Dublin 3, D03 YX59 · 9 Dec 2025 · 2 homes · 7-day notice signed off · EXEMPT DEVELOPMENT · 497 m
    • 14 Fairview Green, Dublin 3, D03 T8K3 · 25 Nov 2025 · short notice no sign-off needed · WEB1908/25 · 460 m
    • 124 Shelmartin Avenue, Dublin 3, D03 T8P3 · 14 Nov 2025 · short notice no sign-off needed · WEB2250/25 · 335 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 78 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Fairview Close · 22 applications in 10 years · 77% approved · most common: attic conversion / dormer

    Developments within 1.0 km

    SchemeHomesProgressDistance
    61-65 Fairview Strand and 3 Esmond Avenue8282 not started (2026-Q2)59 m
    9/9a Richmond Avenue2828 being built (2026-Q2)63 m
    17-19 Richmond Avenue2121 not started (2026-Q2)92 m
    19 and 21 Esmond Avenue2121 not started (2026-Q2)96 m
    St. Vincent's Hospital Site779283 being built · 496 not started (2026-Q2)157 m
    Richmond Road and Convent Avenue104104 not started (2026-Q2)177 m
    Former Leydens Wholesalers & Distributors107107 not started (2026-Q2)297 m
    45-47 Fairview Avenue Lower25no activity on site reported (2025-Q4)425 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Lullaby's Creche & Montessori · Crèche15 Apr 2025 · report · Tusla Early Years Inspectorate64 m
    Fairview Creche and Montessori · Crèche3 Jul 2025 · report · Tusla Early Years Inspectorate212 m
    Hyde & Seek Childcare (Tolka Road) · Crèche5 Jun 2026 · report · Tusla Early Years Inspectorate298 m
    Links Childcare · Crèche24 Jun 2025 · report · Tusla Early Years Inspectorate412 m
    Larkin Early Education Service · Crèche11 Mar 2026 · report · Tusla Early Years Inspectorate456 m
    First Steps Creche and Montessori · Crèche9 Sept 2024 · report · Tusla Early Years Inspectorate529 m
    Larkin Childcare Facility · Crèche15 Aug 2024 · report · Tusla Early Years Inspectorate611 m
    Lullabys Montessori & Afterschool · Crèche13 May 2025 · report · Tusla Early Years Inspectorate627 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here185
    Council middle52
    Homes started
    Here1,840
    Council middle109
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    3% of homes built before 1971 (council 52%). 8% owner-occupied (council 47%).

    Homes built before 1971
    3% · council 52%
    Homes built since 2001
    90% · council 19%
    Owner-occupied
    8% · council 47%
    Rented
    90% · council 45%
    Children under 15
    13% · council 15%
    Aged 65 and over
    1% · council 13%
    Households with 2+ cars
    11% · council 19%
    Work mainly from home
    13% · council 12%
    This small area (369 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268058011/02

    Bus
    140 m
    Fairview Strand · 73 · busiest stop within 500 m: 43 an hour at peak
    Planned
    324 m
    DART+ West, DART+ West: Connolly - Maynooth
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Yes
    OPW flood map area within 100 m
    Nearest school
    249 m
    St Joseph'S Adolescent School, 11 pupils
    Homes sold nearby
    143
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • St Joseph'S Adolescent School · primary · 11 pupils · 249 m
    • St Marys NS · primary · 212 pupils · 280 m
    • St Columbas NS Mxd · primary · 90 pupils · 543 m
    • St Josephs C.B.S. · postprimary · 310 pupils · 581 m
    • St Joseph¿s Primary School, An Edmund Rice School · primary · 116 pupils · 615 m
    • Marino College · postprimary · 297 pupils · 724 m
    • S N San Vinseann Cailin · primary · 208 pupils · 747 m
    • Scoil Ui Chonaill Boys Seniors · primary · 155 pupils · 774 m

    Stops 47

    • Fairview Strand · 73 · 5/hour at peak · 140 m
    • Philipsburgh Ave · 42n, 73 · 5/hour at peak · 161 m
    • Philipsburgh Ave · 73 · 5/hour at peak · 179 m
    • Melrose Avenue · 42n, 73 · 5/hour at peak · 231 m
    • Clonliffe Ave · 42n, 73 · 5/hour at peak · 334 m
    • Clonliffe Ave · 73 · 5/hour at peak · 340 m
    • Annesley Br Road · 29n, 31n · 366 m
    • North Strand FS · 130, 14, 15, 27, 27A, 27B · 43/hour at peak · 409 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Joseph'S Adolescent School · 249 m+22.2% pupils (11)
    • St Marys NS · 280 m+2.9% pupils (212)
    • St Columbas NS Mxd · 543 m-1.1% pupils (90)
    • St Josephs C.B.S. · 581 m+17.9% pupils (310) · temporary classrooms 2024, approved
    • St Joseph¿s Primary School, An Edmund Rice School · 615 m+0.9% pupils (116) · temporary classrooms 2024, approved
    • Marino College · 724 m+7.2% pupils (297)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 0.46 ha · 130 m
    • Dublin City Council · 0.15 ha · 135 m
    • Dublin City Council · 0.12 ha · 173 m
    • An Post · 0.15 ha · 308 m
    • Dublin City Council · 21.32 ha · 375 m
    • Dublin City Council · 0.7 ha · 397 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Flood risk area within 100 m: can you insure it?
      Ask for: A flood-cover quote before sale agreed.
      Insurer
    2. 27 homes approved 120 m away (17-19 Richmond Avenue), not started: what is planned?
      Ask for: The planning file for 3657/21.
      Council
    3. Application 184 m away open for comments until 26 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Drumcondra South A
    Electoral area
    Clontarf
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • Zoned M1 (metro / rail economic corridor); not protected; no vacant land tax; flood risk area within 100 m.
    • 9 sites nearby could change: 4 derelict, 2 approved schemes, 3 empty zoned plots.
    • 2 applications open for comments nearby; nearest closes 26 Nov 2026.
    • 78 homes approved nearby, not started; largest 41 at Spring Garden Street and Nos. 2.
    • North Strand FS (bus 130, 14) 458 m away: 46 an hour at morning peak; 170 from all stops within 500 m. Planned: DART+ West 324 m away, railway order granted (July 2024).
    • Here (2022 census): 90% rent (council 45%); 6% of homes empty (council 8%); most built 2001–2010; 23% drive to work (council 28%); population up 17% since 2016.
    • 7 home extensions within 250 m since 2025. Most were dormers or attic conversions. On Fairview Close: 8 in 10 years, 77% approved.
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    What the terms mean 10 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 35
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 16:21 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.